Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹6.9 L+₹226.51 (0.03%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KARUNAKARAN CONSTRUCTION L2 | J.K Srinivasan Contractor L1 |
|---|---|---|---|---|---|
| 1.00Construction of Drama Stage in Perungattur ADC at Perungattur Panchayat | |||||
| 1.01 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation | 11.64 | Cum | 246 ₹2,863.44 Lowest | 246 ₹2,863.44 Lowest |
| 1.02 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete. | 6.82 | Cum | 5,108.55 ₹34,840.31 | 5,108 ₹34,836.56 Lowest |
| 1.03 | Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting. | 28.79 | Sqm | 512.5 ₹14,754.88 | 512 ₹14,740.48 Lowest |
| 1.04 | Above GL | 106.01 | Sqm | 1,025 ₹1,08,660.25 Lowest | 1,025 ₹1,08,660.25 Lowest |
| 1.05 | Brick work in cement mortar 1:5 (one cement five sand) using country Bricks ground moulded of size 23x11x7 cm. for the following including curing etc., complete complying with standard specification. | 15.05 | Cum | 5,970.93 ₹89,862.5 | 5,970 ₹89,848.5 Lowest |
| 1.06 | R.C.C. 1:1 1/2:3 mix using 20mm ISS HBG metal including cost and conveyance etc., complete | 15.29 | Cum | 8,905.06 ₹1,36,158.37 | 8,905 ₹1,36,157.45 Lowest |
| 1.07 | Supplying, fabrication and placing in position mils steel or ribbed for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standared specification. | 0.76 | MT | 86,925.02 ₹66,063.02 | 86,925 ₹66,063 Lowest |
| 1.08 | Plastering with Cement Mortar 1:3 (one cement and three sand) 10 mm. thick in all floors including curing etc., complete complying with standard specification and as directed | 101.15 | Sqm | 284.28 ₹28,754.92 | 284 ₹28,726.6 Lowest |
| 1.09 | Plastering with Cement Mortar 1:5 (one cement and five sand) 12mm. thick in all floors including curing etc., complete complying with standard specification and as directed | 148.23 | Sqm | 268.12 ₹39,743.43 | 268 ₹39,725.64 Lowest |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
14 Aug 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development officer (B.Pt) , Vembakkam
Block Development office, Vembakkam
Excecution of MP LAD 2025 - 2026 Construction of Drama Stage in Perungattur ADC at Perungattur Panchayat in Vembakkam Block
2025_RDTN_587574_1
A6/3000/2025 Date. 21.07.2025
Open Tender
Civil Works - Others
Item Rate
Block Development office, Vembakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,000
Yes
14 Aug 2025
31 Jul 2025
14 Aug 2025
31 Jul 2025
14 Aug 2025
31 Jul 2025
Amount
Construction of Drama Stage in Perungattur ADC at Perungattur Panchayat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.
Above GL
Brick work in cement mortar 1:5 (one cement five sand) using country Bricks ground moulded of size 23x11x7 cm. for the following including curing etc., complete complying with standard specification.
R.C.C. 1:1 1/2:3 mix using 20mm ISS HBG metal including cost and conveyance etc., complete
Supplying, fabrication and placing in position mils steel or ribbed for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standared specification.
Plastering with Cement Mortar 1:3 (one cement and three sand) 10 mm. thick in all floors including curing etc., complete complying with standard specification and as directed
Plastering with Cement Mortar 1:5 (one cement and five sand) 12mm. thick in all floors including curing etc., complete complying with standard specification and as directed
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
Provision for new door Cost & conveyance all labour Charges etc..,
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KARUNAKARAN CONSTRUCTION (BID ID -1425475)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .