Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33.3 LAdmitted-Fee/PreQual/Technical/Finance PLOT NO 1477 14754 SATYA BIHAR AT WARD NO 05 PO P S MANCHESWAR DISTRICT KHURDHA PIN 751010 | MANCHESWAR | KHURDHA | ODISHA | 751010 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹33.7 L+₹39,566.25 (1.19%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹34.1 L+₹70,685.76 (2.12%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹34.7 L+₹1.3 L (3.95%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹36.7 L+₹3.3 L (9.99%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹44.5 L
EMD Value
₹44,456
Closing Date
20 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DFO, Kataka Forest Division
O/o the DFO Kataka Forest Division
Building Work
2026_DFOCU_145885_1
DFO-KATAKA-01 OF 2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
O/o the DFO, Kataka Forest Division
As per DTCN
2 documents required · 2 mandatory
₹6,000
₹44,456
Yes
21 Nov 2026
11 Nov 2026
21 Nov 2026
11 Nov 2026
20 Nov 2026
11 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation of foundation in all kinds of soil up to the required depth including Moorum, stony earth and earth mixed with boulders except sheet rocks and boulders requiring blasting including dressing, leveling the bed and depositing the excavated materials away from work site with initial leads and lifts, T&P shoring, shuttering and dewatering if required etc, complete as directed by Engineer-in-charge. | 109.24 | Cum | 264.27 | ₹28,868.85 |
| 2 | Supplying, & filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyance, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work etc., complete (Measurement will be taken on finished compacted section) as per specification and direction of Engineer-in-charge. | 179.7 | Cum | 697.04 | ₹1,25,258.09 |
| 3 | Cement concrete (1:4:8) using 4cm(1½”) size hard crusher broken granite stone metal of approved quality and from approved quarry including lowering, laying concrete, watering, curing, centering & shuttering for covering columns, scaffolding etc, complete to required levels laid in layers not exceeding 0’-6” thick including cost, conveyances, royalties, taxes of all materials and cost of all labour with sundries, T&P required for the work etc, complete as per specification & direction of the Engineer-in-charge. | 27.16 | Cum | 6,279.26 | ₹1,70,544.7 |
| 4 | R.C.C work of M-20 Grade having a minimum compressive strength (in work test) 200kg/sqcm in 15cm cubes at 28 days after mixing and test conducted in accordance with IS 456 and IS516 using 20mm down graded size black hard crusher broken granite stone chips as per the design mix of approved quality and from approved quarry including hoisting, lowering, laying and compaction by using vibrators, watering, curing for 28days, centering, shuttering and finishing the exposed surface smooth, providing grooves or beads where necessary including cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of MS Rod or tor steel and binding wires & labour charges for bending binding and tying the grills etc. as per specification and direction of the Engineer-in-Charge. (i)Column Base & Footing | 32.32 | Cum | 7,018.48 | ₹2,26,837.27 |
| 4.1 | (ii)Grade Beam | 8.39 | Cum | 8,020.6 | ₹67,292.83 |
| 4.2 | (iii)Column in Super Structure | 6.65 | Cum | 16,598.56 | ₹1,10,380.42 |
| 4.3 | (iv)Lintel | 5.59 | Cum | 12,567.78 | ₹70,253.89 |
| 4.4 | (v)Wall beam | 13.33 | Cum | 16,598.56 | ₹2,21,258.8 |
| 4.5 | (vi)Stair Case | 5.39 | Cum | 15,380.2 | ₹82,899.28 |
| 4.7 | (viii)Roof slab | 41.87 | Cum | 12,955.56 | ₹5,42,449.3 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
DTCN_Conference_Hall.pdf
Tender Documents • 11.37 MB
BOQ_619929.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .