| 1 | 1₹29.9 LAccepted-Finance | ₹29.9 L | 1 | Accepted-Finance lowest bid among all and proper responisve documents |
| 2 | Rejected-Technical CHENNAI CIRCLE CHENNAI 6 | - | - | Rejected-Technical notadmitted |
| 3 | Rejected-Technical NO 101 A KILMUDALAMBEDU POST PERUVOYAL VILL GUMMIDIPOONDI TALUK TIRUVALLUR 601206 | GUMMIDIPOONDI | TIRUVALLUR | TAMIL NADU | 601206 | - | - | Rejected-Technical notadmitted |
| 4 | Rejected-Technical NO 5 TNHB OFFICE COMPLEX R 40 A AMBATTUR ESTATE MAIN ROAD MUGAPPAIR CHENNAI 600037 | CHENNAI | TAMIL NADU | 600037 | - | - | Rejected-Technical notadmitted |
| Sl No | Description | Qty | Unit | P SIVARAMA REDDY L1 | M/s. SARASWATHI ENTERPRISES L2 | REJE COATING SYSTEMS PVT LTD L3 | M/s. KVR & CO L4 |
|---|---|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF NEW AUDITORIUM AND REPAIRS TO BOYS AND GIRLS TOILET AND DRAMA STAGE AT GOVT WELFARE HIGHER SECONDARY SCHOOL THERVOY IN THERVOY PANCHAYAT | |||||||
| 2.00 | Earth Work Excavation and depositing on bank with initial lead and lift in hard soil and subsoil with ordinary soil in expect soil as per heavy machinery work etc.,As per SS20B..etc complete.. | 54.07 | m3 | 250 ₹13,517.50 | 263.5 ₹14,247.45 | 263 ₹14,220.41 | 350 ₹18,924.50 |
| 3.00 | C.C 1:4:8 Mix Using 40mm ISS HBG Metal from an approved quarry including cost and conveyance and all materials and all labour charges etc,.Completed. | 16.85 | m3 | 6,100 ₹1.0 L | 6,146.5 ₹1.0 L | 6,146 ₹1.0 L | 6,146.5 ₹1.0 L |
| 4.00 | Supply and Fabrication of Steel including all cost and conveyance of all materials and all labour charges etc,.completed. | 4.42 | MT | 92,000 ₹4.1 L | 92,016.5 ₹4.1 L | 92,016 ₹4.1 L | 92,016.5 ₹4.1 L |
| 5.00 | Reinforced Cement Concrete Mix M30 grade using 10mm & 20mm Hard blue granite Broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering, strutting, shuttering but including cost of all materials mixing, laying, Vibrating the concrete with mechanical vibrators, ramming, consolidating, finishing and curing etc., Complete and as directed by the TWAD Board Officers. Upto Basement | 14.43 | m3 | 9,000 ₹1.3 L | 9,910.5 ₹1.4 L | 9,910 ₹1.4 L | 9,910.5 ₹1.4 L |
| 6.00 | Reinforced Cement Concrete Mix M30 grade using 10mm & 20mm Hard blue granite Broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering, strutting, shuttering but including cost of all materials mixing, laying, Vibrating the concrete with mechanical vibrators, ramming, consolidating, finishing and curing etc., Complete and as directed by the TWAD Board Officers. Above Basement | 24.16 | m3 | 10,000 ₹2.4 L | 10,052 ₹2.4 L | 10,052 ₹2.4 L | 10,052 ₹2.4 L |
| 7.00 | Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG10 stiffened with MS angle of size 25 X 25 X 3 mm for boarding laid over I type MS Truss of size 25 X 25 X 3mm about 90cm c/c and supported by 40mm GI pipes (Medium) spaced at 75cm c/c etc complete and as directed by the TWAD Board Officers. Upto Basement | 75.91 | m2 | 545 ₹41,370.95 | 547.5 ₹41,560.73 | 547 ₹41,522.77 | 547.5 ₹41,560.73 |
| 8.00 | Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG10 stiffened with MS angle of size 25 X 25 X 3 mm for boarding laid over I type MS Truss of size 25 X 25 X 3mm about 90cm c/c and supported by 40mm GI pipes (Medium) spaced at 75cm c/c etc complete and as directed by the TWAD Board Officers. Above Basement | 219.83 | m2 | 1,095 ₹2.4 L | 1,095 ₹2.4 L | 1,095 ₹2.4 L | 1,500 ₹3.3 L |
| 9.00 | Brick Work in CM 1:5 Mix using 20mm thick Stock Bricks including chamber bricks cost and conveyance of all materials and labour charges etc,..completed.,Upto Basement | 5.47 | m3 | 6,300 ₹34,461 | 6,291 ₹34,411.77 | 6,291 ₹34,411.77 | 6,291 ₹34,411.77 |
| 10.00 | Above Basement | 27.36 | m3 | 6,350 ₹1.7 L | 6,384 ₹1.7 L | 6,384 ₹1.7 L | 6,384 ₹1.7 L |
Tender Value
₹31.5 L
EMD Value
₹31,495
Closing Date
29 Dec 2025, 3:00 pmClosed
BDO BP
BDO BP GUMMIDIPOONDI
construction of new auditorium and repairs work in thervoy panchayat
2025_RDTN_635728_1
RC/3310/2025/A2
Open Tender
Civil Works - Buildings
180 days
bdo bp
refer tender documents
4 documents required · 4 mandatory
₹0
₹31,495
Yes
5 Jan 2026
24 Dec 2025
29 Dec 2025
24 Dec 2025
29 Dec 2025
24 Dec 2025
Amount
CONSTRUCTION OF NEW AUDITORIUM AND REPAIRS TO BOYS AND GIRLS TOILET AND DRAMA STAGE AT GOVT WELFARE HIGHER SECONDARY SCHOOL THERVOY IN THERVOY PANCHAYAT
Earth Work Excavation and depositing on bank with initial lead and lift in hard soil and subsoil with ordinary soil in expect soil as per heavy machinery work etc.,As per SS20B..etc complete..
C.C 1:4:8 Mix Using 40mm ISS HBG Metal from an approved quarry including cost and conveyance and all materials and all labour charges etc,.Completed.
Supply and Fabrication of Steel including all cost and conveyance of all materials and all labour charges etc,.completed.
Reinforced Cement Concrete Mix M30 grade using 10mm & 20mm Hard blue granite Broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering, strutting, shuttering but including cost of all materials mixing, laying, Vibrating the concrete with mechanical vibrators, ramming, consolidating, finishing and curing etc., Complete and as directed by the TWAD Board Officers. Upto Basement
Reinforced Cement Concrete Mix M30 grade using 10mm & 20mm Hard blue granite Broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering, strutting, shuttering but including cost of all materials mixing, laying, Vibrating the concrete with mechanical vibrators, ramming, consolidating, finishing and curing etc., Complete and as directed by the TWAD Board Officers. Above Basement
Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG10 stiffened with MS angle of size 25 X 25 X 3 mm for boarding laid over I type MS Truss of size 25 X 25 X 3mm about 90cm c/c and supported by 40mm GI pipes (Medium) spaced at 75cm c/c etc complete and as directed by the TWAD Board Officers. Upto Basement
Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG10 stiffened with MS angle of size 25 X 25 X 3 mm for boarding laid over I type MS Truss of size 25 X 25 X 3mm about 90cm c/c and supported by 40mm GI pipes (Medium) spaced at 75cm c/c etc complete and as directed by the TWAD Board Officers. Above Basement
Brick Work in CM 1:5 Mix using 20mm thick Stock Bricks including chamber bricks cost and conveyance of all materials and labour charges etc,..completed.,Upto Basement
Above Basement
Plastering with in CM 1:5 Mix using 12mm thick including cost and conveyance of all materials and all labour charges etc,.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with Cement Mortar 1:4 (One Cement and Three P.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
Supplying and fixing of Steel Doors with Pannel Size 1.80mX2.10m including other cherges etc,.completed.
Supplying and fixing of Steel windows of size 1.50X1.30m with including other cherges etc,.completed.
Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Distembering two coats oil bound distember over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( Inner wall )
Ext.Emulsion painting two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( outer wall )
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance and materials and all labour charges etc,.completed.
Supply and delivery of 1000lit capacity Sintex tank including cost and conveyance and materials of all labour charges etc,..complete,..SOR - P23-(M-0821)
Wiring with 2 x 1.5 sq.mm. (22 / 0.3) PVC insulated SC unsheathed copper conductor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessoires in flush with wall with 3mm thick hylum sheet cover with TW switch box and 5A FT switch and making good of the concealed portion with suitable colour for PVC concealed light / fan Point (for electronic regulator) (5 points per coil) (SD No.25) (P.NO-15) Light Point
Fan Point
Supply and fixing of 4'-18W LED tube with fitting inclusive of all charges SOR PNO:168-M 1272
Wiring with 2 x 1.5 sq.mm. (22 / 0.3) PVC insulated SC unsheathed copper conductor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories in flush with wall with 150mm x 100mm x 113mm TW switch box with 3mm thick hylem sheet cover for 5A 3 pin non inter locking wall socket with 5A flush type switch with continuous earth wire connection of 14 SWG TC wire and making good of the concealed portion with suitable colour for concealed PVC plug point SD38 SOR(P.NO.23)
Supply and fixing of 1200mm (48") sweep AC ceiling fan complete with stepped electronic 300W regulator with 1 metre down rod with fan clamp with side plates and cross arm of size 450mm (18") SD 106(P.NO-50)
Supply and fixing of WT bulk head fitting with guard suitable for 11W CFL lamp with CFL (SD N0.83) (P.NO-40)
Supply and fixing of TNEB meter board suitable for 32A single phase service connection with 32A fuse unit (500V) 32A neutral link and earth link (1" x 1/8" copper flat) on TW plank of size 375mm x 300mm x 19mm with supporting TW reepers of 1" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EB meter to fuse unit (SD No. 125)(P.NO-55)
Earthing as per PWD standard with an earth electrode of 2 metre Class 'B' GI pipe of dia not less than 32mm complete with necessary masonry work SD 234(P.NO-98)
Provision for EB Deposit Charges
Provision for Water Supply Arrangements
Provision for Rain Water Harvesting for 3 Nos
Provision for Name board Charges
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Brick Work in CM 1:5 Mix using 20mm thick Stock Bricks including chamber bricks cost and conveyance of all materials and labour charges etc,..completed.,
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers
Brick partition walls using country bricks of size 83/4"x41/4"x23/4" etc., complete.
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Plastering with Cement Mortar 1:4 (One Cement and Three P.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats with Exterior/interior first quality Emulsion of approved colour over one coat of primer scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats over new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
Repairs of Doors
Solid PVC Door shutter using 19 gauge 19mm MS sq. tubes for styles and outer frames, 15mm MS sq. tubes for top, lock and bottom rails. The steel tubes shall be covered with 5mm thick solid PVC sheets. Shutter using 5mm thick solid PVC sheets for paneling shall rigidly fixed in position including necessary furniture and fittings. The over all size of styles shall be 50mm x 30mm. The over all size of top rail, lock rail and bottom rail shall be 75mm x 30mm. The over all size of frames shall be 50mm x 45mm, with suitable suitable rebate for housing the shutter.
Provision for Europeon Water Closet
Provision for water supply arrangements
Provision for Lock & Key
Provision for Electricfication charges
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Brick Work in CM 1:5 Mix using 20mm thick Stock Bricks including chamber bricks cost and conveyance of all materials and labour charges etc,..completed.,
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats with Exterior/interior first quality Emulsion of approved colour over one coat of primer scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats over new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete
Repairs of Doors
Solid PVC Door shutter using 19 gauge 19mm MS sq. tubes for styles and outer frames, 15mm MS sq. tubes for top, lock and bottom rails. The steel tubes shall be covered with 5mm thick solid PVC sheets. Shutter using 5mm thick solid PVC sheets for paneling shall rigidly fixed in position including necessary furniture and fittings. The over all size of styles shall be 50mm x 30mm. The over all size of top rail, lock rail and bottom rail shall be 75mm x 30mm. The over all size of frames shall be 50mm x 45mm, with suitable suitable rebate for housing the shutter.
Provision for Europeon Water Closet
Provision for water supply arrangements
Provision for Lock & Key
Provision for Electricfication charges
Provision for Sanitary Arrangements
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Brick Work in CM 1:5 Mix using 20mm thick Stock Bricks including chamber bricks cost and conveyance of all materials and labour charges etc,..completed.,
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Distempering Primer coats with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Provision for Electricfication charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M/s. SARASWATHI ENTERPRISES (BID ID -1546377)
REJE COATING SYSTEMS PVT LTD (BID ID -1548119)
M/s. KVR & CO (BID ID -1546385)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Tender_Document_Thervoy.pdf
Tender Documents • 0.88 MB
BOQ_760820.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid