Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.0 LAdmitted-Finance | ₹31.0 L | L1 | Admitted-Finance |
| 2 | L2₹31.1 LAdmitted-Finance | ₹31.1 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S A V CONSTRUCTIONS L1 | PERFECT ENGINEERING SERVICES L2 |
|---|---|---|---|---|---|
| 1.001.)Renewal to the road from K.Morur to Kumarankottai road KM 0/0-2/15. H/O : Kanavaipudur. | |||||
| 2.00 | Clearing Scrub jungle including cutting all trees and other vegetation and depositing them beyond the road as directed by the departmental officers Including all labour charges etc., complete. KM 0/0-2/150 | 1,159.43 | Sqm | 6 ₹6,956.58 | 7 ₹8,116.01 |
| 3.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction KM 0/0-2/150 | 193.24 | cum | 340 ₹65,701.60 | 350 ₹67,634 |
| 4.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal etc | |||||
| 5.00 | KM 0/0-1/0 | 1.28 | cum | 4,850 ₹6,208 | 5,000 ₹6,400 |
| 6.00 | KM 1/0-2/0 | 3.52 | cum | 4,860 ₹17,107.20 | 5,000 ₹17,600 |
| 7.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal etc | |||||
| 8.00 | KM 0/0-1/0 | 1.58 | cum | 4,170 ₹6,588.60 | 4,200 ₹6,636 |
| 9.00 | KM 1/0-2/0 | 7.54 | cum | 4,180 ₹31,517.20 | 4,200 ₹31,668 |
| 10.00 | Applying Tack Coat unprimed WBM surface using 3kg of emulsion bitumen per 10 Sqm including cost of emulsion bitumen which will be supplied by the Department section stores and cost will be recovered at the rate as per the special condition appended Sqm herewith including conveyance to site, handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour for applying the required quantity of bitumen including hire and fuel charges for all Tools and Plants employed for the wol including all other incidental charges such as barricading and providing sqmdanger lights, flags etc., complete as per standard specifications. KM 0/0-2/150 | 6,460 | Sqm | 34.3 ₹2.2 L | 35 ₹2.3 L |
Tender Value
₹31.6 L
EMD Value
₹32,000
Closing Date
23 Feb 2026, 3:00 pmClosed
BDO (BP)
BDO Office,Kadayampatti
Salem District - Kadayampatti Block - K.Morur to Kumaran kottai (KM 0/0-2/15) H/o Kanavaipudur Panchayat in RRMS - 2025-26 (Pot Holes )
2026_RDTN_659221_1
Roc.No.3338/2025/A3
Open Tender
Civil Works - Roads
120 days
BDO Office, Kadayampatti
As per tender document
3 documents required · 3 mandatory
₹0
₹32,000
Yes
24 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
1.)Renewal to the road from K.Morur to Kumarankottai road KM 0/0-2/15. H/O : Kanavaipudur.
Clearing Scrub jungle including cutting all trees and other vegetation and depositing them beyond the road as directed by the departmental officers Including all labour charges etc., complete. KM 0/0-2/150
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction KM 0/0-2/150
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal etc
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal etc
Applying Tack Coat unprimed WBM surface using 3kg of emulsion bitumen per 10 Sqm including cost of emulsion bitumen which will be supplied by the Department section stores and cost will be recovered at the rate as per the special condition appended Sqm herewith including conveyance to site, handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour for applying the required quantity of bitumen including hire and fuel charges for all Tools and Plants employed for the wol including all other incidental charges such as barricading and providing sqmdanger lights, flags etc., complete as per standard specifications. KM 0/0-2/150
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5( KM 0/0-2/150)
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface. Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803 KM 0/0-2/150
Provison for sign board
Provison for HM stone
Provison for KM stone
Providing schem name boad including painting and lettering charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
01.pdf
Tender Documents • 1.29 MB
BOQ_790896.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid