Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹10.0 Laccepted-finance | ₹10.0 L | accepted-finance |
Tender Value
₹12.7 L
EMD Value
₹31,753
Closing Date
1 Apr 2026, 10:00 pmClosed
Directorate of Municipal Administration
deck slab and road construction needed
278566
DMA/2025-26/RD/WORK_INDENT56300
Open
Roads
DMA City Corporation Tumakuru
3 documents required · 3 mandatory
₹500
₹31,753
1 Apr 2026
18 Mar 2026
25 Mar 2026
Development of road and drain deckslab in the road of ward 13 alla huakbar masjidh and laying of covering on drains of kuripalya
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coars...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating Each depos...
Compacting Original Ground - Compacting original ground supporting embankment - Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of emba...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 150...
Formwork Addendum 1- Percentage Additionalities for Formwork, Centering, & Scaffolding. Consider 35% of item concrete rate for drain walls
Providing and laying 100mm thick pre-cast cover slabs over drains & Rain pit of width not exceeding 800 mm using M20 concrete reinforced with Micro Alloyed High carbon steel with 3mm - 3ply wired stee...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW1 56300.doc
Tender Document • 0.31 MB
Download all tender documents and submit your bid