Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.3 LAdmitted-Fee/PreQual/Technical/Finance AT MANGAL PUR GUNTHAPADA ASKA | -23.99% | ₹22.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹23.5 L+₹1.2 L (5.42%)Admitted-Fee/PreQual/Technical/Finance | -19.87% | ₹23.5 L+₹1.2 L (5.42%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹24.0 L+₹1.8 L (7.88%)Admitted-Fee/PreQual/Technical/Finance NOT AVAILABLE | NA | NA | 121004 | -18.00% | ₹24.0 L+₹1.8 L (7.88%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹24.0 L+₹1.8 L (7.89%)Admitted-Fee/PreQual/Technical/Finance PLOT NO NS 320 IRC VILLAGE WARD NO 21 POST NAYAPALLI PS NAYAPALLI BHUBANESWAR DIST KHORDHA PIN 751015 | KHORDHA | ODISHA | 751015 | -17.99% | ₹24.0 L+₹1.8 L (7.89%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹24.6 L+₹2.3 L (10.5%)Admitted-Fee/PreQual/Technical/Finance PLOT NO N 6 356 IRC VILLAGE NAYAPALLI BHUBANESWAR DIST KHORDHA | BHUBANESWAR | KHORDHA | ODISHA | -15.99% | ₹24.6 L+₹2.3 L (10.5%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹29.3 L
EMD Value
₹29,314
Closing Date
13 Jul 2026, 5:00 pmClosed
DPC Khordha
DPO Khordha
Construction of Two nos. Additional Classroom at Nandan kanan Govt. High School, BBSR
2026_OPEPA_133018_9
01/CW/SS/2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
DPO Khordha
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹29,314
Yes
16 Jul 2026
29 Jun 2026
14 Jul 2026
29 Jun 2026
13 Jul 2026
29 Jun 2026
29 Jun 2026 - 10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in hard soil in foundation in cluding initial lead and 1.5 m. initial lift including cost, conveyance taxes of all materials etc complete as per direction of the Engineer-in-charge | 57.3 | Cum | 282.89 | ₹16,209.6 |
| 2 | Sand Filling in foundation & plinth with approved river sand well watered and rammed including cost, conveyance taxes of all materials etc complete as per direction of the Engineer-in-charge | 68.81 | Cum | 588.9 | ₹40,522.21 |
| 3 | Plain cement concrete (1:3:6) using 40mm BHG metal (crusher broken) well rammed including cost, conveyance taxes of all materials etc complete as per direction of the Engineer-in-charge | 8.13 | Cum | 6,296.64 | ₹51,191.68 |
| 4 | F.A brick work in cement mortar (1:6) using F.A. bricks (25cm x12cm x8cm)of approved quality including cost, conveyance & royalty of all materials etc complete as per direction of the Engineer-in-charge. a) In foundation & plinth | 12.7 | Cum | 5,663.26 | ₹71,923.4 |
| 5 | B) In super structure | 23.6 | Cum | 5,701.59 | ₹1,34,557.52 |
| 6 | F.Floor | 26.74 | Cum | 6,093.32 | ₹1,62,935.38 |
| 7 | S.Floor -Parapet / Head Room | 4.59 | cum | 6,543.81 | ₹30,036.09 |
| 8 | Rigid smooth centring for RCC works including false work and dismantling then after casting including floor cost of all materials complete in ground foundation and plinth | 73.54 | sqm | 249.83 | ₹18,372.5 |
| 9 | (a) Column and beam - G.Floor | 95.13 | sqm | 1,219.7 | ₹1,16,030.06 |
| 10 | F.Floor | 112.89 | sqm | 1,500.23 | ₹1,69,361.05 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_597988.xls
BOQ • 0.26 MB
DTCNNANDANKANAN.pdf
Tender Documents • 2.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .