| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹99,500Accepted-Finance | ₹99,500 | L-1 | Accepted-Finance ok |
| 2 | L-2₹1.1 LRejected-Finance | ₹1.1 L | L-2 | Rejected-Finance ok |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Chauhan Engineering Works L2 | Ganesh Engineering Works L1 |
|---|---|---|---|---|---|
| 1.00 | Making and fixing of new SS410 sleeve on propeller shaft after removal of exiting sleeve (as per size of shaft) for 60 Cs pump P10 JLN Side. | 1 | No. | 6,800 ₹6,800 | 6,500 ₹6,500 |
| 2.00 | Supply and fixing of new synthetic rubber bush as per required size for 60 Cs pump P10 JLN Side. | 2 | No. | 3,500 ₹7,000 | 3,400 ₹6,800 |
| 3.00 | Making and fixing of new MS/CI bush as per size of rubber bush in diffuser for 60 Cs pump P10 JLN Side. | 1 | No. | 15,000 ₹15,000 | 14,500 ₹14,500 |
| 4.00 | Welding, machining & balancing of impeller for 60 Cs pump P10 JLN Side.s | 1 | No. | 13,000 ₹13,000 | 12,200 ₹12,200 |
| 5.00 | Making new SS cotter key & collet set of 60 Cs pump P10 JLN Side. | 1 | No. | 3,800 ₹3,800 | 3,500 ₹3,500 |
| 6.00 | Making and fixing of MS Guide ring having approx. (OD-660mm, ID-610mm, L-60mm) inside the suction bowl after turning/machining of suction bowl as per required size for 60 Cs pump P10 JLN Side. | 1 | No. | 28,000 ₹28,000 | 26,000 ₹26,000 |
| 7.00 | Making and fixing of new MS Coupling (as per sample) lower & upper for 50 Cs pump P3 M/G Side. | 1 | Set | 34,000 ₹34,000 | 30,000 ₹30,000 |
| 8.00The above rates are inclusive of all kind of taxes including GST. Terms & Conditions as mentioned in Bid document in Price Schedule. | |||||
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
22 Dec 2025, 2:00 pmClosed
Executive Engineer, W.S. Mech. Division, Rewari
Executive Engineer, W.S. Mech. Division, Rewari
Repairing of 60Cs. Pump (P10 JLN side) and 50Cs. Pump (P3 MG side) at Pump house JF-2
2025_HRY_490553_2
2396/6-A dated 11.12.2025
Open Tender
Pumps/Motors
30 days
Executive Engineer, W.S. Mech. Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹2,000
19 Mar 2026
15 Dec 2025
22 Dec 2025
15 Dec 2025
22 Dec 2025
15 Dec 2025
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Water Services Mechanical Division, Rewari
Name of Work: Repairing of 60Cs. Pump (P10 JLN side) & 50Cs. Pump (P3 M/G side) at Pump house JF-2.
Contract No: 2396/6-A dated 11.12.2025.
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Making and fixing of new SS410 sleeve on propeller shaft after removal of exiting sleeve (as per size of shaft) for 60 Cs pump P10 JLN Side. 1 1 No. Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2 Supply and fixing of new synthetic rubber bush as per required size for 60 Cs pump P10 JLN Side. 2 2 No. Excess(+) Full Conversion INR
3 Making and fixing of new MS/CI bush as per size of rubber bush in diffuser for 60 Cs pump P10 JLN Side. 3 1 No. Excess(+) Full Conversion INR
4 Welding, machining & balancing of impeller for 60 Cs pump P10 JLN Side.s 4 1 No. Excess(+) Full Conversion INR
5 Making new SS cotter key & collet set of 60 Cs pump P10 JLN Side. 5 1 No. Excess(+) Full Conversion INR
6 Making and fixing of MS Guide ring having approx. (OD-660mm, ID-610mm, L-60mm) inside the suction bowl after turning/machining of suction bowl as per required size for 60 Cs pump P10 JLN Side. 6 1 No. Excess(+) Full Conversion INR
7 Making and fixing of new MS Coupling (as per sample) lower & upper for 50 Cs pump P3 M/G Side. 7 1 Set Excess(+) Full Conversion INR
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_568846.xls
BOQ • 0.29 MB
bid.pdf
Additional Documents • 0.17 MB
Download all tender documents and submit your bid