Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC AS PER BOQ |
| 2 | L2₹1.4 Cr+₹5.2 L (4.00%)Rejected-AOC | ₹1.4 Cr+₹5.2 L (4.00%) | L2 | Rejected-AOC AS PER BOQ |
| 3 | L3₹1.6 Cr+₹25.3 L (19.3%)Rejected-AOC | ₹1.6 Cr+₹25.3 L (19.3%) | L3 | Rejected-AOC AS PER BOQ |
| 4 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹3.5 L
Closing Date
2 Mar 2021, 5:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER Gandak Irrigation Work Circle-I, Gorakhpur
RECONSTRUCTION OF P.R.B. AT KM. 49.440 OF LOWER NARAYANI BRANCH IN DISTRICT MAHARAJGANJ.
2021_UPIDC_557801_7
05/SE/2020-21
Open Tender
Civil Works
Item Wise
180 days
MAHARAJGANJ
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,354
₹3.5 L
Yes
27 Apr 2022
22 Feb 2021
3 Mar 2021
22 Feb 2021
2 Mar 2021
22 Feb 2021
Amount
Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge.
Earth work for making Ramp and correction of bank, Diversion and making jeepable service road including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Laying P.C.C. 1:3:6 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (4.75 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Laying Brick ballast Concrete 1:4:8 in base for slope pitching work with cement, sonbhadra coarse sand of F.M. Not less then 2.50 and brick ballast (20 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work.
Bending, binding cutting placing in position reinforcement steel including cost of binding wire and tack welding with material and other accessories required for proper completion of work. As per direction of Engineer in Charge.
1st class brick work in 1:4 cement mortar with class brick M-150, sonbhadra coarse sand of FM. Not less then 2.50, including all cost of materials,T&P and labours and other accessories required for proper completion of work
Centering and shuttering for R.C.C. work including all cost of materials,T&P labours and other accessories required for proper completion of work.
Laying R.C.C. work in 1:1:2 (M25) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (4.75mm to 20mm.) for w.c. including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of Engineer in Charge.
Laying R.C.C. work in 1:1:2 (M25) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (4.75mm to 20mm.) for Slab, pier cap and abutment cap stir including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of Engineer in Charge.
Providing one coat of VG -30 bitumen painting with two layer of tarfelt again followed by second coat of bitumen on abutment and pier before laying R.C.C. Slab including cost of all material labour and T & P etc.
Supply and laying of 18 MM thick joint filler board in construction joint including cost of all material labour T&P required for proper completion of work.
Dismelting of old V.R.B. and proper disposal including all cost of materials,T&P and labours etc.
Dry brick on edge solling including prepration of sub-grade to prescrib camber ,filing joint with earth T&P etc.
Boring with 150 mm dia casing pipe including lowering and extension of assembly loading unloading and carraige. one boaring have 5 meter water dia water dewatering capecity so no. of including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge
Runnig of 5 H.P. genrater set pump for dewatering including arrangement of pump suction and delivery pipe and other accessories at site for proper completion of work.
Brick End Pitchting with 1:4 cement mortor including prepration of sub-grade to prescribe Slop ,filing joint including all cost of materials,T&P and labours and other accessories required for proper completion of work
Fix wheel guard stone of size 900x200x200mm including cost of all material ,labour, t&p etc. required for proper completion of work
Supply and Fixing of P.V.C. Pipe for Drainage spout and weep hole including cost of all material ,labour, t&p etc. required for proper completion of work
Sign board at site for notice both side including cost of all material ,labour, t&p etc. required for proper completion of worK.
M/S BABA TRADERS
M/S RADHIKA CONSTRUCTION COMPANY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .