Loading…
Loading…
Tender Value
₹62.0 L
EMD Value
₹1.2 L
Closing Date
13 Jul 2026, 11:00 am5d left
PE EE Hort
PSIEC Chandigarh
Horticulture and Landscaping works at Udyog Bhawan Building Sector 17 Chandigarh
2026_IC_170761_1
PSIEC/Horticulture/UB
Open Tender
Miscellaneous Works
180 days
Udyog Bhawan Sector 17 Chandgiarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹1.2 L
24 Jun 2026
24 Jun 2026
13 Jul 2026
24 Jun 2026
13 Jul 2026
24 Jun 2026
Horticulture and Landscaping works
Good Earth with Farm Yard Manure Mixer- Supplying of good earth/ soil-less media and/ or organic matter, preparation of top dressing mixture or pot media. Screening farm yard manure through sieve of I.S. designation 16 mm and mixing with good earth in ratio of 1:1.
PROVIDING AND PLANTING OF SPECIMEN PLANTS:- Providing healthy sapling of trees of minimum height 6 feet and acceptable to the EIC. Digging of pits of a size 75cm x 75cm x 75cm refilling of excavated earth after mixing with 2 Kg Neem cake 0.34 Cum earth and 02 (two) Cft well rotten farm yard manure . Planting of plants including digging holes and fixing the earth ball in position and making raised edge around the pit. Watering the plants through tractor tanker @ 40 litres per plant before and after planting the Tree. Plants will be protected from white ants with insecticides (Chlorpyriphos) @ 50ml per plant. Trees will be protected and safe guarded from storm with support of bamboo sticks. The care and nurture of sapling should be done by the contractor as per the satisfaction of EIC.
Patch A (Central Triangle)
Champa Trees (Dwarf) or Plumeria alba
Casuarina Topiary 0r Golden / Copper Bottlebrush Topiary
Foxtail Palm Tree
Crape Jasmine
Box wood plants
Crown of Thorns plant
Peregrina (Spicy Jatropha plant)
Chandani
Arborbitae plant or Unipress Golden
Patch B (Center of Gates inner side)
Hamelia Plants
Crape Jasmine
Box wood plants
Peregrina (Spicy Jatropha plant)
Casuarina Topiary
Patch C (Center of Gates Out side)
Hamelia Plants
Box wood plants
Palm Tree
Casuarina Topiary
Crown of Thorns plant
Patch D (IN side of Gate Outer road Side)
Hamelia Plants
Box wood plants (Big size)
Arborbitae plant or Unipress Golden
Patch F (IN side of Gate internal Side)
Hamelia Plants
Box wood plants
Arborbitae plant or Unipress Golden
Crown of Thorns plant (Full developed)
Patch E (Out side of Gate Outer road Side)
Hamelia Plants
Box wood plants
Arborbitae plant
Crown of Thorns plant
Patch F (Out side of Gate internal Side)
Hamelia Plants
Box wood plants
Arborbitae plant
Crown of Thorns plant
Patch G (IN Side of Gate internal Side) GAIL Office
Casuarina Topiary 0r Golden / Copper Bottlebrush Topiary
Foxtail Palm Tree
Crape Jasmine
Canteen Side Area
Champa Trees (Dwarf) or Plumeria alba
Casuarina Topiary 0r Golden / Copper Bottlebrush Topiary
Foxtail Palm Tree
Crape Jasmine
Box wood plants
Peregrina (Spicy Jatropha plant)
Total Specimen Plants
Digging of pits in all kinds of soil & refilling the same, with the excavated earth mixed with well decayed farm yard manure @ 30% of pit volume and insecticide for termite control
Total Specimen Plants = 443
Total Shrubs Plants = 100
Total trees =10
Providing & planting of trees SUPPLYING AND PLANTING PERMANENT TREES IN PREPARED PITS AND WATERING. Supplying and planting permenent trees having minimum height of 1.8 m and minimum caliper of 2.5 cm in prepeared pits and watering. Supplying & planting of healthy permanent tree plants with khurpa, fixing the earth ball position and making raised edge around the pit after planting and watering the plant @20 litre/plant before and after planting, complete in all respect by the contractor as per the satisfaction and direction of EIC. Quality characteristics of trees: - Tree Trunk: - Tree trunks shall be straight and well tapered. Trees with multiple leaders, unless specified, shall be rejected. Damaged, cut or crooked leaders; included bark, bark abrasions, sunscald, disfiguring knots, mold, and prematurely opened buds or cut limbs over three-quarter inch (3/4”) diameter that are not completely callused shall be rejected. The minimum acceptable size of trees after pruning, with branches in normal positions, shall be a minimum height of 1.8 m and minimum caliper of 2.5 cm. Caliper measurement shall be taken at a point on the trunk 15 cm above root flare. All trees shall have terminal shoots and reasonably well-developed crown. Trees of same species shall have uniform height, structure, and spread.
Providing and planting of Hedge :- Planting permanent hedges including digging of trenches 60cm. wide and 30cm. deep, refilling the excavated earth mixed with manure supplied @ of 4.65 cum per 100 m & Supplying & planting hedge plants at 30cm. apart.
Patch A (Central Triangle)
Patch B (Center of Gates inner side)
Patch D (IN side of Gate Outer road Side)
Patch F (IN side of Gate internal Side)
Patch F (Out Side of Gate internal Side)
Boundry wall (Conocarpus Hedge Planting)
Back Side Canteen Area (Aproximate)
PROVIDING AND PLANTING OF special GROUND COVER Planting ground covers (special) including digging of beds to 15 cm depth and mixing FYM, fertilizer and insecticides, planting of sapling at 25cm distance from plant to plant and row to row.
Patch A (Central Triangle)
Patch B (Center of Gates inner side)
Patch D (IN side of Gate Outer road Side)
Patch F (IN side of Gate internal Side)
Patch F (Out Side of Gate internal Side)
Planting ground covers (ordinary) including digging of beds to 15 cm depth and mixing FYM, fertilizer and insecticides, planting of sapling at 25cm distance from plant to plant and row to row.
Lump Sump
Planting seasonal flower in beds
Planting seasonals at flowering stage in beds including digging of beds to 15 cm depth and mixing FYM, fertilizer and insecticides, planting at 20cm distance from plant to plant and row to row.
Near Canteen Area (Approxi.)
In Front Side of Main Entry (Approxi.)
Near main gate
Patch 1 Near Canteen Area
Patch 2 Near Canteen Area
Patch 3 Near Canteen Area
Patch 4 Near Canteen Area
Basement ramp Side
Supply and installation of garden bench Chair type garden bench with L-shaped sides made of reinforced concrete (M- 30), thickness 100 mm, overall height1000 mm, base width 620 mm. Back and seat shall consist of 5 Nos. reinforced concrete planks 1500 mm x 100 mm x 50 mm one plank 1500 mm x 200 mm x 50 mm. Seating height of the bench shall be 450 mm. The bench shall be fixed with nuts on concrete mount, all holes sealed after assembly and installation
Providing and fixing pair of Plastic dustbins 100 litre volume each, of two different colours, for dry and wet waste, made of virgin plastic to be mounted on MS rectangular hollow section 50 x 25 x 3 mm frames pivoted on 3 MS square hollow section verticals, 1 m above ground, one 35 cm RHS welded to each vertical member at base and grouted in 180 x 40 x 30 cm 1:2:4 cement concrete.
Supply and installation of artificial grass with tape, adhesive and all accessories, complete,
40 mm artificial turf
Providing and fixing vertical garden panels on aluminium tube (50 x25 x 1.5 mm) frame, fixed on wall, with growing media of cocopeat, perlite and vermiculite 2:1:1, amended with fertilizers and plants as specified by the EIC and drip irrigation system complete in all respect to the entire satisfaction of engineer in charge.
Outdoor vertical garden
In Front Side of Main Entry Left Hand Side
In Front Side of Main Entry Right Hand Side
Total Area Outdoor vertical garden
Maintenance of Horticulture Works
Pruning, trimming, shaping of mature trees /shrubs (ht 15 feet and above) including removal of cut materials up to 50m lead.
MAINTENANCE OF TREES FOR 3 YEARS
Maintenance of tree including fertilization, application of insecticide, watering, weeding, training, pruning, disposal of debris and other activities. During this maintenance period all the required operations will be done as per yearly maintenance schedule given here under:-
1. Irrigations 27 Nos. @ 4 irrigations each in the month of April, May & June at 7 day interval, 2 irrigations in the month of February, March, September, October, November and December and one each in the month of July, August and January or as per requirement to the seasonal variations. Each irrigation should be of 20 Ltrs. water per plant per irrigation. However the numbers of irrigations can be increased or decreased as per the requirement at site or as per the satisfaction of EIC.
2. Hoeing and preparation of dowels 15 Nos. in a year @ 2 hoeing each in the month of July, august, September and one in remaining nine months or as per seasonal requirement. 9” high earthen dowels should also be made all around the pit after each hoeing to the entire satisfaction of Engineer-in-charge. However the numbers of hoeing can be increased as per the requirement and as per the entire satisfaction of EIC.
3. Application of urea in the month February or July having 80 gm urea per plant per time , and dosage of DAP 40 gm per plant in April or as per requirement at site and entire satisfaction of EIC.
4. Application of 30 ml. of Chlorpyriphos for protection against white ants twice in the year or as per requirement and entire satisfaction of EIC.
5. Manuring with 0.0508 Cum well rotten farm yard manure per plant will be applied in the month of December or as per requirement at site and satisfaction of EIC.
6. The watch & ward of plant & tree guard should be done by the contractor. The training of plants carries out as single stem according to the shape/size of specific plant.
7. The replacement of casualties if any will be done by the contractor complete in all respects as per specifications and instructions of EIC.
(i) Maintenance of trees (Age 1st year) for 1st year. Trees with initial height of 1.8 meters
(ii) Maintenance of trees (Age 2nd year) for 2nd year. Trees with initial height of 1.8 meters
(iii) Maintenance of trees (Age 3rd year) for 3rd year. Trees with initial height of 1.8 meters
MAINTENANCE OF INDIVIDUAL SHRUBS FOR 3 YEARS
Maintenance of shrubs for one year including training, pruning, fertilization, application of insecticide, watering and weeding. During this maintenance period all the required operations will be done as per yearly maintenance schedule given here under:-
1. Irrigations 27 Nos. @ 4 irrigations each in the month of April, May & June at 7 day interval, 2 irrigations in the month of February, March, September, October, November and December and one each in the month of July, August and January or as per requirement to the seasonal variations. Each irrigation should be of 10 Ltrs. water per plant per irrigation. However the numbers of irrigations can be increased or decreased as per the requirement at site or as per the satisfaction of EIC.
2. Hoeing and preparation of dowels 15 Nos. in a year @ 2 hoeing each in the month of July, august, September and one in remaining nine months or as per seasonal requirement. 9” high earthen dowels should also be made all around the pit after each hoeing to the entire satisfaction of Engineer-in-charge. However the numbers of hoeing can be increased as per the requirement and as per the entire satisfaction of EIC.
3. Application of two dosage of urea in the month of March & July having 20 gm urea per plant per time and two dosage of DAP 10 gm per plant per time as per requirement at site and entire satisfaction of EIC.
4. Application of 20 ml. of Chlorpyriphos for protection against white ants twice in the year or as per requirement and entire satisfaction of EIC.
5. Manuring with 0.0508 Cum well rotten farm yard manure per plant will be applied in the month of December or as per requirement at site and satisfaction of EIC.
6. The watch & ward of plant & tree guard should be done by the contractor. The training of plants carries out as single stem according to the shape/size of specific plant.
7. The replacement of casualties if any will be done by the contractor complete in all respects as per specifications and instructions of Engineer-in-charge.
(i) Maintenance of shrubs for 1st year
(ii) Maintenance of shrubs for 2nd year
(iii) Maintenance of shrubs for 3rd year
MAINTENANCE OF SPECIMEN PLANTS FOR 3 YEARS
Maintenance of specimen plants for one year including, fertilization, application of insecticide, watering and weeding. During this maintenance period all the required operations will be done as per yearly maintenance schedule given here under:-
1. Irrigations 27 Nos. @ 4 irrigations each in the month of April, May & June at 7 day interval, 2 irrigations in the month of February, March, September, October, November and December and one each in the month of July, August and January or as per requirement to the seasonal variations. Each irrigation should be of 20 Ltrs. water per plant per irrigation. However the numbers of irrigations can be increased or decreased as per the requirement at site or as per the satisfaction of EIC.
2. Hoeing and preparation of dowels 15 Nos. in a year @ 2 hoeing each in the month of July, august, September and one in remaining nine months or as per seasonal requirement. 9” high earthen dowels should also be made all around the pit after each hoeing to the entire satisfaction of Engineer-in-charge. However the numbers of hoeing can be increased as per the requirement and as per the entire satisfaction of EIC.
3. Application of urea in the month of Feb or July having 20 gm urea per plant, Murate of Potash @ 10 gm in Sept. and dosage of DAP 10 gm per plant in April or as per requirement at site and entire satisfaction of EIC.
4. Application of 30 ml. of Chlorpyriphos for protection against white ants twice in the year or as per requirement and entire satisfaction of EIC.
5. Manuring with 0.0508 Cum well rotten farm yard manure per plant will be applied in the month of December or as per requirement at site and satisfaction of EIC.
6. The watch & ward of plant should be done by the contractor. The training of plants carries out as single stem according to the shape/size of specific plant.
7. The replacement of casualties if any will be done by the contractor complete in all respects as per specifications and instructions of Engineer-in-charge.
(i) Maintenance of specimen plants for 1st year
(ii) Maintenance of specimen plants for 2nd year
(iii) Maintenance of specimen plants for 3rd year
MAINTENANCE OF GROUND COVERS (SPECIAL) FOR 3 YEARS
Maintenance of ground cover (special) for one year including application of FYM, fertilizer, insecticides, pruning and casualty replacement.
1. Irrigations 27 Nos. @ 4 irrigations @5 Litre/sqm each in the month of April, May & June at 7 day interval, 2 irrigations in the month of February, March, September, October, November and December and one each in the month of July, August and January or as per requirement to the seasonal variations. However the numbers of irrigations can be increased as per the requirement at site or as per the satisfaction of EIC.
2. Hoeing 15 Nos. in a year @ 2 hoeing each in the month of July, August & September and one hoeing each in the remaining nine month or as per seasonal requirement to the entire satisfaction of Engineer-in-charge. However the numbers of hoeing can be increased as per the requirement and as per the entire satisfaction of EIC.
3. Application of urea in the month of February or July having 40 gm urea per Sqm and dosage of DAP @ 10 gm per Sqm in April or as per requirement at site and entire satisfaction of EIC.
4. Application of manuring with well rotten farm yard manure with 0.06 cum per sqm in the month of December or as per requirement at site and satisfaction of EIC.
5. Replacement of causalities as and when required.
6. Application of 100 ml. of Chlorpyriphos per Sqm for protection against white ants twice in the year or as per requirement and entire satisfaction of EIC.
7. Trimming of ground cover to keep them in proper shape and size at one month’s interval and watch and Ward of Ground covers complete in all respect as per specifications and satisfaction of EIC.
(i) Maintenance of ground covers (special) for 1st year
(ii) Maintenance of ground covers (special) for 2nd year
(iii) Maintenance of ground covers (special) for 3rd year
MAINTENANCE OF GROUND COVERS (ORDINARY) FOR 3 YEARS
Maintenance of ground cover (ordinary) for one year including application of FYM, fertilizer, insecticides, pruning and casualty replacement.
1. Irrigations 27 Nos. @ 4 irrigations @5 Litre/sqm each in the month of April, May & June at 7 day interval, 2 irrigations in the month of February, March, September, October, November and December and one each in the month of July, August and January or as per requirement to the seasonal variations. However the numbers of irrigations can be increased as per the requirement at site or as per the satisfaction of EIC.
2. Hoeing 15 Nos. in a year @ 2 hoeing each in the month of July, August & September and one hoeing each in the remaining nine month or as per seasonal requirement to the entire satisfaction of Engineer-in-charge. However the numbers of hoeing can be increased as per the requirement and as per the entire satisfaction of EIC.
3. Application of urea in the month of February or July having 40 gm urea per Sqm and dosage of DAP @ 10 gm per Sqm in April or as per requirement at site and entire satisfaction of EIC.
4. Application of manuring with well rotten farm yard manure with 0.06 Cum per Sqm. in the month of December or as per requirement at site and satisfaction of EIC.
5. Application of 100 ml. of Chlorpyriphos per Sqm. for protection against white ants twice in the year or as per requirement and entire satisfaction of EIC.
6. Trimming of plants (Ground covers) to keep them in proper shape and size at one month’s interval and watch and Ward of Ground covers complete in all respect as per specifications and satisfaction of EIC.
7. Replacement of causalities as and when required.
(i) Maintenance of ground covers (ordinary) for 1st year
(ii) Maintenance of ground covers (ordinary) for 2nd year
(iii) Maintenance of ground covers (ordinary) for 3rd year
Maintenance of grassy grounds including fertilizer application, watering, weeding, top dressing with good earth and manure mixture, maintaining fine level, regular mowing and removal of rubbish with all lifts and leads.
Maintenance schedule given here under:-
1. Irrigations 27 Nos. @ 4 irrigations each in the month of April, May & June at 7 day interval, 2 irrigations in the month of February, March, September, October, November and December and one each in the month of July, August and January or as per requirement to the seasonal variations. However the numbers of irrigations can be increased as per the requirement at site or as per the satisfaction of EIC.
2. Application of urea in the month of February or July having 30 gm urea per Sqm. per time and dosage of DAP 20 gm per plant per time as per requirement at site and entire satisfaction of EIC.
3. Application of 10 ml. of Chlorpyriphos per Sqm for protection against white ants twice in the year or as per requirement and entire satisfaction of EIC.
4. 15 no. mowing of lawn with power lawn mower @ two mowing each in the months of July, Aug. & Sept. & 1 mowing each in the remaining 9 months.
5. Repair and patch work of grass as per site requirement and entire satisfaction of EIC.
MAINTENANCE OF Seasonal flower beds. MAINTENANCE OF Seasonal flower beds including digging of beds to 15cm depth mixing FYM, fertilizer and insecticides, planting of sapling at 20cm distance from plant to plant and row to row, three times a year. Annual maintenance: Summer, rainy and winter flowering seasonal seedlings shall be planted as directed by the Engineer- in-charge. The plants shall be watered regularly at frequency to be decided by Engineer-in-charge depending on season, plant species and soil conditions. Well rotten F.Y.M. shall be applied @ 0.508 cum per 10 sqm to winter annuals. DAP @ 20 gm per sqm shall be applied to the Summer and Winter season annuals. Urea shall be applied @ 0.4 kg per 10 sqm in three to four splits depending on soil type. Chlorpyriphos @ 0.1 liter per 10 sqm shall be applied during April-May and Sept-Oct to safeguard against termites. Broad spectrum fungicide @ 2 gm/ liter of water shall be sprayed at least once in every season to protect plants from diseases. Constant watch shall be maintained to ensure that dead plants are replaced and weeds are removed. Hoeing/Weeding shall be done 15 times a year, twice a month in July, August and September and once a month in remaining months of the year.
The plants shall be pinched one month after planting to encourage lateral growth. Withered flower heads shall be continuously removed during flowering time. The dead plants shall be replaced with plants of same species. Measurement: Length and breadth of the bed shall be measured correct to 0.1 m and the area shall be calculated in square meter correct to two places of decimal. Rate: The rate shall include the cost of labour and material involved in all the operations described above. All the above operations shall be done as per the entire satisfaction of Engineer-in-charge.
(i) Maintenance of Seasonal flower beds for 1st year
(ii) Maintenance of Seasonal flower beds for 2nd year
(iii) Maintenance of Seasonal flower beds for 3rd year
Maintenance of outdoor vertical garden for one year, complete with replacement of plants, panels, drip equipment etc., replenishing decomposed media, watering and fertilization.
(i) Maintenance of vertical garden for 1st year
(ii) Maintenance of vertical garden for 2nd year
(iii) Maintenance of vertical garden for 3rd year
Providing a Horticulture works Expert /Site Supervisor on Chandigarh DC Rates for Look after All works of Horticulture and Landscaping for 3 years 3 years . 12 Months X 3 =36 Month s (DC Rate + @ 10% Contractor Profit )
(i) Horticulture Incharge for 1st year
(ii) Horticulture Incharge for 2nd year
(iii) Horticulture Incharge for 3rd year
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
DNIT.pdf
Tender Documents • 15.63 MB
Costing.pdf
Additional Documents • 6.76 MB
BOQ_347488.xls
BOQ • 0.51 MB
Corr01.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid