Tender Value
₹73.4 L
EMD Value
₹1.5 L
Closing Date
29 Sept 2026, 5:00 pm2d left
Executive Engineer
HPPWD Division Nadaun
C/O Cremation Shed, Bath room i/c WS , SI, Boundary wall, Site development and C/O Sitting Shed etc
2026_PWD_143214_2
C/O Moksh Dham at village Plasi P.O. Pahal Tehsil Galore Distt. Hamirpur.
Open Tender
Civil Works - Others
Percentage
180 days
Nadaun
Please refer Tender documents.
17 documents required · 17 mandatory
₹2,000
₹1.5 L
23 Sept 2026
23 Sept 2026
30 Sept 2026
23 Sept 2026
29 Sept 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains for all kinds of soil and ordinary rocks including dressing of sides and ramming of bottoms upto all lifts including getting out the excavated soil and disposal and transportation of surplus excavated soil / unuseful material for disposing at dumping site( to be arranged by the contractor) within all leads and lifts including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 90.42 | Per Cubic meter | 208.94 | ₹18,892.35 |
| 2 | Providing and laying in position cement concrete of specified grade 1:4:8 (one cement : four coarse sand : eight graded stone aggregate) 40mm ( forty millimetre) nominal size graded stone aggregate upto plinth level excluding the cost of centering and shuttering including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 112.26 | Per Cubic meter | 4,406.77 | ₹4,94,704 |
| 3 | Providing and laying in position cement concrete of specified grade 1:1.5:3 (one cement : four coarse sand : eight graded stone aggregate) 20mm ( twenty millimetre) nominal size graded stone aggregate upto plinth level excluding the cost of centering and shuttering in columns, piers, abutments, pillars, posts,
struts etc. including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 37.09 | Per Cubic meter | 6,000 | ₹2,22,540 |
| 4 | Providing and construction of brick work using Second class common burnt clay building bricks in sub or super-structure upto all floor level in cement mortar 1:6 (One cement isto Six sand) and curing complete including carriage of material within all leads, lifts and other incidentals as per approved specifications, drawing, design and as directed by the Engineer-in-charge. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 35.1 | Per Cubic meter | 7,199.84 | ₹2,52,714.38 |
| 5 | Providing and construction of second class half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 (Seven point five) in superstructure above plinth up to all floor level in cement mortar 1:4 (One cement : four sand) and curing complete including carriage of material within all leads, lifts and other incidentals as per approved specifications, drawing, design and as directed by the Engineer-in-charge. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 38.12 | Per Square meter | 833.98 | ₹31,791.32 |
| 6 | Centering and shuttering including strutting, propping etcetera and removal of form work Columns, piers, abutments, pillars, posts and struts complete upto all floor level including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 186.27 | Per Square meter | 621.95 | ₹1,15,850.63 |
| 7 | Centering and shuttering including strutting, propping etcetera and removal of form work Lintels, beams, plinth beams, girders, bressumers and cantilevers complete upto all floor level including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 133.44 | Per Square meter | 487.88 | ₹65,102.71 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work Edges of slab and break in floors and walls under 20cm (twenty centimeter) wide complete upto all floor level including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 39.55 | Per Running meter | 145.61 | ₹5,758.88 |
| 9 | Centering and shuttering including strutting, propping etcetera and removal of form work Suspended floors, roofs, landings, balconies and access plat form complete upto all floor level including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 2.37 | Per Square meter | 602.25 | ₹1,427.33 |
| 10 | Centering and shuttering including strutting, propping etcetera and removal of form work Stairs, (excluding landings) except spiral staircases complete upto all floor level including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 138.9 | Per Square meter | 518.03 | ₹71,954.37 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tendernotice_2.pdf
PDF • 0.37 MB
SBD.pdf
Tender Documents • 5.35 MB
BOQ_214213.xls
BOQ • 0.38 MB
similarworkdonecondition.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .