Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC | ₹7.6 L | L1 | Accepted-AOC Accept |
| 2 | L2₹8.0 L+₹33,543.50 (4.39%)Rejected-AOC 93 SOUTH ZONE COIMBATORE CORPORATION | TIRUPPUR | TAMIL NADU | 638459 | ₹8.0 L+₹33,543.50 (4.39%) | L2 | Rejected-AOC Reject |
| 3 | L3₹8.0 L+₹35,446.50 (4.64%)Rejected-AOC RAMNAGAR TUKO RAMNAGAR TARAPUR CACHAR ASSAM 788003 | CACHAR | ASSAM | 788003 | ₹8.0 L+₹35,446.50 (4.64%) | L3 | Rejected-AOC Reject |
| 4 | L4₹8.1 L+₹43,221.50 (5.65%)Rejected-AOC | ₹8.1 L+₹43,221.50 (5.65%) | L4 | Rejected-AOC Reject |
| 5 | L5₹8.2 L+₹50,404.87 (6.59%)Rejected-AOC | ₹8.2 L+₹50,404.87 (6.59%) | L5 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | K.C & CO L3 | THOUSAND BRICKS L4 | Skandha Constructions L5 | SATHISH KUMAR L1 | R KANNAN L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete a Narrow Foundations - First Depth Upto 2m | 10 | m3 | 220 ₹2,200 | 212 ₹2,120 | 211.2 ₹2,112 | 198 ₹1,980 | 150 ₹1,500 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 1 | m3 | 5,960 ₹5,960 | 5,850 ₹5,850 | 5,723.92 ₹5,723.92 | 5,365 ₹5,365 Lowest | 5,650 ₹5,650 |
| 3.00 | Centering for Bed block, Lintel, Beam, Slab and Staircase slab plain surface including struttingslabs plain surface including strutting etc., complete cost and conveyanceof all materials to site and all labourcharges etc., complete. | 4 | m2 | 1,180 ₹4,720 | 1,125 ₹4,500 | 1,133.76 ₹4,535.04 | 1,063 ₹4,252 Lowest | 1,100 ₹4,400 |
| 4.00 | Supply and fixing of 600mmX600mm Square RCC manhole cover with frame SFRC pipe IS 12592 | 1 | nos | 2,665 ₹2,665 | 2,585 ₹2,585 | 2,592.96 ₹2,592.96 | 2,430 ₹2,430 Lowest | 2,600 ₹2,600 |
| 5.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one & half M.sand and three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 2 | m3 | 9,740 ₹19,480 | 9,550 ₹19,100 | 9,354.76 ₹18,709.52 | 8,769 ₹17,538 Lowest | 9,500 ₹19,000 |
| 6.00 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour charges for cutting, bending & tying etc., complying with standard specifications - 1 Quintal | 2 | qtl | 9,540 ₹19,080 | 9,225 ₹18,450 | 9,160.46 ₹18,320.92 | 8,587 ₹17,174 Lowest | 9,200 ₹18,400 |
| 7.00 | Fly ash Brick work in CM 1:5 (one cement & five sand) using size 9"X4 3/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT | 9 | m3 | 6,980 ₹62,820 | 6,775 ₹60,975 | 6,705.07 ₹60,345.63 | 6,285 ₹56,565 Lowest | 6,750 ₹60,750 |
| 8.00 | Plastering with cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 10mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 20 | m2 | 355 ₹7,100 | 338 ₹6,760 | 340.91 ₹6,818.2 | 320 ₹6,400 Lowest | 335 ₹6,700 |
| 9.00 | Plastering with C.M. 1:5 Mix (one cement and five sand) 12mm thick finishing including cost and conveyance of all materials to site and all labour charges, watering curing and all other incidental charges etc., complete complying with standard specification. | 62 | m2 | 309 ₹19,158 | 297 ₹18,414 | 297.19 ₹18,425.78 | 278 ₹17,236 Lowest | 300 ₹18,600 |
| 10.00 | Supply and fixing of mild steel for Trusses and record rocks using all round angle with necessary arrangements including cost of steel and labour charges for welding etc., complete | 1,100 | kgs | 112 ₹1,23,200 | 109 ₹1,19,900 | 108.68 ₹1,19,548 | 102 ₹1,12,200 Lowest | 108 ₹1,18,800 |
Tender Value
₹10.2 L
EMD Value
₹10,200
Closing Date
9 Jun 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Additional Improvement works to Kurichi Amma Unavagam in ward no 98 South zone.
2026_MAWS_678404_4
e35/2026 (Amma unavagam)
Open Tender
Civil Works
Works
60 days
Coimbatore corporation
As Per Tender Document
4 documents required · 4 mandatory
₹0
₹10,200
25 Aug 2026
27 May 2026
10 Jun 2026
27 May 2026
9 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete a Narrow Foundations - First Depth Upto 2m | 10 | m3 | - | - |
| 2 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 1 | m3 | - | - |
| 3 | Centering for Bed block, Lintel, Beam, Slab and Staircase slab plain surface including struttingslabs plain surface including strutting etc., complete cost and conveyanceof all materials to site and all labourcharges etc., complete. | 4 | m2 | - | - |
| 4 | Supply and fixing of 600mmX600mm Square RCC manhole cover with frame SFRC pipe IS 12592 | 1 | nos | - | - |
| 5 | Reinforced Cement concrete 1:1.5 :3 (one cement, one & half M.sand and three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 2 | m3 | - | - |
| 6 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour charges for cutting, bending & tying etc., complying with standard specifications - 1 Quintal | 2 | qtl | - | - |
| 7 | Fly ash Brick work in CM 1:5 (one cement & five sand) using size 9"X4 3/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT | 9 | m3 | - | - |
| 8 | Plastering with cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 10mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 20 | m2 | - | - |
| 9 | Plastering with C.M. 1:5 Mix (one cement and five sand) 12mm thick finishing including cost and conveyance of all materials to site and all labour charges, watering curing and all other incidental charges etc., complete complying with standard specification. | 62 | m2 | - | - |
| 10 | Supply and fixing of mild steel for Trusses and record rocks using all round angle with necessary arrangements including cost of steel and labour charges for welding etc., complete | 1,100 | kgs | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
TenderDocumentSingle.pdf
Tender Documents • 0.92 MB
ITB.pdf
Additional Documents • 0.20 MB
BOQ_815065.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .