Tender Value
₹61.0 L
EMD Value
₹1.2 L
Closing Date
17 Aug 2026, 5:00 pmClosed
Pardeep Kalyan
Municipal Corporation Karnal
Annual maintenance of pumping machinery of existing 81 Nos.tubewell/ Boosting Station for Zone- II i.e. ward no. 01 to 05,06 Partial (Kambopura, Daha, Sirsi, Madanpur) and ward 17 to 20 falling under M.C karnal. (For one year)(Only for L/C Societies)
2026_HRY_539923_1
20260A60FB42 19C9 4861 8DFD 73FD4999BEDB747ULB
Open Tender
Civil Works
Works
365 days
Karnal
2 documents required · 2 mandatory
₹5,000
₹1.2 L
Yes
10 Aug 2026
10 Aug 2026
18 Aug 2026
10 Aug 2026
17 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and fixing of generating set of 360 KVA including Its connection temporary for operating pumping setsat site etc. complete in all respect | 30 | NO. | - | - |
| 2 | Plugging and de-plugging of 1600 mm dia incoming sewer lines to be connected with last Manhole prior to MPS and re-plugging the same after furnishing the entire work complete in all respects to the entire satisfaction of the Engineer in charge. | 70 | Nos. | - | - |
| 3 | Plugging and de-plugging of 1600 mm dia incoming sewer lines to be connected with last Manhole prior to MPS and re-plugging the same after furnishing the entire work complete in all respects to the entire satisfaction of the Engineer in charge. | 30 | Nos. | - | - |
| 4 | Construction of Pumping Stations as per the scope, specifications and drawings of DNIT, consisting of:
i. RCC Receiving Chamber
ii. Sluice Gates
iii. Screening Chamber with RCC staircase.
iv. Mechanical Screens
v. Wet Well with compartment.
vi. Pumping Sets with Delivery pipe
vii. Rising main
viii. Lifting Arrangement (includes column, Girder, Chain pully Block etc.)
ix. Pipe Gallery for housing common header pipe, sluice valves, NRV, and dismantling joint, including specials.
x. Transformer with foundation.
xi. Diesel Generating Set with platform and shed.
xii. Panel Room with office and toilet facilities.
xiii. Electric Control Panel Board
xiv. Electric cabling, including connecting to Existing Substations, if any.
xv. Automation.
xvi. Metering room
xvii. Street Lighting.
xviii. Internal Roads with drainage.
xix. External sewerage.
xx. Furniture
xxi. Storage Room
xxii. Boundary Wall etc.
xxiii. Any other item required for the completion and satisfactory working of Pumping Stations.
Sewage Pumping Station 90 MLD Peak Flow | 30 | Nos. | - | - |
| 5 | Dewatering of leaked sewage water during the construction of a new manhole from the second last manhole. | 30 | Nos. | - | - |
| 6 | Operation and maintenance cost for entire sewer line system created under the contract which includes Basic Service Charges having expenditure and expenses required to be incurred on labour, repair and/or replacement of materials, equipments, consumable items, fuel, water and all other matters and items of whatsoever nature, essential and desirable to run the system satisfactory, Administration and Management, Running of Office, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, Consumables as per Scope of Work and terms and conditions of contract etc. complete
For Fifth Year | 75 | Job | - | - |
| 7 | Operation and maintenance cost for entire sewer line system created under the contract which includes Basic Service Charges having expenditure and expenses required to be incurred on labour, repair and/or replacement of materials, equipments, consumable items, fuel, water and all other matters and items of whatsoever nature, essential and desirable to run the system satisfactory, Administration and Management, Running of Office, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, Consumables as per Scope of Work and terms and conditions of contract etc. complete
For Fourth Year | 300 | Per Metre | - | - |
| 8 | Operation and maintenance cost for entire sewer line system created under the contract which includes Basic Service Charges having expenditure and expenses required to be incurred on labour, repair and/or replacement of materials, equipments, consumable items, fuel, water and all other matters and items of whatsoever nature, essential and desirable to run the system satisfactory, Administration and Management, Running of Office, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, Consumables as per Scope of Work and terms and conditions of contract etc. complete
For Third Year | 60 | Nos. | - | - |
| 9 | Operation and maintenance cost for entire sewer line system created under the contract which includes Basic Service Charges having expenditure and expenses required to be incurred on labour, repair and/or replacement of materials, equipments, consumable items, fuel, water and all other matters and items of whatsoever nature, essential and desirable to run the system satisfactory, Administration and Management, Running of Office, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, Consumables as per Scope of Work and terms and conditions of contract etc. complete
For Second Year | 6 | Nos. | - | - |
| 10 | Operation and maintenance cost for entire sewer line system created under the contract which includes Basic Service Charges having expenditure and expenses required to be incurred on labour, repair and/or replacement of materials, equipments, consumable items, fuel, water and all other matters and items of whatsoever nature, essential and desirable to run the system satisfactory, Administration and Management, Running of Office, Comprehensive Operation, Maintenance and Repairs including Preventive Maintenance, Consumables as per Scope of Work and terms and conditions of contract etc. complete
For First Year | 1,800 | Per Metre | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_619203.xls
BOQ • 0.34 MB
DM1338Z174312.pdf
Additional Documents • 2.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .