Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹171.1 CrAccepted-Finance 114B E SYKES EXTENSION KOLHAPUR MAHARASTRA | KOLHAPUR | MAHARASHTRA | 416001 | ₹171.1 Cr | 1st | Accepted-Finance Responsive being L1 and approved by DoWR |
| 2 | 2nd₹199.5 CrRejected-Finance | ₹199.5 Cr | 2nd | Rejected-Finance Bidders Stands L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per the recommendation of the TC Cum EC meeting held on 24.08.23 |
| 4 | Rejected-Technical 84 1A 3RD FLOOR TRINITY PLAZA TOPSIA ROAD SOUTH TOPSIA KOLKATA WEST BENGAL 700046 | KOLKATA | WEST BENGAL | 700046 | - | - | Rejected-Technical As per the recommendation of the TC Cum EC meeting held on 24.08.23 |
Tender Value
₹202.6 Cr
EMD Value
₹2.0 Cr
Closing Date
13 Jul 2023, 5:00 pmClosed
CEBM, SBB, Laxmiposi,
Office of the CEBM, SBB, Laxmiposi, Mayurbhanj 757107
Survey, Planning and Design of 5180 ha CCA Execution of UGPL Irrigation System OM for 5 Years
2023_CEBML_89730_1
05/23-24 of CEBM, SBB, Laxmiposi
National Competitive Bid
Civil Works - Canal
730 days
Basta
As per Technical Bid Criteria
5 documents required · 5 mandatory
₹10,000
₹2.0 Cr
Yes
Office of the CEBM, SBB, Laxmiposi
20 Oct 2023
9 Jun 2023
14 Jul 2023
9 Jun 2023
13 Jul 2023
9 Jun 2023
9 Jun 2023 - 17 Jun 2023
19 Jun 2023
Execution of canal distribution network including Command Area Development (CAD) works up to 1 hectare sub-chak for Basta Distributary from RD 2.007 Km to tail under Subarnarekha Irrigation Project through Under Ground Pipe Line System (Gravity Flow) for CCA of 5180 Ha on "EPC - Turn Key" basis to provide irrigation facility including Survey, investigation, planning, Designing, procurement of all material etc complete as per the relevant clauses of Technical Bid Document, guidelines of CWC, Govt. of India and IS standards.
Operation & Maintenance for Distribution Network including CAD works for 5180 Ha CCA of Basta Distributary from RD 2.007 Km to tail under Subarnarekha Irrigation Project through Under Ground Pipe Line System on "EPC - Turn Key" basis to provide successful irrigation for five years or five Khariff / five Rabi crop season whichever is later after commissioning of UGPL irrigation system as per the relevant clauses of Technical Bid Document and guidelines of CWC, Govt.of India.
Laxmi Civil Engineering Services Pvt Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid