Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹10.7 L+₹62,964.41 (6.26%)Accepted-Finance AT KENTAL PS KISHORENAGAR DIST CUTTACK | CUTTACK | ODISHA | 752120 | ₹10.7 L+₹62,964.41 (6.26%) | L2 | Accepted-Finance Successful tenderer on lottery system |
| 2 | L1₹10.1 LRejected-Finance AT TENTOI P O ALIKANTA DISTRICT JAGATSINGHPUR PIN 754108 | ALIKANTA | JAGATSINGHPUR | ODISHA | 754108 | ₹10.1 L | L1 | Rejected-Finance Unsuccessful tenderer on lottery system |
| 3 | L3₹11.0 L+₹93,504.03 (9.30%)Rejected-Finance MAHANADI SOUTH DIVISION NO I CUTTACK | ₹11.0 L+₹93,504.03 (9.30%) | L3 | Rejected-Finance Unsuccessful tenderer on lottery system |
| 4 | L4₹12.6 L+₹2.5 L (25.0%)Rejected-Finance AT BARISANA P O KULASHREE P S NIALI DIST CUTTACK PIN 754105 | NIALI | CUTTACK | ODISHA | 754105 | ₹12.6 L+₹2.5 L (25.0%) | L4 | Rejected-Finance Rejected as L4 bidder |
| 5 | L4₹12.6 L+₹2.5 L (25.0%)Rejected-Finance ODISHA OD | ₹12.6 L+₹2.5 L (25.0%) | L4 | Rejected-Finance Rejected as L4 bidder |
Tender Value
₹12.6 L
EMD Value
₹12,570
Closing Date
12 May 2026, 5:00 pmClosed
S.E, Mahanadi South Division-I, Cuttack
S.E, Mahanadi South Division-I, Cantonment Road, Cuttack-753001
Construction of VRB at RD 14480.0M of Disty-12 main of Taladanda canal System
2026_CELBB_128526_2
MSD_TCN_02/2026-27
Open Tender
Civil Works - Others
Percentage
180 days
CUTTACK
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹12,570
Yes
31 Aug 2026
28 Apr 2026
13 May 2026
28 Apr 2026
12 May 2026
28 Apr 2026
28 Apr 2026 - 5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Earth work excavation of foundation in all kind of soil including rough dressing breaking the clods & leveling the bed and sides and depositing the excavated materials away from work site with all leads, lifts, delifts, cost of labour, T&P, cess, taxes etc. complete as per direction of Engineer-in-charge. | 123.55 | Per 100 Cum | - | - |
| 0_) | Filling in foundation and plinth with sand well watered and rammed including cost carriage and royalty of sand & labour charges etc. complete as per the direction of the Engineer-in-Charge | 49.52 | Per Cum | - | - |
| 0_) | CC work of M-15 grade with 40mm and down graded black hard granite (crusher broken) stone chips including hoisting and laying including cost, carriage, royalty and taxes of all materials etc. complete as directed by the Engineer-in-charge. | 50.66 | Per Cum | - | - |
| 0_) | CC work of M-15 grade with 20mm and down graded black hard granite (crusher broken) stone chips including hoisting and laying including cost, carriage, royalty and taxes of all materials etc. complete as directed by the Engineer-in-charge. | 63.79 | Per Cum | - | - |
| 0_) | Rigid and smooth centering and shuttering for R.C.C work including false work and dismantling them after casting including cost, carriage of all materials etc. complete as per the direction of the Engineer-in-Charge. | 197.2 | Per Sqm | - | - |
| 0_) | Collecting supplying fitting & placing uncoated HYSD reinforcement for RCC work including cutting, bending, binding and tying the grill and placing in position including cost of binding wire 18 to 20 gauge etc. complete as per the direction of the Engineer-in-Charge. | - | Per Qntl | - | - |
| 0_) | RCC work of M-20 grade with 20mm and down graded black hard granite (crusher broken) stone chips including hoisting and laying including cost, carriage, royalty and taxes of all materials etc. complete as directed by the Engineer-in-charge. | 8.12 | Per Cum | - | - |
| 0_) | Filling in foundation and plinth with excavated materials with all leads, lifts and delifts including watering, ramming sundries and T&P etc. complete as per the direction of the Engineer-in-Charge | 41.18 | Per Cum | - | - |
| 0_) | Earthwork in excavation in ordinary soil including dressing and levelling the bed and depositing the soil away from the work site with all lead , lifts and delifts etc. complete as directed by the Engineer-in-charge. | 160.65 | Per Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
02.pdf
Tender Documents • 6.55 MB
BOQ_588941.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .