Tender Value
₹6.6 Cr
EMD Value
₹13.3 L
Closing Date
11 Sept 2026, 3:00 pm
No
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
POWER
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N crores or V, whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Bid Capacity: The tender/technical bid will be evaluated based on bid capacity formula detailed as Annexure-VI. No Technical and Financial credentials are required for tenders having advertised value up to Rs 50 lakh. Tenderer must fulfil Clause 10 of GCC: April 2022 with latest ACS.
(a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. Similar nature of work shall mean: "As specified in IREPS window given below." (b)(1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories o f work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre- defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. Special Note:- Tenderer must fulfil Clause 10 of GCC: April 2022 with latest ACS.
Defination of Similar Work :- Execution of any works of overhead or underground Transmission line of voltage of 33KV or above
6 conditions · 3 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
In support of their credentials, the Tenderers should submit along with their tenders document - List of works completed in the last three financial years giving description of work, organization for whom executed, approximate value of contract at the time of award, date of award and date of scheduled completion of work, date of actual start, actual completion and final value of contract. Supportive documents/certificates from the organizations with whom worked/are working should be enclosed. A proper balance sheet for turn over from the paying / contracting authorities with list of contractual payment made to the party during qualifying period should be enclosed along with offer for verification.
Tenderer is advised that the Contractual Turnover shall be clearly mentioned in Annexure-VIB (containing Annual Contractual Turnover Data for the Previous 3/4 Years) and Audited Balance Sheet.
Work experience certificate issued by Central Govt. /State Govt./Semi Govt. Organizations/Authorities, PSUs Govt. of India/State Govt. shall only be considered .Certificate issued from Private Individual/Private firms will not be considered
Modification, design, laying and commissioning of HT & LT Electrical crossings/ line infringements in the section of Godhra-Ratlam, in connection with Vadodara - Ratlam section Quadrupling project of Ratlam Division, Western Railways
EL-C-RTM-2026-07-T~WR
EL-C-RTM-2026-07-T
Open
Works - General
24 Months
Ratlam, Madhya Pradesh
₹0
₹13.3 L
12 Aug 2026
12 Aug 2026
28 Aug 2026
111 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 6,63,63,506.87 | ||
| — | 74.00 | — | — | ||
| Draw the existing/Modified 33KV,11KV&440V LT Over head line of MPPKVCL& Railway | — | — | — | 1,92,224.62 | |
| — | 45.00 | — | — | ||
| Supply and erection of M.S. H-Beam 150x150 mm Pole of 13 Mtrs. Long for stud complete with pit, foundation painting etc. | — | — | — | 15,17,111.1 | |
| — | 150.00 | — | — | ||
| Supply and erection of M.S. H-Beam 150x150 mm Pole of 11 Mtrs. Long for stud complete with pit, foundation painting etc. | — | — | — | 41,05,132.5 | |
| — | 175.00 | — | — | ||
| Supply & erection of RS Joist 175x85 mm pole of 9 mtrs long complete with pit foundation , painting etc. | — | — | — | 23,13,858.75 | |
| — | 90.00 | — | — | ||
| Supply & erection of 11KV HT Cross Arm 'V' Type & Top clamp. | — | — | — | 46,869.3 | |
| — | 27.00 | — | — | ||
| Supply & erection of 33KV HT Cross Arm 'V' Type & Top clamp. | — | — | — | 27,675.54 | |
| — | 3504.00 | — | — | ||
| Supply and fixing of M.S.channel 100x50x5 mm on existing structures including clamps and hardwares etc | — | — | — | 8,17,623.36 | |
| — | 290.00 | — | — | ||
| Supply and erection of stay set with 16 mm stay rod, stay clamp, straining screw, stay wire & G.I. Pipe etc. | — | — | — | 2,53,016.3 | |
| — | 45.00 | — | — | ||
| Supply and erection of stay set with 20 mm stay rod, stay clamp, straining screw, stay wire & G.I. Pipe etc. | — | — | — | 58,349.25 | |
| — | 90.00 | — | — | ||
| SETC of 11 KV 200 Amps AB switch assembly complete. | — | — | — | 5,81,628.6 | |
| — | 18.00 | — | — | ||
| SETC of 33 KV 200 Amps AB switch assembly complete. | — | — | — | 2,32,115.22 | |
| — | 90.00 | — | — | ||
| SETC of 11 KV 200 Amps D. O . Fuse assembly complete. | — | — | — | 7,85,473.2 | |
| — | 18.00 | — | — | ||
| SETC of 33 KV 200 Amps D. O . Fuse assembly complete. | — | — | — | 4,30,517.52 | |
| — | 180.00 | — | — | ||
| Supply and erection of 11 KV, 45KN Disc type insulators including hard wares etc. | — | — | — | 66,958.2 | |
| — | 270.00 | — | — | ||
| Supply and erection of 11 KV, 10KN Pin type insulators including pin & hard wares etc. | — | — | — | 36,925.2 | |
| — | 54.00 | — | — | ||
| Supply and erection of 33 KV, 45KN Disc type insulators including hard wares etc. | — | — | — | 78,412.32 | |
| — | 81.00 | — | — | ||
| Supply and erection of 33 KV, 10KN Pin type insulators including pin & hard wares etc. | — | — | — | 34,416.9 | |
| — | 1500.00 | — | — | ||
| AAAC Rabbit conductor 0.05 sq. inch. (55 sq.mm. Al.Eq.) | — | — | — | 70,785 | |
| — | 6000.00 | — | — | ||
| ACSR Rabbit conductor 0.05 sq. inch (55 sq.mm. Al.Eq.), (6/.3.35 +1/3.35 mm) | — | — | — | 3,19,500 | |
| — | 3600.00 | — | — | ||
| Supply and erection of AAAC dog conductor (0.10 inch²) 100 mm² Al equivalant, as per MPPKVVCL . | — | — | — | 1,68,624 | |
| — | 120.00 | — | — | ||
| SETC of Cable jointing/ termination kit suitable for 11 KV (E) 3C upto 400 mm² XLPE cable. | — | — | — | 10,36,186.8 | |
| — | 36.00 | — | — | ||
| SETC of Cable jointing/ termination kit suitable for 33KV (E) 3C upto 400 mm² XLPE cable. | — | — | — | 9,64,222.2 | |
| — | 140.00 | — | — | ||
| SETC of Cable jointing/ termination kit suitable for 4C upto 400 mm² XLPE LT cable. | — | — | — | 4,86,474.8 | |
| — | 296.00 | — | — | ||
| Supply, erection, testing and commissioning of earthing arrangment using 40 mm G.I. Pipe electrode with 8 SWG GI. wire from earth electrode to nearest structure or dist. Board | — | — | — | 6,36,065.52 | |
| — | 370.00 | — | — | ||
| Supply and erection of Earth coil of 8 SWG G.I wire including connection to pole. | — | — | — | 77,307.8 | |
| — | 888.00 | — | — | ||
| Supply and erection of 6 SWG GI wire with necessary hardwares. | — | — | — | 53,830.56 | |
| — | 305.00 | — | — | ||
| Supply and provision of cable route Marker for 11KV & 33 KV line | — | — | — | 34,785.25 | |
| — | 61.00 | — | — | ||
| Provision of Concrete for cable route marker in 1:3:6 ration @ 0.2 Cum/ cable marker | — | — | — | 1,59,338.1 | |
| — | 370.00 | — | — | ||
| Supply and fixing of Danger board 33 KV or 11 KV. | — | — | — | 39,397.6 | |
| — | 370.00 | — | — | ||
| Supply and fixing of Anti climbing device assembly. | — | — | — | 84,767 | |
| — | 60.00 | — | — | ||
| Supply, erection, testing and commissioning of Lightening Arrestor 11 KV complete set of 3 Nos. | — | — | — | 1,81,380 | |
| — | 18.00 | — | — | ||
| Supply, erection, testing and commissioning of Lightening Arrestor 33 KV complete set of 3 Nos. | — | — | — | 69,438.6 | |
| — | 15400.00 | — | — | ||
| Laying , testing & commissioning of 1.1 kv LT XLPE cables of various size upto 400 sq mm in existing trench ,RCC pipe,GIpipe or air.(cable will be supplied by Railway) | — | — | — | 5,17,748 | |
| — | 15600.00 | — | — | ||
| Laying, testing and commissioning of 11/33KV(E) XLPE 3 core cable upto 400 mm² in existing trench/ GI/ CI/ RCC pipe or in air (cable will be supplied by railway) | — | — | — | 15,03,840 | |
| — | 7850.00 | — | — | ||
| Drilling of horizontal bore below track by pushing method for laying of GI/CI/ spun concrete pipes of various sizes upto 450 mm dia. | — | — | — | 2,54,49,857 | |
| — | 2100.00 | — | — | ||
| Supply and laying of HDPE pipe 160 mm dia. below the track. | — | — | — | 14,90,328 | |
| — | 13000.00 | — | — | ||
| Supply and laying of HDPE pipe 110-120 mm dia. below the track | — | — | — | 42,07,970 | |
| — | 1560.00 | — | — | ||
| Supply and laying of 110-125 mm dia "B" class GI pipe with necessary bends and clamps. | — | — | — | 51,48,296.4 | |
| — | 216.00 | — | — | ||
| Supply and laying of 150 mm dia "B" class GI pipe with necessary bends and clamps. | — | — | — | 5,28,521.76 | |
| — | 1780.00 | — | — | ||
| Supply laying of RCC Pipe 150 mm dia | — | — | — | 3,81,044.6 | |
| — | 140.00 | — | — | ||
| Supply and erection of LT cross arm 4 pin with 3 shackle insulator and earth knob. | — | — | — | 1,00,434.6 | |
| — | 3500.00 | — | — | ||
| SETC of LT XLPE Arial bunch xlpe cable 3x70 + 1x16 + 1x50 sq mm with aluminiun alloy Bare messanger wire as per MPPKVVCL item. | — | — | — | 5,44,495 | |
| — | 3500.00 | — | — | ||
| Supply and stringing of cradle guarding on existing cross arm/channel. | — | — | — | 42,070 | |
| — | 9620.00 | — | — | ||
| Excavation of trench 500 mm wide and 1000 mm deep in all type of soil. | — | — | — | 8,21,067 | |
| — | 70.00 | — | — | ||
| Shifting of 11/.4 KV transformer up to 100 KVA to new DP structure erected againest item no 3 with supply and erection of necessory mounting arragements except channel. | — | — | — | 3,84,468 | |
| — | 17500.00 | — | — | ||
| Dismantling & removal of existing Rail or PCC or RSJ poles complete in all respect including all fixtures released materials shall be handed over to the concerned area stores of MPPKVVCL with joint signature & receipt. | — | — | — | 2,85,250 | |
| — | 2290.00 | — | — | ||
| Dismantling and removal of existing HT overhead lines span complete in all respect including all fixtures i.e. GI wire, channels, brackets, gaurding channels etc. (Released material shall be handed over to concerned area stores of MPPKVVCL with joint signature and reciept.) | — | — | — | 32,357.7 | |
| — | 35.00 | — | — | ||
| Supply and Erection of BIS certified Energy Efficient Level-III (old)/Level-II (new) Conventional 11/.433 KV 25KVA Distribution transformer . | — | — | — | 25,92,586.15 | |
| — | 35.00 | — | — | ||
| Supply & erection of LT distribution board for 25 KVA transformer suitable for outdoorapplication. It also includes supply of suitable MS channel, nut, bolts, clamps etc. for its fixing/erectionon the DP structure and electrical connection | — | — | — | 3,57,202.3 | |
| — | 30.00 | — | — | ||
| Supply and Erection of BIS certified Energy Efficient Level-III (old)/Level-II (new) Conventional 11/.433 KV 63KVA Distribution transformer . | — | — | — | 33,80,282.7 | |
| — | 30.00 | — | — | ||
| Supply & erection of LT distribution board for 63 KVA transformer suitable for outdoor applicationwith isolator switch of 200Amps TPN with HRC fuses on incoming side and 6nos.SP MCCB of 60Amp onoutgoing side. It also includes supply of suitable MS channel, nut, bolts, clamps etc. for itsfixing/erection on the DP structure and electrical connection. | — | — | — | 4,91,324.1 | |
| — | 9.00 | — | — | ||
| Supply and Erection of BIS certified Energy Efficient Level-III (old)/Level-II (new) Conventional 11/.433 KV 100KVA Distribution transformer . | — | — | — | 11,51,858.34 | |
| — | 9.00 | — | — | ||
| Supply & erection of LT distribution board for 100 KVA transformer suitable for outdoor application with isolator switch of 300Amps TPN with HRC fuses on incoming side and 6nos.SP MCCBof 90Amp on outgoing side. It also includes supply of suitable MS channel, nut, bolts, clamps etc. forits fixing/erection on the DP structure and electrical connection. | — | — | — | 1,66,427.55 | |
| — | 5450.00 | — | — | ||
| Supply and stringing of ACSR conductor 6/1/2.50mm & 1/2.59mm steel wire on existing cross arm including split insulator. | — | — | — | 1,26,167.5 | |
| — | 74.00 | — | — | ||
| Co-ordination/ liasoning and chasing with State Utility Company for availing new electrical connection/ augmentation of sanctioned load at stations, level crossings etc. including applying for load, collection of estimates for loads, modification of power line crossings, arranging payment from EL/Construction, depositing payment to State Utility Company, arranging release of load & other related works, payment to be made to SEB for new connection, load augmentation, modification of power line crossings etc. | — | — | — | 6,99,499.06 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
tenderdocument202607T13072026.pdf Tender document
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
ACS1to11_compressed.pdf
ATTACHMENT
tenderdocument202607T13072026.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].