Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹94.2 LAdmitted-Finance | -5.77% | ₹94.2 L | L1 | Admitted-Finance |
| 2 | L2₹94.5 L+₹27,000 (0.29%)Admitted-Finance | -5.50% | ₹94.5 L+₹27,000 (0.29%) | L2 | Admitted-Finance |
| 3 | L3₹100.0 L+₹5.8 L (6.11%)Admitted-Finance 106 DAROOGA MOHALLA LAL KOTHI AHOO DARWAJA DIG | -0.01% | ₹100.0 L+₹5.8 L (6.11%) | L3 | Admitted-Finance |
| 4 | L4₹1.1 Cr+₹15.8 L (16.7%)Admitted-Finance 55 NIJATPURA JUNA PRESS GALI NO 4 UJJAIN UJJAIN MADHYA PRADESH 456001 | UJJAIN | MADHYA PRADESH | 456001 | +10.00% | ₹1.1 Cr+₹15.8 L (16.7%) | L4 | Admitted-Finance |
Tender Value
₹1 Cr
EMD Value
₹2 L
Closing Date
5 Feb 2026, 5:00 pmClosed
SUPERINTENDING ENGIEER PHED CIRCLE PRATAPGARH
SUPERINTENDING ENGIEER PHED CIRCLE PRATAPGARH
Rate contract for Construction of New RCC openwell in Block Pratapgarh and Dhamotar under Jurisdiction of Division Pratapgarh, District Pratapgarh
2026_PHCJA_531637_1
NIT 13/2025-26 SE PGH
Open Tender
Civil Works
Percentage
330 days
PRATAPGARH
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
EXECUTIVE ENGINEER PHED DIVISION
₹2 L
Yes
16 Feb 2026
27 Jan 2026
6 Feb 2026
27 Jan 2026
5 Feb 2026
27 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation over areas (exceeding 30cm depth, 1.5 mtr in width and 10 SQM in plan) for construction of open well, lift up to 1.5 Mtr. including taking out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 meter. | - | - | - | - |
| 2 | All kind of Soil | 1 | CUM | 314 | ₹314 |
| 3 | Ordinary Rock | 1 | CUM | 674 | ₹674 |
| 4 | Hard Rock (Requiring blasting) | 1 | CUM | 976 | ₹976 |
| 5 | Hard Rock (Blasting Prohibited) | 1 | CUM | 1,355 | ₹1,355 |
| 6 | Add extra over item No. 2.39.1 for every additional lift of 1.5 Mtr. or part thereof : In all kind of soils. | 1 | CUM | 47 | ₹47 |
| 7 | Add extra over item No. 2.39.2-4 for every additional lift of 1.5 Mtr. or part thereof : In Ordinary rock and hard rock. | 1 | CUM | 67 | ₹67 |
| 8 | Add 20% extra over item No. 2.39 for excavation in saturated soil where pumping or baling out of water is required, including shoring strutting where required and dewatering. | - | - | - | - |
| 9 | Labour charges for horizontal boring 100 mm dia in open well in rocky strata with all types of rock cutting & drilling tools etc. including all T&P required for job including dewatering arrangement. | 1 | Mtr | 626 | ₹626 |
| 10 | Structural steel work riveted, bolted or welded in built up
sections, trusses and framed work, including cutting, hoisting
(height upto 10 m) , fixing in position and applying a priming
coat of approved steel primer all complete: | 1 | KG | 81 | ₹81 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 7.16 MB
BOQ_947575.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .