Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC 1ST FLOOR AKSHAY BANQUET HALL VIKAS NAGAR SARWAL JAMMU JAMMU JAMMU KASHMIR 180005 | JAMMU | JAMMU AND KASHMIR | 180005 | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.1 L+₹55,344 (8.40%)Rejected-Finance CHENNAI | TAMIL NADU | 600001 | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | KALIDASSAN EDISON L2 | SAI AND CO L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete | 96 | Cum | 205 ₹19,680 Lowest | 205 ₹19,680 Lowest |
| 2.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 12 | Cum | 2,099 ₹25,188 Lowest | 2,099 ₹25,188 Lowest |
| 3.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 12 | Cum | 5,921 ₹71,052 Lowest | 5,921 ₹71,052 Lowest |
| 4.00 | Supplying and erecting centering for vertical plain/ RCC concrete walls of supply channel, retaining wall etc upto 90Cm height with necessary supports,all cross bracing with mild steel size of 90cm x60 cm and gauge BG 10 stiffened with welded mild steel sheet angles of size 25 mm x25 mm x3mm for bearing laid silver Oak/ Country wood joist of size 7.50 cm x5.0 cm spaced @ about 90 cm C/C and supported by Casurina props of 10 cm to 13 cm spaced @ 75 cm C/C etc,, complete complaying with standered specfications and as directed by the departmental officers. | 288 | Sqm | 494 ₹1,42,272 Lowest | 494 ₹1,42,272 Lowest |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 39 | Cum | 8,500 ₹3,31,500 | 7,294 ₹2,84,466 Lowest |
| 6.00 | Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed sand (M-Sand) and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. | 54 | Sqm | 180 ₹9,720 Lowest | 180 ₹9,720 Lowest |
Tender Value
₹6.9 L
EMD Value
₹6,900
Closing Date
25 Jul 2025, 3:00 pmClosed
Commissioner Pattukkottai Municipality
Commissioner Pattukkottai Municipality
Construction of Storm water Drain in Ward 02 Athi street Cross -1 in Pattukkottai Municipality
2025_MAWS_583896_1
Pattukkottai Municipality - 1156-2024-E1
Open Tender
Civil Works
Works
Pattukkottai municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,900
30 Oct 2025
21 Jul 2025
25 Jul 2025
21 Jul 2025
25 Jul 2025
21 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_697658.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .