| Sl No | Description | Qty | Unit | C REVATHI L1 | SEENAPPA BASKAR L2 |
|---|---|---|---|---|---|
| 1.00 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers.(p.no.29) 90mm HDPE Pipe 90mm HDPE Pipe | 1,050 | Rm | 304 ₹3,19,200 Lowest | 305 ₹3,20,250 |
| 2.00 | Earth work excavation and deposition on the bank with an initial lead and lift of 10 meters and initial lift of 2 meters in hard stiffy clay stiff black cotton hard red earth murram, gravelly soils(SS20B) etc., complete as per std., specification. | 1,050 | Rm | 190 ₹1,99,500 Lowest | 195 ₹2,04,750 |
| 3.00 | Lowering the following HDPE pipes and specials into trench and laying to proper grade and alignment complete as per standard specification by deparment officers etc.., HDPE Pipe 90mm | 1,050 | Rm | 18 ₹18,900 Lowest | 19 ₹19,950 |
| 4.00 | Jointing the HDPE pipes and specials and testing the required pressure with water etc.., Complete as per standard specification | 1,050 | Rm | 30 ₹31,500 Lowest | 31 ₹32,550 |
| 5.00 | Testing of pipes for water supply with hudralic testing equipments by filling with water including cost of water @ 60/KL and testing to recommended Pressure in convenient stretches and attending the brusts if any occurred during the test excluding the cost of pipes but including other incidential and operational charges ETC... complete for the following diameteres of pipes HDPE Pipe 90mm | 1,050 | Rm | 70 ₹73,500 Lowest | 76 ₹79,800 |
| 6.00 | Refilling the excavated earth in to the trenches after laying the P.V.C. pipe in to the trench including cost of all labour charges and all other incidental charges etc., complete. | 1,050 | Rm | 25 ₹26,250 Lowest | 27 ₹28,350 |
| 7.00 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers. 90 mm HDPE stup bend | 6 | Nos | 1,200 ₹7,200 Lowest | 1,200 ₹7,200 Lowest |
| 7.01 | 90 mm HDPE Elbow | 6 | Nos | 343 ₹2,058 Lowest | 343 ₹2,058 Lowest |
| 7.02 | 90 mm HDPE Flange set | 6 | Nos | 1,100 ₹6,600 Lowest | 1,100 ₹6,600 Lowest |
| 7.03 | 110 x 90 mm HDPE Reducer | 6 | Nos | 300 ₹1,800 Lowest | 300 ₹1,800 Lowest |
Tender Value
₹8.5 L
EMD Value
₹8,500
Closing Date
15 Oct 2025, 3:00 pmClosed
THE COMMISIONER
Hosur City Municipal Corporation bagalur road
Providing and laying pipe line works at Ward No 03 Rajaji Nagar OHT to Thendral City in Hosur City Municipal Corporation
2025_MAWS_611812_2
15003/2024/E3/hosur city municipal corporation
Open Tender
Civil Works
Works
30 days
Hosur City Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,500
8 Dec 2025
6 Oct 2025
15 Oct 2025
6 Oct 2025
15 Oct 2025
6 Oct 2025
Amount
Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers.(p.no.29) 90mm HDPE Pipe 90mm HDPE Pipe
Earth work excavation and deposition on the bank with an initial lead and lift of 10 meters and initial lift of 2 meters in hard stiffy clay stiff black cotton hard red earth murram, gravelly soils(SS20B) etc., complete as per std., specification.
Lowering the following HDPE pipes and specials into trench and laying to proper grade and alignment complete as per standard specification by deparment officers etc.., HDPE Pipe 90mm
Jointing the HDPE pipes and specials and testing the required pressure with water etc.., Complete as per standard specification
Testing of pipes for water supply with hudralic testing equipments by filling with water including cost of water @ 60/KL and testing to recommended Pressure in convenient stretches and attending the brusts if any occurred during the test excluding the cost of pipes but including other incidential and operational charges ETC... complete for the following diameteres of pipes HDPE Pipe 90mm
Refilling the excavated earth in to the trenches after laying the P.V.C. pipe in to the trench including cost of all labour charges and all other incidental charges etc., complete.
Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers. 90 mm HDPE stup bend
90 mm HDPE Elbow
90 mm HDPE Flange set
110 x 90 mm HDPE Reducer
90 mm PVC Ball Valve
90 mm HDPE Tee
90 x 75 mm HDPE Reducer
2" x 3" HDPE Reducer
SEENAPPA BASKAR (BID ID -1487113)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .