Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.5 LAdmitted-Finance | -31.51% | ₹12.5 L | L1 | Admitted-Finance |
| 2 | L2₹13.4 LAdmitted-Finance | -26.99% | ₹13.4 L | L2 | Admitted-Finance |
| 3 | L3₹14.1 LAdmitted-Finance DELHI ALWAR ROAD SADDIQ NAGAR DISTRICT NUH 122107 | NUH | HARYANA | 122107 | -23.00% | ₹14.1 L | L3 | Admitted-Finance |
| 4 | L4₹14.2 LAdmitted-Finance | -22.51% | ₹14.2 L | L4 | Admitted-Finance |
| 5 | L5₹14.6 LAdmitted-Finance | -20.05% | ₹14.6 L | L5 | Admitted-Finance |
Tender Value
₹18.3 L
EMD Value
₹36,618
Closing Date
24 Apr 2026, 6:00 pmClosed
Executive Officer
Office Nagarpalika Ramgarh
Construction and Repair of Drain and Cleaning From Near Gyatari Telecome to Pump House Near 2 MLD STP Ramgarh
2026_DLB_551534_1
npara/26-27/16
Open Tender
Civil Works
120 days
Ramgarh Shekhawati
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Officer, MD RISL
₹36,618
Yes
4 May 2026
15 Apr 2026
27 Apr 2026
15 Apr 2026
24 Apr 2026
15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Cement Concrete Grade M-15 and above and PCC blocks | 5.25 | cum | 678 | ₹3,559.5 |
| 1.2 | Prestressed /Reinforced cement concrete with separating, cleaning, straightening and cutting of bars | 3 | cum | 1,692 | ₹5,076 |
| 1.3 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Stone, boulders, gravelly material up to 2 km | 25 | cum | 174.63 | ₹4,365.75 |
| 1.4 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. In all type of soil | - | P.CUM | - | - |
| 1.5 | Cleaning and removal of earth, silt, sludge, kankar, boulder, building material and garbage in existing nallah/drains including construction of bypass arrangement to bypass water with 1.5m lift from ground level and lead upto 50 m including foul & saturated condition where pumping out or bailing out of water is required, including shoring, shuttering where required and dewatering. Making access for disposal and dressing disposal side as per the directed of the Engineer.For Depth upto 1.50 m | - | cum | - | - |
| 1.6 | For depth above 1.50 m and upto 3.00 m | - | cum | - | - |
| 1.7 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:4 (1 cement : 4 fine/ coarse sand) | - | sqm | - | - |
| 1.8 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | - | cum | - | - |
| 1.9 | Brick work with modular bricks of class designation 75 in foundation and plinth in: Cement Mortar 1:6 (1 cement : 6 coarse sand). | - | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.39 MB
BOQ_982981.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid