Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance 707 7TH FLOOR 707 7TH FLOOR EROS APPARTMENT NEHRU PLACE NEHRU PLACE SOUTH DELHI DELHI 110019 SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
16 Apr 2024, 5:00 pmClosed
Ex Engineer Dimbhe Dam Division Manchar
Ex Engineer Dimbhe Dam Division Manchar
Rehabilition improvement works of dimbhe dam Drip-II
2024_CWRDP_1038077_1
Rate quotation notice no.1 for 2023-24
Open Tender
Civil Works
Item Rate
45 days
Manchar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
24 Apr 2024
2 Apr 2024
18 Apr 2024
2 Apr 2024
16 Apr 2024
2 Apr 2024
Amount
Hydrophobic Material/Selatex Board/ Asbestos Sheet (a pre-molded, high-performance joint filler board)- (IS 1838(not sure))
Polyurathane Sealant (Non-foaming even in contact with water and will not absorb water)- (IS 8339)
EPDM / Hyplon Sheet / GLC TPO Sheet (ThermoPlastic Water proofing Joint Tape) -(For EPDM/ Hyplon sheet: IS 638, For GLC TPO Sheet: IS 12866)
2mm Thick x 300 mm wide Aluminium Sheet- (IS 737)
SS Fasteners- (IS 1367: Part 13)
Adhesive (Epoxy based Putty) -(IS 10262)
Under Adhesive -(UW Epoxy Based Putty)
High Strength Cementitious Material -(IS 12269)
Epoxy Bond Coat- (IS 9103)
Cleaning Agent- (IS 2062)
Polymer based Top Coat
High Strength Cementitious Material Confirming to EN 1504-3 R4 Category Material
Antiwashout (Polymer based admixture)-( IS 9104 Part IV)
Fast Setting Admixture –( IS 9104 Part III)
PU Grout (Foam able high strength PU Grout)
Micro Fine Cement (Particle size distribution = d20 - d90)-( IS 15477)
Accelerators (Early strength gain admixture)- (IS 9104)
Plasticizer (To reduce water content)- (IS 9103)
Diamond Core Bit 76 mm-(IS 2906)- (IS 2906)
Diamond Reaming Shell-(IS 12551)
Core Barrel-(IS 10324)
Drill tube and accessories
Casing Pipe
Water line
Bentonite Clay
Pneumatic Chipping Machine (CP)
Pneumatic Grinding Machine (CP)
Pneumatic Drilling Machine (CP)
Underwater Diving Equipment (KMB, Scuba Set, Communication set, Live videography set, Underwater camera, Compressor (LP & HP), pneumatic pipe, KMB Hood, Fins, Neoprene Suit, Diving booty, Diving knife, Regulators(1st & 2nd Stage) Etc.
Air Blower
Chipping Machine
Grout Gun with accessories
Rotary Drills
Lathe Machine
Welding Transformer
Underwater Divers
Underwater diving supervisor
Drilling Rig Operator
Grouting Pump Operator
Carrying out detailed physical investigation of Dimbhe dam (Masonry dam) with Electrical Resistivity Imaging Method to find the seepage path, cavities and water saturation areas in the masonry of dam body including cost of all materials. Machinery, equipment’s, labour, insurance charges, transportation with all leads and lifts and any other incidental charges etc. making of reports in soft copies and hard copies. The results should provide pictures of internal resistivity distribution of the dam structure, identifying areas of water saturation in the dam body, and thus identifying the zones of water accumulation and wetting etc. complete
Carrying out detailed physical investigation of Dimbhe dam (Masonry dam) with Streaming potential method to infer seepage patterns and concentrated seepage flows and to identify the zones in the dam body through which seepage is taking place. The results are correlated with resistivity sections. including cost of all materials. Machinery, equipment’s, labour, insurance charges, transportation with all leads and lifts and any other incidental charges etc. making of reports in soft copies and hard copies etc. complete.
Carrying out detailed physical investigation of NOF section Dimbhe dam (Masonry dam) with Multichannel Analysis of Surface Waves (MASW) method is one of the seismic survey methods evaluating the elastic condition (stiffness) of the ground., this method measure seismic surface waves generated from various types of seismic chasssledge hammer analyses the propagation velocities of those surface waves, and then finally reduces shear-wave velocity (Vs) variations below the surveyed area that is most responsible for the analysed propagation velocity pattern of surface waves including cost of all materials. Machinery, equipment’s, labour, insurance charges, transportation with all leads and lifts and any other incidental charges etc. making of reports in soft copies and hard copies etc. complete.
Carrying out detailed physical investigation of Over Flow section Dimbhe dam (Masonry dam) with Cross face Tomography method. Seismic Tomography is conducted in two configurations. In first configuration, tomography (L-section tomography) is conducted between dam top/spillway crest and galleries. In second configuration, tomography (cross face tomography) is conducted between two faces of the Dam. Tomography provides high resolution details of internal structure. including cost of all materials. Machinery, equipment’s, labour, insurance charges, transportation with all leads and lifts and any other incidental charges etc. making of reports in soft copies and hard copies etc. complete
Carrying out detailed physical investigation of Non Over Flow section Dimbhe dam (Masonry dam) with Cross face Tomography method. Seismic Tomography is conducted in two configurations. In first configuration, tomography (L-section tomography) is conducted between dam top/spillway crest, Inspection/Foundation galleries. In second configuration, tomography (cross face tomography) is conducted between two faces of the Dam. Tomography provides high resolution details of internal structure. Including cost of all materials. Machinery, equipment’s, labour, insurance charges, transportation with all leads and lifts and any other incidental charges etc. making of reports in soft copies and hard copies etc. complete
RDECON STRUCTURAL SOLUTIONS PRIVATE LIMITED
Dynasoure Concrete Treatment Pvt Ltd
Jumbo Hydro Engineers
SHIVA STRUCTURES PVT LTD
MAULI CONSTRUCTIONS
Arun Ganpat Idhate
Saahas Engineers and Contractors Pvt Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .