Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹11.6 LAccepted-Finance TIKAMGARH | MADHYA PRADESH | 472001 | ₹11.6 L | l1 | Accepted-Finance 1 |
| 2 | l2₹13.5 L+₹1.8 L (15.8%)Accepted-Finance | ₹13.5 L+₹1.8 L (15.8%) | l2 | Accepted-Finance 2 |
| 3 | l3₹15.0 L+₹3.3 L (28.5%)Accepted-Finance INDRA AWAS COLONY SANWASA TEHSIL LALSOT DISTRICT DAUSA RAJASTHAN | ₹15.0 L+₹3.3 L (28.5%) | l3 | Accepted-Finance 3 |
| 4 | l4₹15.5 L+₹3.8 L (32.8%)Accepted-Finance | ₹15.5 L+₹3.8 L (32.8%) | l4 | Accepted-Finance 4 |
| 5 | l5₹15.6 L+₹4.0 L (34.2%)Accepted-Finance M S SHREE SANWARIYA CONSTRUCTION COMPANY BOONDI RAJASTHAN | ₹15.6 L+₹4.0 L (34.2%) | l5 | Accepted-Finance 5 |
Tender Value
₹18.6 L
EMD Value
₹37,201
Closing Date
19 May 2026, 6:00 pmClosed
Ex. En WDSC Kekri
P.S. Kekri
Construction of Sunkan pond, MPT,Talai
2026_WDSC_557899_1
NIT-4/2026-27/Kekri
Open Tender
Civil Works
Percentage
GP of Kekri
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Secretary, RREIS
₹37,201
Yes
14 Aug 2026
10 May 2026
20 May 2026
10 May 2026
19 May 2026
10 May 2026
10 May 2026 - 19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | जंगल की सफाई, भारी झाडि़यों तथा 30 सेमी लपेट तक के पौधों को काटने समेत। | - | Sqm | 3.6 | - |
| - | taxy dh lQkbZ o lk/kkj.k ouLifr rFkk >kfM;ksa dks dkVus lfgrA | 1 | Sqm | 2.86 | ₹2.86 |
| - | Dag belling 5 cm to 7.5 cm Deep | - | Mtr | 1.71 | - |
| - | Benching base and depositing the excavated material including dressing etc. complete within initial lead up to 50 mt and lift up to 1.5 m | 1 | Cum | 97 | ₹96.9 |
| - | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) | 1 | Cum | 59.76 | ₹59.7 |
| - | Compaction of earth or highly weathered strata by manually or plain roller. (Density 90% proctor) | - | Cum | 25 | - |
| - | Watering of earth including cost of carriage of water when source of water is up to 1km | - | Cum | 12.6 | - |
| - | 15 से 30 सेमी मोटे हथोड़े से तरासे हुए एकल पत्थर की पिचिंग समस्त उठान के साथ, आपूर्ति के साथ । | - | Cum | 1,185.7 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.94 MB
BOQ_993233.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .