Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹9.0 L
Closing Date
26 Aug 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RNB Division
SUMBAL SONAWARI
Restoration of road surface by way of G-III and OGPC in patches/stretches of Sumbal Singhpora Road.
2021_PWDJK_135219_4
NIT NO 71 OF 2021-22/SUMBAL SONAWARI
Open Tender
Civil Works
Item Rate
30 days
SUMBAL SONAWARI
Please refer Tender documents.
4 documents required · 4 mandatory
₹600
Yes
Executive Engineer RNB Division
Exempted
27 Aug 2021
18 Aug 2021
27 Aug 2021
18 Aug 2021
26 Aug 2021
18 Aug 2021
120 days
Amount
Scarifying the existing bitumen roadsurface to a depth of 50mm and disposal of scarfying material with all leads and lifts upto 1 Km (by mechanical means) Complete.
Supply, Stacking , Laying , Spreading and compacting 75mm thick stone aggregate of size range 53.22.4 mm size including screening of size range 11.2mm , supply and stacking of binding material that is Khak Bajree including laying Water Bound Macadam, with specified stone aggregate/stone screening/binding material/Moorum/Crusher dust, including sorting and consolidation with Power road roller 8-10 Tonne Capacity in stages to proper grade and camber , compacting to the required density, including cost ad carriage of materials to site of work, with all leads, lifts , loading , unloading , stacking , haulage and octori taxes.(Finished work to be measured , Complete) as per Clause 405 of MOST Specifications .(Crushed from Broken Quarry.)
Providing laying and rolling with 80-100 KN roller 2cm thick compacted premix carpet surfacing using bitumen of grade 80/100 @ 1.44 Kg/Sqm of road surface using stone chipping @ 0.027 Cum/Sqm 13.2mm size @ 0.018 Cum and 11.2mm size @ 0.009 Cum/Sqm including providing/laying and rolling with 80-100 KN roller seal coat of premixed fine aggregate using bitumen @ 0.768 Kg/Sqm of road surface using stone grit/sand @ 0.006 Cum /Sqm all inclusive including preparing surface for tack coat by wire brushing brosusing and fanning the surface with gunny bags to remove mud, loose dirt and dust by compressed air, providing and applying premix/tack coat @ 0.75 Kg of bitumen/Sqm on WBM surface using hot straight run bitumen of grade 80/100 over prepared surface including dust and carriage of tar and all charges on account of tools, plants equipments and all allied machinery, labour taxes, fee, testing charges for maintaining quality control during and other excavation of work complete in all respects. Complete Manually
M/s AJAZ RASHID GILKAR
ZUBAIR UL ISLAM
AASIF MAJEED WANI
stage.html
html • 0.02 MB
finance_270823.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .