Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.4 LAdmitted-Fee/PreQual/Technical/Finance NA | NA | NA | 121004 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹7.7 L+₹1.3 L (20.6%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹7.7 L+₹1.3 L (20.6%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.1 L
EMD Value
₹8,200
Closing Date
17 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ZONAL_OFFICER_ZONE_14
No_ 6_64_ Puzhuthivakkam Main road Puzhuthivakkam Chennai 600 091
Z.O.XIV.C.NO.E1/6304/2026 Construction of Storm Water Drain of Size 900 X 900 mm at MGR Street 19m Road Cross and Kamarajar Street 8m Road Cross In Div-185, Unit-42, Zone-14
2026_CoC_703581_1
Z.O.XIV.C.NO.E1/6304/2026
Open Tender
Civil Works
Works
60 days
GREATER_CHENNAI_CORPORATION_ZONE_14
REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹0
₹8,200
18 Sept 2026
10 Sept 2026
18 Sept 2026
10 Sept 2026
17 Sept 2026
10 Sept 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Picking Existing Black Top Surface upto 2 to 5 cm | 50 | SQM | 21.86 | ₹1,093 |
| 2 | Earth work excavation for foundation by Mechanica...2.40m Footing Depth. (including Refilling charges) | 67 | CUM | 368.55 | ₹24,692.85 |
| 3 | Plain Cement Concrete 1:2:4 (one cement, two crush...departmental officers.-Mixing by mechanical means | 6 | CUM | 7,255.21 | ₹43,531.26 |
| 4 | Supplying and erecting centering for plane surface...g shall be given after the concrete is laid).SLAB | 134 | SQM | 1,069.07 | ₹1,43,255.38 |
| 5 | Providing and laying in position, standardised con...the Department for the excess usage of materials). | 21 | CUM | 8,015.86 | ₹1,68,333.06 |
| 6 | Supplying, fabricating and placing in position Rib...t and binding wire) Above plinth / Basement level | 2,100 | KGS | 98.7 | ₹2,07,270 |
| 7 | Supplying and fixing in position best quality PVC ...ines are proposed to laid below ground level 160mm | 7 | R/M | 1,190 | ₹8,330 |
| 8 | Supplying, laying and jointing PVC pipes (having w...ove ground level. For laying PVC pipes of dia 20mm | 9 | R/M | 187.77 | ₹1,689.93 |
| 9 | Providing Iron Barricading of size 2m width and 1 ... | 27 | R/M | 174.91 | ₹4,722.57 |
| 10 | Construction of cast -in- situ Silt Catch Pit of i...0mm) -10 MT -completing the finishing work etc. | 5 | EACH | 10,695.2 | ₹53,476 |
stage.html
html • 0.02 MB
finance_845695.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
6304.pdf
Tender Documents • 1.69 MB
BOQ_845695.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .