Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
15 Aug 2022, 6:00 pmClosed
EXECUTIVE ENGINEER REW DODA
OFFICE OF THE EXECUTIVE ENGINEER REW DODA
Repair/Renovation UPS Kora Kalihand Pyt Kalihand Block Dali-Udhyanpur (Capex)
2022_RDPR_179256_23
e-NITNo36/capex of REW Doda 2022-23 DT 15.7.2022
Open Tender
Civil Works
Item Rate
60 days
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Rural Development and Panchayati Raj
₹2,000
22 Aug 2022
18 Jul 2022
16 Aug 2022
18 Jul 2022
15 Aug 2022
18 Jul 2022
Amount
Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:
Providing and fixing false ceiling with 12 mm thick plain/ semi perforatedor with design ceiling tiles of BWP type phenol formaldehyde synthetic resin bonded pressed particle board conforming to IS:3087, finished with a coat of aluminum primer on both sides & edges, including two coats of synthetic enamel paint of approved quality on exposed face, fixed to a grid made out of anodized aluminum (with 15 micron anodic coating) Tsections 35 x15x1.5 mm size main runners, cross runners 23.5x19x1.5 mm fixed to main runners placed 600 mm centre to centre both ways so as to form a grid of 600 mm square. The frame work shall be suspended from ceiling by level adjusting hangers of 6 mm dia M.S rod fixed to roof slab by means of ceiling cleats and dash fastener. The suspenders shall be placed 600 x 1200 mm centre to centre including fixing to the frame with C.P brass screws and applying a priming coat of zinc chromate yellow primer (aluminum frame work shall be paid separately)
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3coarse sand : 6 graded stone aggregate 20 mm nominal size) INCL ALL CARRIAGES
CIB (citizen information Board ) size 4'00"x5'00"x0'9" (above plinth level) with tepered top having 20 degree slope in Brick Masonary(1:4) including plaster , paint, lettering and logos as per instruction of Engineer -in-charge including carriage of material. ( complete job)
Mohd Younis
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .