Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | ₹3.0 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹3.1 LRejected-Finance | ₹3.1 L | L2 | Rejected-Finance High Rate Quoted |
| Sl No | Description | Qty | Unit | N VENKATESAN L2 | M V THIRUMAL L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation | 43.47 | m3 | 132 ₹5,738.04 | 131 ₹5,694.57 |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete for 10cum | 7.25 | m3 | 5,460 ₹39,585 | 5,457 ₹39,563.25 |
| 3.00 | Plain Cement Consrete 1:2:4 using 20mm jelly for wearing coat including laying, compacting, finishing and curing etc... | 19.04 | m3 | 6,862 ₹1.3 L | 6,861 ₹1.3 L |
| 4.00 | Plastering with Cement mortor 1.5 (one cement and Five P.Sand) 20 mm thick in all floors including curing etc. Complete complying with standard specification and as directed by the departmental officers | 31.05 | m3 | 590 ₹18,319.50 | 587 ₹18,226.35 |
| 5.00 | Centering and Shutering for Sids including all cost and conveyance and all labour charges exc... Complete | 165.6 | m3 | 400 ₹66,240 | 365 ₹60,444 |
| 7.00 | GST 18% | 1 | No | 46,896.3 ₹46,896.30 | 45,821.09 ₹45,821.09 |
| 8.00 | LWF 1% | 1 | No | 2,605.35 ₹2,605.35 | 2,545.62 ₹2,545.62 |
Tender Value
₹3.0 L
EMD Value
₹3,050
Closing Date
26 Dec 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER
BLOCK DEVELOPMENT OFFICE
Construction of Cross Drainage At Adhidrividar Kudiyiruppu Amman Koil Street in Korukkai
2025_RDTN_632239_1
A19/3721/2025 - Korukkai Drainage
Open Tender
Civil Works
90 days
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,050
8 Jan 2026
15 Dec 2025
26 Dec 2025
15 Dec 2025
26 Dec 2025
15 Dec 2025
Amount
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete for 10cum
Plain Cement Consrete 1:2:4 using 20mm jelly for wearing coat including laying, compacting, finishing and curing etc...
Plastering with Cement mortor 1.5 (one cement and Five P.Sand) 20 mm thick in all floors including curing etc. Complete complying with standard specification and as directed by the departmental officers
Centering and Shutering for Sids including all cost and conveyance and all labour charges exc... Complete
N VENKATESAN (BID ID -1545832)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_756419.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid