| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC AT JHIRKEY PO KATHARA DIST BOKARO JHARKHAND | KATHARA | BOKARO | JHARKHAND | 829116 | L1 | Accepted-AOC AOC | |
| 2 | Rejected-Technical AT JHIRKEY PO KATHARA BOKARO | KATHARA | BOKARO | JH | 829116 | - | Rejected-Technical Rejected as not L1 | |
| 3 | Rejected-Technical | - | Rejected-Technical Rejected as not L1 |
Tender Value
Refer Docs
EMD Value
₹2,800
Closing Date
10 Nov 2023, 4:00 pmClosed
Project Engineer (EnM), Kathara Colliery
Project Engineer (EnM), Office of the PO, Kathara Colliery
Dismantling of 150 KVA transformer and installation and commissioning of 300 KVA, 440Volt transformer power supply to Jhirkey Basti Upper Mohalla (Islam Gali) under Kathara Colliery
2023_CCL_292544_1
KTC/PE(EnM)/E-Tender/23-24/162
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
Office of the Project Officer, PE (EnM), Kathara C
as per NIT
5 documents required · 5 mandatory
₹2,800
9 Jan 2024
1 Nov 2023
11 Nov 2023
2 Nov 2023
10 Nov 2023
2 Nov 2023
2 Nov 2023 - 8 Nov 2023
Amount
Dismantling of 150 KVA Transformer
Providing of copper clamp
Channel 6 inch x 21 .5 mtr
Hiring of crane (20 Tonne)
Suppling and making straight through jointing with heat srinkable kit including ferrules and other jointing materials for following size of PVC insulated and PVC sheathed/XLPE aluminum conductor cable of 1.1KV grade as required 120 Sq mm
Providing bof MCCB 800 Amp
Providing of iron frame and Angle
Copper Patti
Copper Lugs 400 Amp
Copper Lugs 120 Amp
Supplying and erection of galvanized D iron clamps complete with shackles insulator (100 mm x 110 mm ) GI bolts and nuts washers coach screws etc. As required
Supplying and erection of 100 mm X 80 mm pin insulator complete with G. I. Spindle and nuts etc. as required .
Nut bolt with washer as per required size
Erection of all aluminium /ACSR conductor of 7/2 11 mtr to 7/3.00 diameter and above including binding etc. As required = (6SPN x 4 wire x 75 mtr ) x 0.214 Kg /Mtrs + (2 % sagging + 2 % binding & jumpering ) = 400.60 Kg
Labour Charge:- A) Fitter 1 x 2 shift x 6 days
Labour Charge:- B) welder 1 x 2 Shift x 6 days
Labour Charge:- C) Helper 2 x 2 Shift x 6 days
Total impact of GST for the purpose of CTC
POLE STAR
M/S J.M.M ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .