Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
19 Feb 2018, 2:00 pmClosed
Superitending Engineer / MEDC
O/O SE/MEDC/K.PUDUR, MADURAI
Erection of poles, HT/LT Lines, Distribution Transformer Structure of various ratios and all other allied extension works in Town/ Elumalai section in Usilampatti Division pertaining to Madurai Electricity Distribution Circle, Madurai District
2018_EB_86692_1
SE/MEDC/ET/ Works Contract (IPDS)/ 092 /2017-18 Dt
Open Tender
Electrical Works
Works
90 days
Town Elumalai
As per BQR Condition in the tender document enclosed
2 documents required · 2 mandatory
₹0
₹3,000
Yes
18 Mar 2021
2 Feb 2018
19 Feb 2018
2 Feb 2018
19 Feb 2018
2 Feb 2018
Amount
Labour charge for transporting of 9 M PSC (400 KG-WP) Pole for erection of Transformer structure as per the TANGEDCO standard from road side to work spot, including labour charges, T&P etc, Complete upto 500 M
Labour charge for Earth work excavation of 9 M PSC (400 KG-WP) for erection of Transformer structure as per the TANGEDCO standard in all kinds of soil to depth of 1/5th of Pole height, including labour charges, lead and lift complete etc. Pit Size 1.32 M3
Labour charge for Erection of 9 M PSC (400 KG-WP) Pole with base plate in the excavated bit for erection of 11 KV Double pole structure as per the TANGEDCO standard,including tools and plants, Machineries complete etc.,
Labour charge for earth work excavation for 3 Nos of Earth pit and erection of Earth pipe with salt,coal and earth refilling complete etc (including cost of coal and salt)
Labour charge for Transformer structure grounding and earthing of complete structure ( 3 pit ) with GI wire including Cutting, hooking , binding etc in complete
Provision of Mass concrete and plastering for Transformer structure concrete for 9 M PSC (400 KG-WP) -(2 Poles) for the size of - 0.72 M3 ; Base -(0.6 X 0.6 X 1.65)M ; On the earth (0.6x0.6x.35 Cu)M; Concrete mix Ratio :- 1:2:4 , including sand, jully, cement , Tools and Plants, Curing complete etc.
Labour charge for Earth work stay pit excavation for a Pit Size 0.86 M3 , including Tools and plant, lead and lift complete etc
Labour charge for Erection of stay set complete incuding of refilling of excavated earth, Fixing of clamp, providng of stay rod, , Guy set, binding of etc, including tools and plants etc, complete.
Labour charge for providing of sleeve concrete and plastering of concrete for stay with the size of - 0.53 M3 (0.35 M dia, ), Concrete mix Ratio :- 1:2:4 , including sand, jully, cement , Tools and Plants, Curing complete etc.
Labour charge for erection of structure materials such as Top channel, Transformer seating channel, belting angle complete etc, including tools and plant, machinery complete etc
Labour charges for erection of 11 KV HG fuse set in Transformer structure per location including Tools and plant, Machinery complete etc.,
Labour charges for erection of 11 KV AB switch in Transformer structure per location including Tools and plant, Machinery complete etc.,
Labour charges for erection of LT cable wiring including LT bus bar in Transformer structure per location including Tools and plant, Machinery complete etc.,
Labour charges for erection of LT open type fuse unit including cable jumpering upto the LT line in Transformer structure per location including Tools and plant, Machinery complete etc.,
Labour charges for erection of HT jumpering for Transformer structure per location including Tools and plant, Machinery complete etc.,
Labour charges for erection of Distribution type HT LAS (1 set) on Transformer structure including Tools and plant, Machinery complete etc.,
Labour charges for erection of Distribution type LT LAS (1 set) on Transformer structure including Tools and plant, Machinery complete etc.,
Labour charge for Masonary work/ earth tub for earth pit for 3 Nos Earth tub set including tools and plants , Machinery, complete, etc.,
Transporting charges for structure materials, including AB switch,HG Fuse set, Cables,complete etc., (except Pole)
Labour charges for painting by one coat with red oxide paint in DT structure complete including Tools, plant and machinery complete etc., (Except cost of paint)
Labour charges for painting two coats with approved quality of aluminium paint for transformer structure and iron materials complete including Tools, plant and machinery complete etc., (Except cost of paint)
Labour charges for painting 2 coats of snowcem paint for 2nos poles in transformer structure and cut stone complete including Tools, plant and machinery complete etc., (Except cost of paint)
Labour charge for levelling the transformer structure yard and providing cut stone or brick on edge spreading 1 layer of 40mm blue metal,complete etc
Labour charge for erection of Distribution transformer complete (upto 100 KVA)
Labour charges for Loading and Unloading of Distribution transformer complete ( upto 100 KVA)
Applicable SGST has to be quoted as numbers
Applicable CGST has to be quoted as numbers
Inter-state GST is applicable only for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .