| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.0 CrAccepted-AOC GODREJ WATERSIDE BUILDING TOWER I 4TH FLOOR BLOCK DP SECTOR V SALT LAKE KOLKATA 700 091 | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹87.0 Cr | L1 | Accepted-AOC AS PER BOQ |
| 2 | L2₹90.8 CrRejected-AOC | ₹90.8 Cr | L2 | Rejected-AOC AS PER BOQ |
| 3 | Not Admitted-PreQual/Technical 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-PreQual/Technical 142 | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹1.9 Cr
Closing Date
1 Dec 2020, 2:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER Gandak Irrigation Work Circle-I, Gorakhpur
Construction of Rohin Barrage-3 on River Rohin in District Maharajganj
2020_UPIDC_523043_2
03/SE/2020-21
Open Tender
Civil Works
NAUTNWA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,354
₹1.9 Cr
Yes
30 Mar 2021
21 Nov 2020
1 Dec 2020
21 Nov 2020
1 Dec 2020
21 Nov 2020
Amount
Construction of Rohin Barrage
Earth work in excavation for the foundation of structures all type of soil . including uplift/downlift up to 7.00 metre and lead upto 180 m, including backfilling with watering and ramming of backfill earth in trenches including all cost of materials, labour and T&P etc. proper completion of the work.
Boring with hydraulic piling rigs with power units, providing and installing cast-in-situ single under reamed pile of specified diameter and length below the pile cap in M-25 cement concrete, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with benotonite solution and the length of pile to be embedded in the pile cap etc. all complete.
Supplying and Driving of Z- type sheet Pile as per specifications and driving vertically by vibro sinker including all cost of materials, labour, T&P etc. required for proper completion of the work.
Plain cement concrete 1:3:6 (M-10) in foundation with crushed stone aggregate size 20 mm to 40 mm, Batching plant mixed, placing and compacted by mechenical vibrator including curing, coarse sand to be used having F.M.>2 including cost of all materials, labour and T&P etc with all leads and lift, proper completion of the work..
Plain cement concrete 1:2:4 (M-15) in for CC Block & Toe wall with crushed stone aggregate size 10 mm to 20 mm, Batching plant mixed, placing and compacted by mechenical vibrator including curing, coarse sand to be used having F.M. Not less than 2.5 including cost of all materials, labour and T&P etc with all leads and lift, proper completion of the work.
Plain Cement concrete 1:1.5:3 (M-20) with crushed stone aggregate Size 10 mm to 20 mm, Batching plant mixed, placing and compacted by mechenical vibrator including curing, coarse sand to be used having F.M. F.M.>2 including cost of all materials, labour and T&P with all leads and lift, proper completion of the work.
Reinforced cement concrete 1:1:2 (M-25) with crushed stone aggregate Size 10 mm to 20 mm, Batching plant mixed, placing and compacted by mechenical vibrator including curing, coarse sand to be used having F.M. F.M.>2 including cost of all materials, labour and T&P etc with all leads and lift, proper completion of the work..
Reinforced cement concrete 1:0.75:1.5 (M-30) with crushed stone aggregate Size 10 mm to 20 mm, Batching plant mixed, placing and compacted by mechenical vibrator including curing, coarse sand to be used having F.M. F.M.>2 including cost of all materials, labour and T&P etc with all leads and lift, proper completion of the work..
Providing and laying Steel Reinforcement TMT Steel bars Fe-500 including cost of steel, shaping, cutting, bending, placing in position with help of spacer blocks and chair bar, binding with steel binding wire etc., labour and T&P with all leads and lift, proper completion of the work.
Earth work in construction of Guide bund by transported earth from 1.00 km with mechanical compaction by vibratory roller in layer of 150 mm mixed with water of OMC including cost of labour and T&P etc with proper completion of the work.
Providing and laying in G.I. wire crates 1.50x1.50x1.00 Mtr with Mesh Size 20X20 cm with Mirzapur Stone Boulder 25 to 60 kg wt. for apron at least 85% of stone shall weighing 40kg including cost of all materials, labour and T&P etc with all leads and lift, proper completion of the work.
Providing and laying Mirzapur Stone Boulder 25 to 60 kg wt. for pitching at least 85% of stone shall weighing not less than 40 kg including cost of all materials, labour and T&P etc with all leads and lift,,proper completion of the work.
Providing and laying Geo textile sheet made of 240 gsm woven multifilament polypropylene yarn including cost of all materials, labour and T&P etc with all leads and lift, proper completion of the work.
Providing and laying fine coarse sand (Sonbhadra) in graded filter including cost of all materials, labour and T&P etc with all leads and lift, proper completion of the work.
Providing and laying medium coarse sand (Sonbhadra) in graded filter including cost of all materials, labour and T&P etc with all leads and lift, proper completion of the work.
Providing and laying coarse sand (Sonbhadra) F.M. F.M.>2 in graded filter including cost of all materials, labour and T&P etc with all leads and lift, proper completion of the work.
Supplying and fixing of 50 mm dia G.I. Pipes for raling with G.I. fittings and clamps with electric welding including cost of all materials, labour and T&P with all leads and lift, proper completion of the work.
Supplying and fixing of 80 mm dia G.I. Pipes for railing with G.I. fittings and clamps with electric welding including cost of all materials, labour and T&P etc with all leads and lift, proper completion of the work.
Supplying and fixing of Base of Post 7mm thik Steel Plate size (20Cmx30Cm=0.06 Sqm) with electric welding including cost of all materials, labour and T&P etc with all leads and lift, proper completion of the work.
Boring with 150 mm diameter casing pipe including lowering and extraction of assembly, loading, unloading and carriage including cost of all materials, labour and T&P etc. proper completion of the work.
Running of generator set pump for dewatering including arrangement of Pump suction and delivery pipes and other accessories at site including cost of Power/P.O.L. all materials, labour and T&P etc. proper completion of the work.
Providing and fixing in position 20 mm thick premoulded joint filler board in expansion joints covered with proper completion of the work.
Supplying and fixing copper seal in position including cost of all materials, labour and T&P with all leads and lift, cutting, forming, brazing, fixing in position covered with proper completion of the work.
Supplying and fixing rubber water stop/seal in position including cost of all materials, labour and T&P etc with all leads and lift, cutting, forming, fixing and maintaining them in position for proper completion of the work.
Centering and shuttering for C.C. work with steel plate and supported on lock bars including cost of all materials, labour and T&P etc with all leads and lift, proper completion of the work.
Centering and shuttering for RCC work with steel plate and supported on lock bars including cost of all materials, labour and T&P etc with all leads and lift, proper completion of the work..
Supplying and fixing in position true to line and level sliding steel plate bearing with PTFE surface sliding including cost of all materials, labour and T&P, carriage, with proper completion of the work.
Supplying and fixing in position true to line and level elastomeric bearing conforming to IRC 83 complete including cost of all materials, labour and T&P, carriage, with proper completion of the work.
Two coat Sky Blue Enamel Paint over one coat applied Red Oxide metal primer for smooth finishing and painting required thinner including cost of all material, labour and T&P etc with proper completion of the work.
Two coat Black bitumen Enamel Paint over one coat applied Red Oxide metal primer for smooth finishing and painting required thinner including cost of all material, labour and T&P etc with proper completion of the work.
Approch Kharanja Road for Village Mahadeiya
Earth work in construction of approch road for village of Mahadeiya with 180m lead with mechanical compaction by vibratory roller in layer by layer including cost of labour and T&P etc with proper completion of the work.
Dry brick on edge soling with 1st class brick including preparation of sub-grade to prescribed camber, filling joint with loose earth including the cost material labour and T&P all lead and lift etc proper completion of work.
Constructing Diversion Bundh (Three Times)
Earth work in excavation with dressing in dumat or loam soil for maintaining proper section of proposed link channel Rohin Canal system including lead of 30 m and lift upto 1.50 m with cost of labour and T&P etc with proper completion of the work.
Earth work in construction of diversion bund by transported earth from 1.00 km with mechanical compaction by vibratory roller in layer of 150 mm mixed with water of OMC including cost of labour and T&P etc with proper completion of the work.
Providing and laying Nylon cretes size (1.0 m x1.0 m x1.0m) with mesh size 20x20cm. & weight of not less than 300 gram each, new E.C.Bags filled with R.B.M tying and sewing with suitali including cost of all materials, labour and T&P etc with proper completion of the work.
Providing and pitching new E.C.Bags filled with R.B.M tying and sewing with suitali including cost of all materials, labour and T&P etc with proper completion of the work.
Providing and laying Plastic sheet,1.25 mm thick sewing and placing of sheets in proper position including cost of all materials, labour and T&P etc with proper completion of the work.
Removing Temporary Diversion Bundh (Three Times)
Earth work in Cutting and Removal of diversion bund and its proper disposal upto 180 mtr including all leads, lifts, labour, T&P etc. with proper completion of the work.
Compaction by Mechanical equipment from Cutting and Removal of diversion bund including all leads, lifts, labour, T&P etc. with proper completion of the work.
Earth work in construction of rasing bundh Left Bank and Right Bank of Bundh
Earth work in construction of bundh and diversion bund with mechanical compaction by roller in layer of 150 mm including all cost of lead, lift, labour and T&P etc with proper completion of the work.
M/S ARUN CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf