Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.9 LAccepted-AOC | L1 | Accepted-AOC lowest Admitted | |
| 2 | L2₹72.5 L+₹6.5 L (9.82%)Rejected-Finance | L2 | Rejected-Finance L2 (REJECTED) |
Tender Value
₹87.5 L
EMD Value
₹1.7 L
Closing Date
5 Jul 2022, 4:00 pmClosed
EXECUTIVE ENGINEER
GOVERNMENT OF GOA SOIL CONSERVATION DIVISION DIRECTOR OF AGRICULTURE KRISHI BHAVAN TONCA CARANZALEM GOA.
RECONSTRUCTION OF COLLAPSED PORTION OF COMPOUND WALL AT GOVT AGRICULTURE FARM KALAY SANGUEM GOA
2022_DAG_4475_1
SCD/D.Agri./22-23/e16/L1/357
Open Tender
Civil Works
Item Rate
270 days
KALAY SANGUEM GOA
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,000
₹1.7 L
Yes
16 Mar 2023
23 Jun 2022
7 Jul 2022
23 Jun 2022
5 Jul 2022
23 Jun 2022
Amount
Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge.
Supplying and filling in plinth under floors, trenches including watering ramming consolidating, dressing, complete.b)moorum
Earthwork in excavation by mechanical/manual means in all types of strata comprising any of the materials such as soil, silt,sand, clay , gravel, moorum of all varieties, shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated or weathered rock, fissured/shattered, decomposed rock and all such other materials either in full or in parts as the case may be adopting any approved method or as may be convinient or permitted, inclusive of chiselling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditionsetc. including pumping or bailing out water/dewatering including setting out consstruction of, shoring and strutting and bracing,removal of stump and other deleterious matter,dressing of sides and bottom, providing barricading, danger lighting, guarding etc. backfilling the excavated earth to the extent required and disposing of surplus excavated soil/rock at specified areas with all leads and lifts etc. as per specification and drawing and as directed by Engineer-in-charge etc. all complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation basement and laterite masonry in all sizes in superstructure from floor I level upto floor V level.. in specified areas with all leads and lifts etc. and as directed by Engineer-in-charge etc. all complete.
Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing :a)All works upto plinth level
Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering, shuttering and finishing in:a)All works upto plinth level
Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) a)All works upto plinth level
Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size)b)In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level
Centering & shuttering including Strutting, Propping & removal of forms for :(i)Foundations, Footings, Bases for columns
Centering & shuttering including Strutting, Propping & removal of forms for :(ii)Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like
Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.
12mm cement plaster 1:3 (1 cement : 3 coarse sand)
Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving:c)Above 3.50meters upto 5.00 meters long pile
Driving down wooden piles of 200mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile complete at site (portion in ground only to be measured)
Providing weep holes of clear size 15 cms high and 8 cms wide in concrete walls as per drawing and direction of engineer in charge with 30 cms thick jungle wood planks to form a box of clear dimensions of the weep hole and keeping the same in position with a slope of about 1 verticle to 20 horizontal towards drainage face while laying the concrete complete.
M/S DOUBLE CENTURY CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .