Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹1.9 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BABLU SINHA L1 |
|---|---|---|---|---|
| 1.00Discription of items | ||||
| 2.00 | Installation and commissioning of 1000mm widex 480 mtr conveyor Belt in Panel No. TF 3, -5D/-5L to-5D/-17L of RV seam of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area Transportation & Installation of complete drive drum, driven drum with gear motor base frame-10.5MT+discharge unit-2.5MT+tall end -1MT+load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+mator, winch starter & switches cables etc-2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-480mtr @68Kg/mtr=32.64MT+4 times Tall end shifting (extension)-4MT total weight=58.24 MT | 58.2 | MT | 26,421 ₹15,37,702.2 |
| 3.00 | Fitting of tail end and discharge scraper. | 2 | nos | 1,218 ₹2,436 |
| 4.00 | Belt laying including transporting of belt, jointing, tensioning, trail run etc | 980 | mtr | 558 ₹5,46,840 |
| 5.00 | Foundation, bolting for fitting of drive unit, discharge unit, loop take up & tall end etc =120nos | 120 | nos | 448 ₹53,760 |
| 6.00 | Cleaning of coal & unused materials before installation job | 1 | ls | 20,711 ₹20,711 |
| 7.00 | Making of Tail end | 1 | nos | 28,981 ₹28,981 |
| 8.00 | Fencing of drive, loop take up & tail end. | 1 | ls | 18,274 ₹18,274 |
| 9.00 | Making vertical support from roof and floor for hanging the 8 conveyor structure from drive head to discharge by welding. gas cutting etc. considering cost of consumables. | 1 | ls | 54,461 ₹54,461 |
| 10.00 | Dismantling of complete drive drum driven drum with gear motor base frame-10.5MT+discharge unit-2.5MT+tail end-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-91MT+load table 01nos-1MT+ motor, winch starter & switch & cables etc.-2MT+1000mm wide conveyor structure with top, bottom roller & foot stool-480mtr @68Kg/mtr =34.81MT, total weight = 54.24MT | 54.24 | MT | 10,112 ₹5,48,474.88 |
Tender Value
₹2.2 Cr
EMD Value
₹2.7 L
Closing Date
26 Jan 2026, 9:00 amClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Transportation, installation, commissioning, extension and dismantling of conveyor belts in RV seam for SHCM package of CM project at Nakrakonda- Kumardihi-B colliery under Bankola area.
2026_ECL_350470_1
ECL/GM/BA/E TENDER/25-26/ENM/240 Dt 06.01.2026
Open Tender
Electrical and Maintenance Works
60 days
Nakrakonda Kumardihi B Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹2.7 L
13 Feb 2026
6 Jan 2026
27 Jan 2026
6 Jan 2026
26 Jan 2026
6 Jan 2026
6 Jan 2026 - 15 Jan 2026
Installation and commissioning of 1000mm widex 480 mtr conveyor Belt in Panel No. TF 3, -5D/-5L to-5D/-17L of RV seam of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area Transportation & Installation of complete drive drum, driven drum with gear motor base frame-10.5MT+discharge unit-2.5MT+tall end -1MT+load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+mator, winch starter & switches cables etc-2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-480mtr @68Kg/mtr=32.64MT+4 times Tall end shifting (extension)-4MT total weight=58.24 MT
Fitting of tail end and discharge scraper.
Belt laying including transporting of belt, jointing, tensioning, trail run etc
Foundation, bolting for fitting of drive unit, discharge unit, loop take up & tall end etc =120nos
Cleaning of coal & unused materials before installation job
Making of Tail end
Fencing of drive, loop take up & tail end.
Making vertical support from roof and floor for hanging the 8 conveyor structure from drive head to discharge by welding. gas cutting etc. considering cost of consumables.
Dismantling of complete drive drum driven drum with gear motor base frame-10.5MT+discharge unit-2.5MT+tail end-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-91MT+load table 01nos-1MT+ motor, winch starter & switch & cables etc.-2MT+1000mm wide conveyor structure with top, bottom roller & foot stool-480mtr @68Kg/mtr =34.81MT, total weight = 54.24MT
Taken out and colling of belt
Cost of M.5. Nut bolts & washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame, Loop take up base & discharge base cement concrete
Installation and commissioning of 1000mm widex 400 mtr Conveyor belt of 10L/-5D to -10L/- 15D in panel no. PF2 of RV seam of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area Transportation & installation of complete drive drum, driven drum with gear motor base frame-10.5MT+discharge unit-2.5MT+tail end -1MT+load table-1MT+loop take up with tension trolley drum-3.6MT + Flx unit-1MT+motor, winch starter & switches cables etc -2MT + 1000mm wide conveyor structure with top, bottom roller & foot stool-400mtr @68Kg/mtr = 27.2MT + 3 times Tall end shifting (extension)-3MT= total weight = 45.8MT
Fitting of tall end and discharge scraper.
Belt laying including transporting of belt, jointing, tensioning, trail run etc
Foundation, bolting for fitting of drive unit, discharge unit, loop take up & tall end etc =120nos
Cleaning of coal & unused materials before installation job
Fencing of drive, loop take up & tail end.
Making vertical support from roof and floor for hanging the 8 conveyor structure from drive head to discharge by welding. gas cutting etc. considering cost of consumables.
Dismantling of complete drive drum driven drum with gear motor base frame-10.5MT+discharge unit-2.5MT+tail end -1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+load table 01nos-1MT+ motor, winch starter & switch & cables etc.-2MT+1000mm wide conveyor structure with top, bottom roller & foot stool-400mtr @68Kg/mtr = 27.2MT total weight = 48.8MT
Taken out and colling of belt
Cost of M.5. Nut bolts & washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame, Loop take up base & discharge base cement concrete
Installation and commissioning of 1000mm widex 200 mtr conveyor Belt in Panel No. PF1,-15L/-5D to -15L/-10D of RV seam of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area Transportation & installation of complete drive drum, driven drum with gear motor base frame-10.5MT-discharge unit-2.5MT+tail end-1MT+load table-1MT+loop take up with tension trolley drum-13.60MT+Fix unit-1MT motor, winch starter & switches cables etc-2.0MT 1000mm wide conveyor structure with top, bottom roller & foot stool-200mtr @68Kg/mtr 13.60MT+2 times Tail end shifting (extension)-2MT= total weight=37.20 MT
Fitting of tall end and discharge scraper.
Belt laying including transporting of belt, jointing, tensioning, trail run etc
Foundation, bolting for fitting of drive unit, discharge unit, loop take up & tall end etc =120nos
Cleaning of coal & unused materials before installation job
Fencing of drive, loop take up & tail end.
Making vertical support from roof and floor for hanging the 8 conveyor structure from drive head to discharge by welding. gas cutting etc. considering cost of consumables.
Dismantling of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tall end-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+load table 01nos-1MT+ motor, winch starter & switch & cables etc.-2MT+1000mm wide conveyor structure with top, bottom roller & foot stool-200mtr @68Kg/mtr =13.60MT, total weight = 35.20MT
Taken out and colling of belt
Cost of M.5. Nut bolts & washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame, Loop take up base & discharge base cement concrete
Installation and commissioning of 1000mm widex 400 mtr Conveyor belt of 0L/-5D to 10L/-5D of TF1 of RV seam of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area. Transportation & installation of complete drive drum, driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT-tail end-1MT+load table-1MT+loop take up with tension trolley drum 3.6MT + FIx unit-1MT+motor, winch starter & switches cables etc -2MT + 1000mm wide conveyor structure with top, bottom roller & foot stool-400mtr @68Kg/mtr = 27.2 M7+3 times Tail end shifting (extension)-3MT= total weight = 45.8MT
Fitting of tall end and discharge scraper.
Belt laying including transporting of belt, jointing, tensioning, trail run etc
Foundation, bolting for fitting of drive unit, discharge unit, loop take up & tall end etc =120nos
Cleaning of coal & unused materials before installation job
Fencing of drive, loop take up & tail end.
Making vertical support from roof and floor for hanging the 8 conveyor structure from drive head to discharge by welding. gas cutting etc. considering cost of consumables.
Dismantling of complete drive drum driven drum with gear motor base frame -10.5MT-discharge unit-2.5MT+tail end-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+load table 01nos-1MT+ motor, winch starter & switch & cables etc.-2MT-1000mm wide conveyor structure with top, bottom roller & foot stool-400mtr @68Kg/mtr 27.20MT, total weight 48.80MT
Taken out and colling of belt
Cost of M.5. Nut bolts & washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame, Loop take up base & discharge base cement concrete
Installation and commissioning of 1000mm widex 800 mtr Conveyor belt of 5L/-5D to 5L/-25D of PF5 of RV seam of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area Transportation & installation of complete drive drum, driven drum with gear motor base frame-10.5MT+discharge unit-2.5MT+tail end-1MT+load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc-2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-800mtr \$ 68kg / m * tr = 54.4MT + 8 times Tall end shifting (extension)-8MT-total weight = 84MT
Fitting of tall end and discharge scraper.
Belt laying including transporting of belt, jointing, tensioning, trail run etc
Foundation, bolting for fitting of drive unit, discharge unit, loop take up & tall end etc =120nos
Cleaning of coal & unused materials before installation job
Fencing of drive, loop take up & tail end.
Making vertical support from roof and floor for hanging the 8 conveyor structure from drive head to discharge by welding. gas cutting etc. considering cost of consumables.
Dismantling of complete drive drum driven drum with gear motor base frame-10.5MT+discharge unit-2.5MT+tail end-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+load table 01nos-1MT+ motor, winch starter & switch & cables etc.-2MT-1000mm wide conveyor structure with top, bottom rojler & foot stool-800mtr @68Kg/mtr =54.40MT, total weight = 76MT
Taken out and colling of belt
Cost of M.5. Nut bolts & washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame, Loop take up base & discharge base cement concrete
Installation and commissioning of 1000mm widex 600 mtr Conveyor belt of 10L/-5D to 10L/-20D of PF6 of RV seam of CM Project at Nakrakonda Kumardihi 8 Colliery under Bankola Area Transportation & installation of complete drive drum, driven drum with gear motor base frame-10.5MT+discharge unit-2.5MT+tail end-1MT-load table-1MT-loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc-2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-600mtr @68Kg/mtr 40,80MT+ 6 times Tall end shifting (extension)-6MT=total weight -68.40MT
Fitting of tall end and discharge scraper.
Belt laying including transporting of belt, jointing, tensioning, trail run etc
Foundation, bolting for fitting of drive unit, discharge unit, loop take up & tall end etc =120nos
Cleaning of coal & unused materials before installation job
Fencing of drive, loop take up & tail end.
Making vertical support from roof and floor for hanging the 8 conveyor structure from drive head to discharge by welding. gas cutting etc. considering cost of consumables.
Dismantling of complete drive drum driven drum with gear motor base frame-10.5MT+discharge unit-2.5MT+tail end-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+load table 01nos-1MT+motor, winch starter & switch & cables etc.-2MT+1000mm wide conveyor structure with top, bottam roller & foot stool-600mtr @68Kg/mtr =40.80MT, total weight =62.40 MT
Taken out and colling of belt
Cost of M.5. Nut bolts & washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame, Loop take up base & discharge base cement concrete
Total impact of GST for the purpose of CTC
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.77 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_363344.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid