| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.1 LAccepted-AOC | ₹69.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹69.2 LRejected-AOC SANT KABIR NAGAR | UTTAR PRADESH | 272170 | ₹69.2 L | L2 | Rejected-AOC L2 |
| 3 | L2₹69.2 LRejected-Finance | ₹69.2 L | L2 | Rejected-Finance Dacument nat ok |
Tender Value
₹69.2 L
EMD Value
₹6.9 L
Closing Date
4 May 2026, 12:00 pmClosed
Executive Officer N P Jahangirganj
Office Nagar Panchayat Jahangirganj Ambedkar Nagar
Nagar Panchayat Jahangeerganj Ward no.16 me nariyaw gulraha me baba sukhdev mahavidyalay se nagar panchayat seema tak R.C.C. nala ka nirman karya.
2026_DOLBU_1135108_1
15/NPJ/E Tender2026-27 DATE-09/04/2026
Open Tender
Construction Works
Work
Please refer Tender documents.
2 documents required · 2 mandatory
₹9,794
Executive Officer Nagar Panchayat Jahangirganj
₹6.9 L
Yes
22 May 2026
9 Apr 2026
5 May 2026
9 Apr 2026
4 May 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/w excavation in foundaton in ordinary soil as per S.I. No-251 | - | m³ | - | - |
| 2 | Disposal of excavated material from site upto 5 Km 80% Qty of Excavation | 1 | m³ | - | - |
| 3 | Sand Filling in plinth under floors including watering, ramming, consolidation and dressing complete including lead upto 50m. And lift upto 1.5m. including cost of sand SI No. Sch PWD-255 Item No 4.24 + Ch.1 item no. 9 | 1 | m³ | - | - |
| 4 | Providing and laying Cement concrete 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone ballast 40 mm. nominal size) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation and floors. as per S.I.No-280 | - | m³ | - | - |
| 5 | R.C.C work with cement approved course sand and 2 cm {3/4") gauge approved stone ballast in the proportion of 1:1.5:3 in in RCC columns excluding supply of reinforcement & its bending but including its fixing & bending the same with 24 B.W.G. G.I. binding wire & including necessary centering & shuttering etc. & also including supply of all materials,labours and T&P etc. required for proper completion of the work . Binding wire cost being included in the item.As per S.I No. 284B for slabs Drain Cover | - | m³ | - | - |
| 6 | R.C.C work with cement approved course sand and 2 cm {3/4") gauge approved stone ballast in the proportion of 1:1.5:3 in in RCC columns excluding supply of reinforcement & its bending but including its fixing & bending the same with 24 B.W.G. G.I. binding wire & including necessary centering & shuttering etc. & also including supply of all materials,labours and T&P etc. required for proper completion of the work . Binding wire cost being included in the item.As per S.I No. 289 For RCC Columns | - | m³ | - | - |
| 7 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastages and over lapping and hookes. As per S.I No. 504 | - | qtl | - | - |
| 8 | Shifting of material including labour , machinery , cartage etc | - | job | - | - |
| 9 | Back filling & Surface levlling etc | - | m³ | - | - |
| 10 | Supply and fixing of inaguration stone board | - | job | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 38.51 MB
BOQ_2119213.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid