Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 23B ANIL KUMAR BANSAL 23B SADAR BAZAR 941 JHANSI UTTAR PRADESH 284001 UDYAM UP 39 0001184 | JHANSI | UTTAR PRADESH | 284001 | Accepted-Technical substaintially responsive |
| 2 | Accepted-Technical 0 BANI MOHAN ROAD SAROJNI NAGAR VILL AND POST TIRWA BANTHRA LUCKNOW UTTAR PRADESH 226401 UDYAM UP 50 0138308 | LUCKNOW | UTTAR PRADESH | 226401 | Accepted-Technical substaintially responsive |
| 3 | Accepted-Technical | Accepted-Technical substaintially responsive |
Updated dates
Tender Value
Refer Docs
EMD Value
₹3.3 L
Closing Date
16 Feb 2026, 12:00 pmClosed
SE EM Circle PWD Kanpur
SE EM Circle PWD Kanpur
Janpaad Banda me Dhuredi Lohra Parampuwa Marg ke Madhya Pradesh ki Antarrajiya sema par do len gate par prakash Vyvastha va panch varsiya anurashan ka karya
2026_CEEMP_1108877_1
1826C/4C-EMC/2025-26 dated 30.12.2025
Open Tender
Electrical Works
120 days
Banda
3 documents required · 3 mandatory
₹854
EE EM Division PWD Kanpur
₹3.3 L
EE EM Division PWD Kanpur
12 Mar 2026
23 Jan 2026
16 Feb 2026
23 Jan 2026
16 Feb 2026
23 Jan 2026
27 Jan 2026
Supply/ Fixing , testing and commissioning of 6 mtr All in one Solar Integrated pole system with aesthetically designed road lighting optic luminaire of IP 66 & Integrated Pole 6 Mtr. Solar pole Light. (i) System lumen > 6500Lm with efficacy of >150 lm/watt. System wattage shall not be more than 45 W. Life expectancy >50000 Hr, color temperature 3000k/4000K/5700, standard light profile 6 H 100% + 6 H 50%, CRI >70, average lighting beam angle 120 degree, housing pressure die cast aluminum with corrosion resistance polyester powder coated, Impact resistance > IK 07, lamp starting time should be not more than 10 seconds. thermal management system should be provided and LED must be mounted on heat conductive aluminum sink with suitable large are surface be means of fins to dissipate the heat to ambient air. Over voltage Protection. (ii).Luminaire should confirm to applicable IEC 61000-3-2, IEC 61547, IEC 61000-3-2, IEC61547, 2 Battery capacity minimum 100 Ah, LiFePO4 , life cycle minimum 2000 @ 90% DOD with IP 68, dimension maximum 120x146x470mm , 13.2 kg, Battery should comply with IS 16406:2015/IEC 62133:2012, BIS certification etc.With minimum Backup for Two days @ standard light profile 6 Hr 100% + 6 Hr 50% per day. (iii). PV module- Mono-Si minimum 400Wp / 23Voc Dimension not more then 172x172x4000 mm, solar cell efficiency minimum 16.4 %, 8 site string, total nominal peak power output minimum 400wp, each shall be min 50Wp. Shall comply IEC61215. (iv). Total column length 6 mtr. with min. 12 mm thick reinforced base plate, or Total column length 6 mtr. with lower 2.0 mtr. galvanized / powder coated MS Pipe of min. 04 mm thick with min. Upper 4 mtr. Aluminum alloy to hold solar PV module. (v)Foundation 1:2:4 RCC Cross section:-minimum 450x450 mm , Deep:-minimum 1200mm Foundation Bolt:- minimum 20mm dia and 600mm long. Test Report 1. Standard fixture should confirm to applicable IEC 60598-1, IEC 61000-3-2, IEC 61547, LM 79 & LM 80, BIS 2. Test report for LED LM 80 (IS-16105), Internal wiring, fiber glass, insulted multistrand wire. 3. Over voltage Protection Declaration of Conformity safety compliance report for charge controller and should be certified as per IEC 60598-1, IEC 61000-3-2, IEC 61547. 4. Test report for vertical pole tested for shock & vibration, wind force to meet safety parameters 5. Battery test report from 3rd party, along with other test reports. 6. IEC certificate for IEC 60598-2-3and only IEC certificates from reputed laboratory/testing centre NABL approved. Complete system shall be complete in all respect along with foundation, carrying forwarding, storage, and system approved by Engineer in charge.Complete system shall be complete in all respect along with foundation.
Maintenance for 5 years (Including 1st year defect liability), comprehensive operation and maintenance of all in one integrated pole solar light system. @ 2.5 % / Year of basic rates.
Total Cost
Note :- G.S.T. @ 18% Extra
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
T1.pdf
Tender Documents • 1.35 MB
BOQ_2047552.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid