| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | ₹8.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.8 LRejected-AOC 3 26A THIRUVASI VILLAGE NORTH STREET THUDAIYUR MANNACHALLUR TALUK TIRUCHIRAPPALLI DISTRICT | THUDAIYUR | TIRUCHIRAPPALLI | TAMIL NADU | ₹8.8 L | L2 | Rejected-AOC L2 |
| 3 | L3₹9.1 LRejected-AOC | ₹9.1 L | L3 | Rejected-AOC L3 |
| 4 | L4₹9.8 LRejected-AOC | ₹9.8 L | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | U.Abhishekwaran Contractor L3 | N D ENTERPRISES L4 | AIM INFRA L1 | RAMESH L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundasan | 50.09 | cum | 160 ₹8,014.4 Lowest | 263.78 ₹13,212.74 | 220 ₹11,019.8 | 263.78 ₹13,212.74 |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 35.64 | cum | 5,000 ₹1,78,200 | 5,206.34 ₹1,85,553.96 | 4,250 ₹1,51,470 Lowest | 5,206.34 ₹1,85,553.96 |
| 3.00 | Supply and errecton of sheet centring with out scupolding including all charges etc completed. | 123.12 | sqm | 500 ₹61,560 | 590.55 ₹72,708.52 | 500 ₹61,560 | 449 ₹55,280.88 Lowest |
| 4.00 | Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 35.27 | cum | 6,000 ₹2,11,620 | 5,958.98 ₹2,10,173.22 | 5,100 ₹1,79,877 | 4,327.66 ₹1,52,636.57 Lowest |
| 5.00 | Collection and supply of gritty from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc., complete | 118.58 | cum | 200 ₹23,716 Lowest | 386.45 ₹45,825.24 | 220 ₹26,087.6 | 350.66 ₹41,581.26 |
| 6.00 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 8.8 | cum | 6,200 ₹54,560 | 6,076.71 ₹53,475.05 | 4,500 ₹39,600 Lowest | 4,998.88 ₹43,990.14 |
| 7.00 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 30.11 | cum | 6,500 ₹1,95,715 | 6,502.16 ₹1,95,780.04 | 5,100 ₹1,53,561 Lowest | 6,466.66 ₹1,94,711.13 |
| 8.00 | Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc. | 63.24 | sqm | 200 ₹12,648 Lowest | 281.06 ₹17,774.23 | 240 ₹15,177.6 | 281.06 ₹17,774.23 |
| 9.00 | Painting two coats of newly plastered wall surface with ready mixed Plastic Emulsion Paint of First quality of approved colour over a Priming Coat including thorough scrapping , clean removal of dirt and including necessary | 63.24 | sqm | 100 ₹6,324 Lowest | 262.48 ₹16,599.24 | 210 ₹13,280.4 | 260.55 ₹16,477.18 |
| 10.00 | Provision for GI sheet 0.47mm thick including cost and conveyane of all labour charges etc | 18.49 | sqm | 100 ₹1,849 Lowest | 848.6 ₹15,690.61 | 820 ₹15,161.8 | 848.6 ₹15,690.61 |
Tender Value
Refer Docs
EMD Value
₹9,950
Closing Date
30 Jun 2026, 3:00 pmClosed
The Block Development officer(BP),walajah block
The Block Development office,walajah block
Construction of Threashing Floor at Anandalai H/O Anandalai Panchayat
2026_RDTN_680817_1
A2/1661/2025
Open Tender
Civil Works
Works
90 days
The Block Development office, walajah block
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,950
15 Jul 2026
15 Jun 2026
30 Jun 2026
15 Jun 2026
30 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundasan | 50.09 | cum | - | - |
| 2 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 35.64 | cum | - | - |
| 3 | Supply and errecton of sheet centring with out scupolding including all charges etc completed. | 123.12 | sqm | - | - |
| 4 | Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 35.27 | cum | - | - |
| 5 | Collection and supply of gritty from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc., complete | 118.58 | cum | - | - |
| 6 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 8.8 | cum | - | - |
| 7 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 30.11 | cum | - | - |
| 8 | Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc. | 63.24 | sqm | - | - |
| 9 | Painting two coats of newly plastered wall surface with ready mixed Plastic Emulsion Paint of First quality of approved colour over a Priming Coat including thorough scrapping , clean removal of dirt and including necessary | 63.24 | sqm | - | - |
| 10 | Provision for GI sheet 0.47mm thick including cost and conveyane of all labour charges etc | 18.49 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_818160.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_818160.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].