| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.5 LAccepted-AOC 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹5.5 L Quoted ₹5.0 L | 1 | Accepted-AOC L1 |
| 2 | 2₹5.1 LRejected-AOC 2 222 B 10 PONMAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹5.1 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SS ENGINEERING CONTRACTOR L1 | PREETHI ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | De coupling of RWP, complete dismantling the entire pump, cleaning, examination and replacement of damaged components, changing of Shafts, Bearing housing, Bearings, Impeller, Impeller housing & neck rings , reassembling the pump and recommissioning satisfactorily after aligning the pump and motor.(Transporting vehicle and rubber chord will be arranged by Contractor Scope) of Capacity 3800 M3/Hr, VMF -36”. | 1 | No | 1,31,016 ₹1.3 L | 1,33,560 ₹1.3 L |
| 2.00 | Charges for cleaning and examination of existing gland sleeve, intermediate and pump shaft sleeves and Finostos ‘B’ bushes. Transporting of existing Shafts with sleeves to workshop for checking shaft trueness, Machining and matching of sleeves and Finostos ‘B’ bushes to the required dimensions and also return back to Raw water pump house. (Transporting vehicle will be arranged by Contractor scope.) Pump of Capacity 3800 M3/Hr, VMF -36”. | 7 | Nos | 3,400 ₹23,800 | 3,470 ₹24,290 |
| 3.00 | Charges for cutting and removal of existing worn-out Gland Sleeve, Intermediate shaft sleeves and pump shaft sleeve and refixing new machined sleeves on the shafts after preheating of sleeves if necessary. Pump of Capacity 3800 M3/ Hr , VMF -36”. | 7 | Nos | 2,125 ₹14,875 | 2,170 ₹15,190 |
| 4.00 | Charges for painting of pump internals, column pipes, intake trash rack and screens etc., with one coat of rust convertor, one coat of epoxy red oxide primer and one coat of epoxy high build coal tar one over the other with proper intervals. | 382.38 | M2 | 198 ₹75,711.24 | 202 ₹77,240.76 |
| 5.00 | Charges for Painting for two coats of enamel black/ green paint including cleaning the painting surface | 70 | M2 | 87 ₹6,090 | 90 ₹6,300 |
| 6.00 | Charges for renewal of worn out line shafts & dowel pin and edge preparation of shaft and bushes, drilling and cutting process in the outside work shop etc., | 4 | Nos | 13,250 ₹53,000 | 13,500 ₹54,000 |
| 7.00 | Charges for aligning the inter shaft- lock mechanism with shaft coupling & dowel pin and bushes after the machining process. | 4 | Nos | 6,800 ₹27,200 | 6,950 ₹27,800 |
| 8.00 | Charges for Overhauling of 900mm butterfly valve includes Complete overhauling of gearbox, Inspection and scale cleaning of valve seat and changing of rubber seal also attending the repairs and servicing of the butterfly valve parts and actuator parts. | 1 | No | 13,750 ₹13,750 | 14,000 ₹14,000 |
| 9.00 | Charges for leading, lifting and transportation of Iron and steel materials, from stores to site for raw water intake trash rack rectification works. | 1.09 | Ton | 4,500 ₹4,923 | 4,600 ₹5,032.40 |
| 10.00 | Charges for removal of corroded portion intake trash rack frame of raw water pump, fabrication & re erection of trash rack (As per cost data “Charges for Petty Iron Works on truss, straps etc”) | 1,094 | kg | 53 ₹57,982 | 55 ₹60,170 |
Tender Value
Refer Docs
EMD Value
₹5,200
Closing Date
30 Dec 2024, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I CA RWS Overhauling of Raw Water Pump No 04 and its butterfly valve Reconditioning of trash rack gates at Raw water pump house
2024_EB_511301_1
CE / MTPS-I / SE / M-I / CA /OT. 277/ 2024-25
Open Tender
Power/Energy Projects/Products
45 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹5,200
Yes
25 May 2026
16 Dec 2024
31 Dec 2024
16 Dec 2024
30 Dec 2024
16 Dec 2024
Amount
De coupling of RWP, complete dismantling the entire pump, cleaning, examination and replacement of damaged components, changing of Shafts, Bearing housing, Bearings, Impeller, Impeller housing & neck rings , reassembling the pump and recommissioning satisfactorily after aligning the pump and motor.(Transporting vehicle and rubber chord will be arranged by Contractor Scope) of Capacity 3800 M3/Hr, VMF -36”.
Charges for cleaning and examination of existing gland sleeve, intermediate and pump shaft sleeves and Finostos ‘B’ bushes. Transporting of existing Shafts with sleeves to workshop for checking shaft trueness, Machining and matching of sleeves and Finostos ‘B’ bushes to the required dimensions and also return back to Raw water pump house. (Transporting vehicle will be arranged by Contractor scope.) Pump of Capacity 3800 M3/Hr, VMF -36”.
Charges for cutting and removal of existing worn-out Gland Sleeve, Intermediate shaft sleeves and pump shaft sleeve and refixing new machined sleeves on the shafts after preheating of sleeves if necessary. Pump of Capacity 3800 M3/ Hr , VMF -36”.
Charges for painting of pump internals, column pipes, intake trash rack and screens etc., with one coat of rust convertor, one coat of epoxy red oxide primer and one coat of epoxy high build coal tar one over the other with proper intervals.
Charges for Painting for two coats of enamel black/ green paint including cleaning the painting surface
Charges for renewal of worn out line shafts & dowel pin and edge preparation of shaft and bushes, drilling and cutting process in the outside work shop etc.,
Charges for aligning the inter shaft- lock mechanism with shaft coupling & dowel pin and bushes after the machining process.
Charges for Overhauling of 900mm butterfly valve includes Complete overhauling of gearbox, Inspection and scale cleaning of valve seat and changing of rubber seal also attending the repairs and servicing of the butterfly valve parts and actuator parts.
Charges for leading, lifting and transportation of Iron and steel materials, from stores to site for raw water intake trash rack rectification works.
Charges for removal of corroded portion intake trash rack frame of raw water pump, fabrication & re erection of trash rack (As per cost data “Charges for Petty Iron Works on truss, straps etc”)
Charges for lifting the trash rack screen from intake channel of raw water pump for rectification works and lowering the trash rack after completion of work and re fixing into position.
Charges for fabrication and erection of spool piece for air vent ball valve in Raw water pump outside discharge pipe line.
Charges for Dismantling of air vent valve from the raw water pump discharge line and re assembling the valve after completion of repair/ rectification works.
Cost of Rust Convertor for Sl.No.4
Cost of Epoxy red oxide Primer for Sl.No.4
Cost of Coal Tar Black Paint for Sl.No.4
Cost of Epoxy Thinner for Sl.No.4
Cost of Black enamel for Sl.No.5
Cost of Bus green enamel for Sl.No.5
Cost of Rubber Cord 8mm for Sl.no.1
Cost of Rubber seal/’O’ rings for 900mm butter fly valve for SI.NO.8
Cost of cutting gas for Sl.No.10.
Cost of Welding electrode for Sl.No.10
Cost of consumables and T&P required for Sl.No.1 to 11
PREETHI ENTERPRISES (BID ID -1220034)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid