Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.3 L+₹4,165 (0.20%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical MALIK COLONY 284 31 GOHANA ROAD SONIPAT 131001 | SONIPAT | SONIPAT | HARYANA | 131001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹21.0 L
EMD Value
₹42,043
Closing Date
21 Oct 2024, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NAVIN KUMAR
ED - Gurgaon
CONSTRUCTION OF GOVT COLLEGE FOR WOMEN AT BALLABHGARH IN FARIDABAD DISTRICT (PROVIDING 49KW ROOFTOP GRID CONNECTED SOLAR POWER PLANT).
2024_HRY_403305_1
20248E8583DF 1A93 43AA ACEA CDA07AB5C052664BAR
Open Tender
Civil Works
Works
90 days
Faridabad (MC)
2 documents required · 2 mandatory
₹1,000
₹42,043
Yes
15 Jan 2025
14 Oct 2024
22 Oct 2024
14 Oct 2024
21 Oct 2024
14 Oct 2024
14 Oct 2024 - 15 Oct 2024
Amount
Innovating Technologies, New Materials and Solar Panels NA SOLAR PANELS Supply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- (a) Solar Photovoltaic Module manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. other specifications as per DNIT in PDF. Above 10 kWp and up to 100 Kwp
Alfa Solar Solutions (BID ID -1154292)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .