Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.5 LAccepted-AOC H NO 1939 1 MOHALLA SHAMSHER SINGH TRIVENI CHOWK PATIALA | PATIALA | PUNJAB | 140401 | L1 | Accepted-AOC L1 | |
| 2 | L2₹34.0 L+₹46,749 (1.40%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹32.2 L
EMD Value
₹68,000
Closing Date
6 Jan 2020, 10:00 amClosed
Executive Engineer Drainage Division Patiala
Executive Engineer Drainage Division Patiala
Estimate Scheme to drain out flood drain water from low lying agriculture land of village Main, Jalal Khera and Dudarh into Jacob Drain at RD 27700 L
2019_WR_42364_1
06/Spl
Open Tender
Civil Works - Others
Item Rate
90 days
Executive Engineer Drainage Division Patiala
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
TIA
₹68,000
Yes
27 Feb 2020
24 Dec 2019
6 Jan 2020
24 Dec 2019
6 Jan 2020
24 Dec 2019
Amount
EXCAVATION IN SOIL(ANY TYPE) USING HYDRAULIC EXCAVATOR CK 90 AND . EXCAVATION IN SOIL WITH HYDRAULIC EXCAVATOR OF 0.9 CUM BUCKET CAPACITY INCLUDING CUTTING,TRIMMING BOTTOM AND SIDE SLOPE ACCORDANCE WITH REQUIREMENT OF LINES, GRADES AND CROSS SECTION I/C ALL LIFTS AND COMBINED LEAD UPTO 60MTR.
PROVIDING & LAYING PLAIN CEMENT CONCRETE 1:3:6 (M-10) MECHANICAL MIXED WITH STONE BLAST I/C S/O &C/O MATERIAL COMPLETE IN ALL RESPECTS.
LAYING OF FIRST CLASS BRICK WORK 1:4 CSM IN FOUNDATION AND PLINTH COMPLETE IN ALL RESPECT.
CEMENT PLASTER 1:3, 12.50MM THICK INCLUDING S/O AND C/O MATERIAL COMPLETE IN ALL RESPECTS.
LAYING OF REINFORCED CEMENT CONCRETE M-20 I/C S/O & C/O MATERIAL AND MECHANICAL MIXER & VIBRATOR BUT EXCLUDING THE COST OF STEEL REINFORCEMENT COMPLETE IN ALL RESPECT AS PER PWD SPECIFICATION.
STEEL REINFORCEMENT BARS OF GRADE FE 500 (IS 1786-2008) I/C BENDING & BINDING , S/O & C/O AND LOADING & UNLOADING OF STEEL REINFORCEMENT COMPLETE IN ALL RESPECT AS PER PWD SPECIFICATIONS.
CENTRING AND SHUTTERING FOR RCC SLAB
STRUCTURAL STEEL WORK IN FLATS, ANGLES, TEES/C RIVETING AND WELDING I/C COST OF MATERIAL COMPLETE IN ALL RESPECT.
DISMANTLING OF FLEXIBLE PAVEMENT (BITUMINOUS COURSE BY MECHANICAL MEANS AND DISPOSAL OF DISMANTLED MATERIAL UPTO LEAD 1000 MTR. COMPLETE IN ALL RESPECT.
PROVIDING & LAYING PLAIN CEMENT CONCRETE 1:2:4 (M-15) MECHANICAL MIXED WITH STONE BLAST I/C S/O &C/O MATERIAL COMPLETE IN ALL RESPECTS
RE-HANDLING OF EARTH WORK.
COMPACTION OF EARTHWORK IN 20CM LAYERS, DRESSING, WATERING, ROLLING OF EARTH COMPLETE IN ALL RESPECT.
The Kattu Co-op L and C Society Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .