| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.1 LAccepted-Finance | ₹8.1 L | 1 | Accepted-Finance Lowest Quoted |
| 2 | 2₹8.5 LAccepted-Finance | ₹8.5 L | 2 | Accepted-Finance Highest Quoted |
| 3 | Not Admitted-Fee/PreQual/Technical KUPPIDISATHAM PANCHAYAT KUPPIDISATHAM | VELLORE | TAMIL NADU | 632001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | A.Chandran L2 | A.S.Arivazhagan L1 |
|---|---|---|---|---|---|
| 1.00Reconstruction of Sluice @ Vayalur-Periya eri | |||||
| 2.00 | Clearing the scrub juncle etc completed | 390 | Cum | 6 ₹2,340 Lowest | 111.6 ₹43,524 |
| 3.00 | Earthwork in all soils and sub soils except hard rock requiring blasting with lead of 0 to 100 m by deploying earth moving machineries and tippers for formation of bund with a following lead in layers of suitable thickness, depending upon type of compaction equipment deployed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill including extra earth filling, breaking clods, watering to OMC (Optimum moisture content) and compaction of each layer to 95% of Proctor Density through deployment ofb appropriate compaction equipment (8-10T power roller), vibratory power roller of short width (+or - 0.90m with drum) power roller of vibratory power roller ensuring compaction of designed bund section and also standard slope of front side 1.5 (Horizontal): 1 (Vertical) slope and rear side 2 (horizontal):1 (vertical) of side slopes etc., complete as directed by the Engineer in charge of works and as per the technical specifications | 280.03 | Cum | 257 ₹71,967.71 | 153 ₹42,844.59 Lowest |
| 4.00 | Dismantling the old damaged RR Masnory in cement mortor wall under3.00m hight | 19.79 | Cum | 295 ₹5,838.05 Lowest | 511 ₹10,112.69 |
| 5.00 | Dismantling the old damaged cement concrete | 25.57 | Cum | 507 ₹12,963.99 Lowest | 790.5 ₹20,213.09 |
| 6.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 10.35 | CUM | 257 ₹2,659.95 | 167 ₹1,728.45 Lowest |
| 7.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors bills as per special condition including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete | 32.98 | Cum | 5,212 ₹1,71,891.76 Lowest | 5,400 ₹1,78,092 |
| 8.00Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. | |||||
| 9.00 | Centring Below GL | 107.81 | SQM | 530 ₹57,139.3 | 297 ₹32,019.57 Lowest |
| 10.00 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to work site and including cost of cement which will be supplied and departmental section store attend the cost will be record from contractors bill at the rate of specified in the special conditions appended and including all other incidental charges etc., completed but executing cost and conveyance of steel fabrication charges and centering complete for Roof slab. | 8.16 | MT | 8,740 ₹71,318.4 | 7,250 ₹59,160 Lowest |
Tender Value
₹8.9 L
EMD Value
₹8,870
Closing Date
13 Aug 2026, 3:00 pmClosed
BDO
Peranamallur Panchayat Union
Reconstruction of Sluice at Vayalur Periya eri in Vayalur Panchayat at PERANAMALLUR PANCHAYAT UNION
2026_RDTN_688894_1
A5/2348/2025
Open Tender
Civil Works - Water Works
Item Wise
Peranamallur Panchayat Union
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,870
Yes
Peranamallur Panchayat Union
18 Aug 2026
28 Jul 2026
13 Aug 2026
28 Jul 2026
13 Aug 2026
28 Jul 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reconstruction of Sluice @ Vayalur-Periya eri | - | - | - | - |
| 2 | Clearing the scrub juncle etc completed | 390 | Cum | - | - |
| 3 | Earthwork in all soils and sub soils except hard rock requiring blasting with lead of 0 to 100 m by deploying earth moving machineries and tippers for formation of bund with a following lead in layers of suitable thickness, depending upon type of compaction equipment deployed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill including extra earth filling, breaking clods, watering to OMC (Optimum moisture content) and compaction of each layer to 95% of Proctor Density through deployment ofb appropriate compaction equipment (8-10T power roller), vibratory power roller of short width (+or - 0.90m with drum) power roller of vibratory power roller ensuring compaction of designed bund section and also standard slope of front side 1.5 (Horizontal): 1 (Vertical) slope and rear side 2 (horizontal):1 (vertical) of side slopes etc., complete as directed by the Engineer in charge of works and as per the technical specifications | 280.03 | Cum | - | - |
| 4 | Dismantling the old damaged RR Masnory in cement mortor wall under3.00m hight | 19.79 | Cum | - | - |
| 5 | Dismantling the old damaged cement concrete | 25.57 | Cum | - | - |
| 6 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 10.35 | CUM | - | - |
| 7 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors bills as per special condition including labour for mixing laying compacting curing concrete and all other incidental charges etc., complete | 32.98 | Cum | - | - |
| 8 | Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. | - | - | - | - |
| 9 | Centring Below GL | 107.81 | SQM | - | - |
| 10 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost & conveyance of all materials to work site and including cost of cement which will be supplied and departmental section store attend the cost will be record from contractors bill at the rate of specified in the special conditions appended and including all other incidental charges etc., completed but executing cost and conveyance of steel fabrication charges and centering complete for Roof slab. | 8.16 | MT | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_828107.xls
BOQ • 0.33 MB
TENDERVAYALUR.pdf
Tender Documents • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].