Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 64 SHANKAR MARRIAGE HOME WEST ARJUN NAGAR AGRA | AGRA | AGRA | UTTAR PRADESH | Accepted-Technical Technical Bid responsive |
| 2 | Accepted-Technical 33 73 LATAKUNJ AJMER ROAD BALUGANJ AGRA 282001 | AGRA | UTTAR PRADESH | 282001 | Accepted-Technical Technical Bid responsive |
| 3 | Accepted-Technical | Accepted-Technical Technical Bid responsive |
| 4 | Accepted-Technical | Accepted-Technical Technical Bid responsive |
Tender Value
₹2.9 Cr
EMD Value
₹16.6 L
Closing Date
3 Nov 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Widening and strengthening of the road from ABK to Sakuri Kalan-Tarauli Gujar in Agra district. (Length-2.00 Km)
2026_CEAGR_1201377_1
5091/14M-AC/2026-27 dated 18-09-2026
Open Tender
Civil Works
Percentage
240 days
Agra
Widening and strengthening of
2 documents required · 2 mandatory
₹2,354
₹16.6 L
Yes
Agra
7 Nov 2026
28 Oct 2026
3 Nov 2026
29 Oct 2026
3 Nov 2026
29 Oct 2026
31 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. | 1,290 | Cum | 57 | ₹73,530 |
| - | Construction of embankment with approved material deposite site from roadway cutting and excavation from drain & foundation of other structures grade and compected to meet requirement of table 300-2 | - | Cum | 62 | - |
| - | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.(Carted earth) | 5,400 | Cum | 134 | ₹7,23,600 |
| - | Construction of Granular Sub-Base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clauses 401.As per MoRT&H clause 401(b) | 980 | Cum | 3,135 | ₹30,72,300 |
| - | Scarifying existing bituminous surface to a depth and disposal of scarified material within all lift and leads upto 1000 m as per Technical Specification Clause 305.4.3 | 1,680 | Sqm | 5 | ₹8,400 |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carries of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of all materials, T&P, labour, cartage for proper completion of work as per direction of Engineer-in-Charges. | 1,500 | Cum | 3,220 | ₹48,30,000 |
| - | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. | 8,800 | Sqm | 59 | ₹5,19,200 |
| - | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with Machenical control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.. Grading-II | 572 | Cum | 12,795 | ₹73,18,740 |
| - | Providing and applying tack coat with bitumen VG-10 @ 0.20kg. Per sqm on granular surface treated with primer & cleaned with mechanical broom including cost of bitumen, T&P and labour & all taxes complete For BC | 8,800 | Sqm | 17 | ₹1,49,600 |
| - | Providing and laying Bituminous Concrete with highier capacity batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.4 % of mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with Machenical Control to the required grade, level and alingment, rolling with smooth wheeled bibratory and tendom rollers to achiev the desired compection as per MORTH specifiaction clause 509 complete all respects. Grading-II | 264 | Cum | 14,925 | ₹39,40,200 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
T2ABKtoSakuri.pdf
Tender Documents • 1.70 MB
BOQ_2273334.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .