Loading…
Loading…
Updated dates
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
17 Jun 2026, 5:30 pm
Cheif Construciton Engineer
O/o the CCE RW Circle, Sunabeda
Road
2026_CERWI_148016_30
NCB-03/RWCSBD/2026-2027
Open Tender
Civil Works - Roads
270 days
Sunabeda
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹2.1 L
O/o the CCE RW Circle, Sunabeda
28 May 2026
28 May 2026
18 Jun 2026
28 May 2026
17 Jun 2026
28 May 2026
28 May 2026 - 16 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.etc. complete and as per direction of the Engineer-in-charge. | 8,400 | Sqm | 2.29 | ₹19,236 | 1 |
| 2 | Providing Construction of granular sub-base Gr-III by providing well graded material, spereading in uniform layers with tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MORD Technical Specification clause 401 and as per direction of Engineer in Charge. | 845.82 | Cum | 1,556.88 | ₹13,16,847.71 | 2 |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). | 630.55 | Cum | 50.46 | ₹31,817.55 | 3 |
| 4 | Excavation in ordinary rock using Hydraulic Excavator of 0.9 cum bucket capacity including cutting and loading in tippers,transporting to embankment site with a lift upto 1000m,trimming bottom and side slopes in accordance with requirements of lines,grades and cross-section as per Techinal Specification clause 302.3.5. | 1,350 | Cum | 86.12 | ₹1,16,262 | 4 |
| 5 | Excavation in Hard Rock (blasting prohibited by mechanical means) as per technical specificaation clause 302 | 3,150 | Cum | 470.73 | ₹14,82,799.5 | 5 |
| 6 | Construction of embankment with approved material obtained from borrow pits with all lead and lift, transporting to site, spreading, grading to required slope and compacting to meet requirement as per MoRD Rural roads Specification Clause 301as per the direction of Engineer in charge by manual means. | 2,694.2 | Cum | 254.48 | ₹6,85,620.02 | 6 |
| 7 | Fine dressing and turfing including transportation by mechanical means with all leads and lifts and placing of turfs in position and ramming with thapies including watering and cost of labour and all materials etc. complete as per the direction of the Engineer-in-Charge. | 4,680 | Sqm | 22.59 | ₹1,05,721.2 | 7 |
| 8 | Providing Construction of granular sub-base Gr-III by providing well graded material, spereading in uniform layers with tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MORD Technical Specification clause 401 and as per direction of Engineer in Charge. | 95.01 | Cum | 1,556.88 | ₹1,47,923.84 | 8 |
| 9 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoSRT&H Specifications for Road & Bridge works (4th Rivision) | 737.27 | Cum | 2,402.63 | ₹17,71,398.53 | 9 |
| 10 | Providing and applying primer coat with bitumen Emulsion [SS-1] on prepared surface of Granular base including cleaning of road surface & spraying primer @ 0.70kg/ 1.0 kg/sqm using mechanical means as per clause 502 of MORD Specification for Rural roads including cost,conveyance,royalty, taxes, labour and T&P required for the work and as per direction of Engineer-in charge. | 4,475.25 | Sqm | 88.44 | ₹3,95,791.11 | 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.98 MB
Tendernotice_2.pdf
PDF • 3.13 MB
Tendernotice_3.pdf
PDF • 0.79 MB
BOQ_231010.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid