Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.4 LAdmitted-Finance R O KHREW TEH PAMPORE DISTT PULWAMA PIN 191103 J K | PULWAMA | JAMMU AND KASHMIR | 191103 | ₹30.4 L | L1 | Admitted-Finance |
| 2 | L2₹32.2 L+₹1.7 L (5.67%)Admitted-Finance C O S 1 ESS GEE COMPLEX NEAR J K BANK SONAWAR BAZAR B B CANTT SRINAGAR 190004 J K | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190004 | ₹32.2 L+₹1.7 L (5.67%) | L2 | Admitted-Finance |
| 3 | L3₹33.7 L+₹3.3 L (10.8%)Admitted-Finance | ₹33.7 L+₹3.3 L (10.8%) | L3 | Admitted-Finance |
| 4 | L4₹35.5 L+₹5.1 L (16.7%)Admitted-Finance | ₹35.5 L+₹5.1 L (16.7%) | L4 | Admitted-Finance |
| 5 | L5₹43.9 L+₹13.5 L (44.3%)Admitted-Finance | ₹43.9 L+₹13.5 L (44.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SHEIKH FEROOZ AHMAD L1 | M/S TANTRAY AND CO L6 | M/S Ghulam Hassan Lone L5 | BHAT CONSTRUCTION AND BUILDERS L4 | M/S A.N CONSTRUCTIONs L2 | M/S NEW IQBAL ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) with and including removing rubbish material from building and thrown in low lying empty area complete all as specified and as directed by Engineer-in-charge. | 510 | Sqm | 9 ₹4,590 | 90 ₹45,900 | 10 ₹5,100 | 19 ₹9,690 | 10 ₹5,100 | 4 ₹2,040 Lowest |
| 2.00 | Demolition cement concrete (unreinforced) in ground floor and pavings not exceeding 15cm thickness below or above ground level with and including removing rubbish material from building and thrown in low lying empty area complete all as specified and as directed by Engineer-in-charge. | 10 | Cum | 20 ₹200 Lowest | 70 ₹700 | 300 ₹3,000 | 111 ₹1,110 | 100 ₹1,000 | 35 ₹350 |
| 3.00 | Material and Labour for 25 mm thick PCC 1:2:4, type B-0, using 12.5mm graded stone aggregate finished fair and even etc complete all as specified | 400 | Sqm | 10 ₹4,000 Lowest | 100 ₹40,000 | 170 ₹68,000 | 99 ₹39,600 | 45 ₹18,000 | 90 ₹36,000 |
| 4.00 | Material & Labour for Non Skid Ceramic coloured joint free tiles , thickness 7mm to 8mm thick (square/ rectangular), colour as approved by Engineer-in-charge area of each tiles exceeding 0.18 Sqm but not exceeding 0.38 Sqm in floor etc set and jointed in neat cement slurry @ 3.00Kg per Sqm and pointed in white or coloured cement to match the colour / shade of tiles , laid over with and including 15mm thick screed bed in cement mortar 1:4 complete all as specified and directed by Engineer-in-Charge. | 120 | Sqm | 1,300 ₹1,56,000 | 1,100 ₹1,32,000 | 850 ₹1,02,000 Lowest | 1,200 ₹1,44,000 | 950 ₹1,14,000 | 900 ₹1,08,000 |
| 5.00 | Material and Labour for Vitrified Ceramic tiles dark shade 10 mm thick (square/ rectangular) polished, (shade as approved by Engineer-in-charge ) area of each tiles not exceeding 0.36 Sqm in floor etc set and jointed in neat cement slurry @ 3.00Kg per Sqm and pointed in white or coloured cement to match the colour / shade of tiles , laid over with and including 15mm thick screed bed in cement mortar 1:4 complete all as specified and directed by Engineer-in-Charge. | 180 | Sqm | 1,300 ₹2,34,000 | 2,000 ₹3,60,000 | 900 ₹1,62,000 Lowest | 1,455 ₹2,61,900 | 950 ₹1,71,000 | 1,000 ₹1,80,000 |
| 6.00 | Material & Labour for Vitrified Ceramic tiles dark shade 10mm thick (square/rectangular) polished, (shade as approved by Engineer-in-charge ) , area of each tiles exceeding 0.36 sqm but not exceeding 0.42 sqm, in floors etc. set and jointed in neat cement slurry @ 3.00Kg per Sqm and pointed in white or coloured/ shade cement to match the colour / shade of tiles , laid over with and including 15mm thick screed bed in cement mortar 1:4 complete all as specified and directed by Engineer-in-Charge. | 50 | Sqm | 1,400 ₹70,000 | 1,150 ₹57,500 | 1,000 ₹50,000 | 1,555 ₹77,750 | 950 ₹47,500 Lowest | 1,100 ₹55,000 |
| 7.00 | Material & Labour for Glazed Coloured Ceramic tiles , size 300mm x 200mm / 450mm x 350mm x 7mm to 8mm thick, colour as approved by Engineer-in-charge as in vertical surfaces set and jointed in neat cement slurry @ 3.00Kg per Sqm and pointed in white or coloured cement to match the colour / shade of tiles , laid over with and including 10mm thick rendering in cement mortar 1:4 complete all as specified and directed by Engineer-in-Charge. | 100 | Sqm | 900 ₹90,000 Lowest | 1,050 ₹1,05,000 | 900 ₹90,000 Lowest | 1,117 ₹1,11,700 | 950 ₹95,000 | 900 ₹90,000 Lowest |
| 8.00 | Material & Labour for Machine cut kota slab 20mm - 25 mm thick ( Kota stone as approved by Engineer-in-charge) as in flooring , laid and jointed with grey cement slurry @ 3.00 Kg per Sqm mixed with pigment to match the shade of the slab including rubbing and polishing , laid over with and including 15 mm thick screed bed in Cement Mortar 1:4 complete all as specified and directed by Engineer-in-Charge. | 50 | Sqm | 1,600 ₹80,000 | 1,800 ₹90,000 | 1,400 ₹70,000 | 1,415 ₹70,750 | 1,150 ₹57,500 | 1,100 ₹55,000 Lowest |
| 9.00 | Material & Labour for Machine cut kota slab 20mm - 25 mm thick in one piece ( Kota stone as approved by Engineer-in-charge) as in vertical surfaces such as skirting, dado , pillar, risers of steps , etc. laid and jointed with grey cement slurry @ 3.00 Kg per Sqm mixed with pigment to match the shade of the slab including rubbing and polishing , laid over with and including 10 mm thick rendering in Cement Mortar 1:4 complete all as specified and directed by Engineer-in-Charge. | 10 | Sqm | 600 ₹6,000 Lowest | 1,350 ₹13,500 | 1,450 ₹14,500 | 1,500 ₹15,000 | 1,150 ₹11,500 | 900 ₹9,000 |
| 10.00 | Demolition of stone slab and tiles of any description or thickness in floors, aprons etc laid bedded and pointed in any mortar complete all as specified and directed by Engineer-in-Charge. | 0.5 | 10 Sqm | 10 ₹5 Lowest | 10,000 ₹5,000 | 300 ₹150 | 311 ₹155.5 | 100 ₹50 | 50 ₹25 |
Tender Value
₹49.5 L
EMD Value
₹99,000
Closing Date
26 Aug 2026, 6:00 pmClosed
GE 861 EWS
GE 861 EWS
REPAIR/ MAINT OF B/R E/M ITEMS AND PERIODICAL SERVICES OF TEMP BLDGS AT UPPER CAMP AT KHREUH SHER-E-SHALI UNDER GE 861 EWS
2026_MES_776581_2
GE 861 EWS-23(T)/2026-27
Open Tender
Civil Works
Item Rate
180 days
GE 861 EWS
As per NIT
8 documents required · 8 mandatory
₹500
GE 861 EWS
₹99,000
GE 861 EWS
16 Sept 2026
28 Jul 2026
29 Aug 2026
28 Jul 2026
26 Aug 2026
12 Aug 2026
6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) with and including removing rubbish material from building and thrown in low lying empty area complete all as specified and as directed by Engineer-in-charge. | 510 | Sqm | - | - |
| 2 | Demolition cement concrete (unreinforced) in ground floor and pavings not exceeding 15cm thickness below or above ground level with and including removing rubbish material from building and thrown in low lying empty area complete all as specified and as directed by Engineer-in-charge. | 10 | Cum | - | - |
| 3 | Material and Labour for 25 mm thick PCC 1:2:4, type B-0, using 12.5mm graded stone aggregate finished fair and even etc complete all as specified | 400 | Sqm | - | - |
| 4 | Material & Labour for Non Skid Ceramic coloured joint free tiles , thickness 7mm to 8mm thick (square/ rectangular), colour as approved by Engineer-in-charge area of each tiles exceeding 0.18 Sqm but not exceeding 0.38 Sqm in floor etc set and jointed in neat cement slurry @ 3.00Kg per Sqm and pointed in white or coloured cement to match the colour / shade of tiles , laid over with and including 15mm thick screed bed in cement mortar 1:4 complete all as specified and directed by Engineer-in-Charge. | 120 | Sqm | - | - |
| 5 | Material and Labour for Vitrified Ceramic tiles dark shade 10 mm thick (square/ rectangular) polished, (shade as approved by Engineer-in-charge ) area of each tiles not exceeding 0.36 Sqm in floor etc set and jointed in neat cement slurry @ 3.00Kg per Sqm and pointed in white or coloured cement to match the colour / shade of tiles , laid over with and including 15mm thick screed bed in cement mortar 1:4 complete all as specified and directed by Engineer-in-Charge. | 180 | Sqm | - | - |
| 6 | Material & Labour for Vitrified Ceramic tiles dark shade 10mm thick (square/rectangular) polished, (shade as approved by Engineer-in-charge ) , area of each tiles exceeding 0.36 sqm but not exceeding 0.42 sqm, in floors etc. set and jointed in neat cement slurry @ 3.00Kg per Sqm and pointed in white or coloured/ shade cement to match the colour / shade of tiles , laid over with and including 15mm thick screed bed in cement mortar 1:4 complete all as specified and directed by Engineer-in-Charge. | 50 | Sqm | - | - |
| 7 | Material & Labour for Glazed Coloured Ceramic tiles , size 300mm x 200mm / 450mm x 350mm x 7mm to 8mm thick, colour as approved by Engineer-in-charge as in vertical surfaces set and jointed in neat cement slurry @ 3.00Kg per Sqm and pointed in white or coloured cement to match the colour / shade of tiles , laid over with and including 10mm thick rendering in cement mortar 1:4 complete all as specified and directed by Engineer-in-Charge. | 100 | Sqm | - | - |
| 8 | Material & Labour for Machine cut kota slab 20mm - 25 mm thick ( Kota stone as approved by Engineer-in-charge) as in flooring , laid and jointed with grey cement slurry @ 3.00 Kg per Sqm mixed with pigment to match the shade of the slab including rubbing and polishing , laid over with and including 15 mm thick screed bed in Cement Mortar 1:4 complete all as specified and directed by Engineer-in-Charge. | 50 | Sqm | - | - |
| 9 | Material & Labour for Machine cut kota slab 20mm - 25 mm thick in one piece ( Kota stone as approved by Engineer-in-charge) as in vertical surfaces such as skirting, dado , pillar, risers of steps , etc. laid and jointed with grey cement slurry @ 3.00 Kg per Sqm mixed with pigment to match the shade of the slab including rubbing and polishing , laid over with and including 10 mm thick rendering in Cement Mortar 1:4 complete all as specified and directed by Engineer-in-Charge. | 10 | Sqm | - | - |
| 10 | Demolition of stone slab and tiles of any description or thickness in floors, aprons etc laid bedded and pointed in any mortar complete all as specified and directed by Engineer-in-Charge. | 0.5 | 10 Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tender23T.pdf
Tender Documents • 1.43 MB
BOQ_875095.xls
BOQ • 17.00 MB
Credit23T2nd.pdf
Additional Documents • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .