Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.3 LAccepted-Finance | L1 | Accepted-Finance lowest quoted | |
| 2 | L2₹25.4 L+₹15,492.11 (0.61%)Accepted-Finance | L2 | Accepted-Finance second lowest |
Tender Value
Refer Docs
EMD Value
₹25,650
Closing Date
7 Mar 2024, 3:00 pmClosed
BDO VP
union office parangipettai
CONSTRUCTION OF VILLAGE SECRETARIAT BUILDING AT Ayepuram PANCHAYAT
2024_RDTN_432613_34
AGAMT 24-25 port
Open Tender
Civil Works - Buildings
Works
180 days
union office parangipettai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹25,650
Yes
8 Mar 2024
7 Mar 2024
7 Mar 2024
7 Mar 2024
7 Mar 2024
7 Mar 2024
7 Mar 2024 - 7 Mar 2024
Amount
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compou
Refilling with Excavated Earth including all charges etc
Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Supply and filling the basement with conveyed excavated earth other than sand complying the standard specification
Cement Concrete 1:4:8 (One Cement, Four sand and Eieght hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Brick work in Cement Mortar 1:5 using best quality of country bricks of size 8-3/4" x 4-1/4" x 2-1/4" for foundation and basement including curing, etc., complete complying with standard specification.below basement
Brick work in Cement Mortar 1:5 using best quality of country bricks of size 8-3/4" x 4-1/4" x 2-1/4" for foundation and basement including curing, etc., complete complying with standard specification.above basement
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting usbelow basement
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting usground level to basement
Reinforced Cement Concrete 1:11/2:3(One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) etc., complete complying with standard specification and as directed by the departmental officers below basement
Reinforced Cement Concrete 1:11/2:3(One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) etc., complete complying with standard specification and as directed by the departmental officers basement To ground floor
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S R constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .