Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹34.2 LAccepted-Finance | ₹34.2 L | 1 | Accepted-Finance Accept |
| 2 | 2₹34.7 LAccepted-Finance | ₹34.7 L | 2 | Accepted-Finance Accept |
| 3 | 3₹36.1 LAccepted-Finance | ₹36.1 L | 3 | Accepted-Finance Accept |
Tender Value
₹41.8 L
EMD Value
₹4.2 L
Closing Date
2 Feb 2026, 5:00 pmClosed
PD DUDA
Vikas bhawan Sitapur
Construction of CC road and nali from ajay muneem house to haji wakeel house
2026_SUDA_1106054_1
804/duda
Open Tender
Civil Works
Construction of interlocking of CC road and nali f
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Jila nagreey gareebi unmolan nidhi
₹4.2 L
21 Feb 2026
16 Jan 2026
3 Feb 2026
16 Jan 2026
2 Feb 2026
16 Jan 2026
Earth in cutting or embankment in ordinary soil excavation tobe done form of regular pits not exceeding 1/2 m. in depth and work of embankment to be in 20cm. Layers including ramming and dressing the surface to required levels and slopes and also including i.5 m. lift and 30m leadth cutting to be used in making embankment or to be deposited as spoil banks with in 30m. distance as directed by the Engineer in change. Carted from 4.00km distance
Exavation in Foundation Soil(laom clay or sand) including 1.5 m. lift and 30 m. lead & including filing watering and ramming of excaveted earth in to the Trencheses or in to the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed engineer in charge up to distance of 30 m. from foundation trenches.
Provoding and Laying in cement concrete 1:6:12 (1 cement : 6 fine sand : 12 graded brick aggregate 40mm. Nominal size) and curring complete including cost of form work in foundation and floors. Under wall
RCC work with cement approved c/sand &20mm approved stone blastin the proportion 1:1.5:3 with all comp.
RCC work with cement approved c/sand &20mm approved stone blastin the proportion 1:1.5:3 with all comp.raft
mild steel or iron in plane worksuch as reinforcement brick work (when not wrought to include in over all rate) with all Comp
Centering and shuttering including shuttering propping and removal of form for wall
Centering and shuttering including shuttering propping and removal of form for foundation
Centering and shuttering including shuttering propping and removal of form for slab
Consturction of granular sub- base by porviding well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC. And compacting with smooth wheel roller to achieve the desired density, complete as per Techncial Specification Clause 401.
cement concrete with 2cm gauge approved stone ballast in 1:1.5:3
S/l of 125 micron polythene
making of expansion joint
Sign Board
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_2040711.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid