| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC | ₹9.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.3 L+₹54,669 (5.60%)Rejected-AOC | ₹10.3 L+₹54,669 (5.60%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | OM VINAYAGA CONSTRUCTIONS L1 | PITCHAIMANI N L2 |
|---|---|---|---|---|---|
| 1.01 | Charges for Putting borehole of size 23 / 30 cm dia for file foundation in Sandy and Other loose soil by using hand Boxing set Rate Shall be include the cost of Labour for Boxing Fule Charges for Auger Bore and Other T & P Employed etc., complete | 17 | M | 397.8 ₹6,762.6 Lowest | 420.1 ₹7,141.7 |
| 2.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 | 3 | M3 | 214.3 ₹642.9 Lowest | 226.3 ₹678.9 |
| 3.01 | Supplying and filling in foundation and basement with Quary Dust in layers of 15cum thick well rammed and consolidated including watering complying with std. specification etc. | 1 | M3 | 418.1 ₹418.1 Lowest | 441.5 ₹441.5 |
| 4.01 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. | 1 | M3 | 5,664.2 ₹5,664.2 Lowest | 5,981.4 ₹5,981.4 |
| 5.01 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2. | 16 | M2 | 1,121.9 ₹17,950.4 Lowest | 1,184.7 ₹18,955.2 |
| 6.01 | Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete in F&B | 4 | M3 | 9,330.7 ₹37,322.8 Lowest | 9,853.2 ₹39,412.8 |
| 7.01 | Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm Dia | 480 | Kg | 93.7 ₹44,976 Lowest | 98.9 ₹47,472 |
| 8.01 | Brick work in CM 1:5 (One cement and five sand) using country bricks of size 8 3/4"X4 1/2"X2" including curing etc., complete For Foundation and Basement. | 4 | M3 | 6,535.8 ₹26,143.2 Lowest | 6,901.8 ₹27,607.2 |
| 9.01 | Plastering with CM1:5(one cement and five sand) 12mm thick10m2. | 33 | M2 | 291.5 ₹9,619.5 Lowest | 307.8 ₹10,157.4 |
| 10.01 | Painting two coats with ready mixed Plastic Emulsion Paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. - 10 sq.m | 33 | M2 | 242.7 ₹8,009.1 Lowest | 256.3 ₹8,457.9 |
Tender Value
₹9.8 L
EMD Value
₹9,791
Closing Date
4 Jul 2025, 3:00 pmClosed
Commissioner Madurai Corporation
Aringar Anna Maligai Thallakulam Madurai
Upgradation of UPHC building and construction of compound wall in UPHC building at fathima nagar in ward 63
2025_MAWS_572573_1
E1/EST- 59/ 2025-26
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹9,791
21 Aug 2025
23 Jun 2025
4 Jul 2025
23 Jun 2025
4 Jul 2025
23 Jun 2025
Amount
Charges for Putting borehole of size 23 / 30 cm dia for file foundation in Sandy and Other loose soil by using hand Boxing set Rate Shall be include the cost of Labour for Boxing Fule Charges for Auger Bore and Other T & P Employed etc., complete
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3
Supplying and filling in foundation and basement with Quary Dust in layers of 15cum thick well rammed and consolidated including watering complying with std. specification etc.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete.
Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor). The payment for centering shall be given after the concrete is laid. (Lintel & Sunshade) using steel plates10m2.
Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete in F&B
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm Dia
Brick work in CM 1:5 (One cement and five sand) using country bricks of size 8 3/4"X4 1/2"X2" including curing etc., complete For Foundation and Basement.
Plastering with CM1:5(one cement and five sand) 12mm thick10m2.
Painting two coats with ready mixed Plastic Emulsion Paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. - 10 sq.m
Suplying fabricating erecting of ornamental grill work (for required Size 2.30 X 0.60 cm) for compound top welded type using MS channel angle flat and squire bars etc., conforming to IS specification Including primer coating and enamal painting as per design given by the departmental officers etc., complete
Supplying and fixing collapsible steel gate including 30 to 40 cm head fixed ornamental grills in two halves with pickets vertical in double channel (picket channel) 19 x 9mm at 10cm apart with three rows of lattice 19 x 4. 5mm riverted with 6mm dia pins etc. The gate is to be provided with 4 cm dia. Wheels fixed to the pickets at the bottom of each shutter at convenient and suitable places for easy movement of the gate. wheels and pickets are to move on flats 39 x 6mm and 12 x 25mm arranged as "TEES' both at top and bottom, where the bottom frame 'TEE' be made into two halves and foldable etc. The gate shall be provided with brass handle latch etc. and it shall also be free from shakes and rattles and should be thoroughly rigid. The gate shall be painted with a priming coat of red oxide without lock.
Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors.
Weathering Course with Concrete Broken Brick (S.I.No.278) & (P & D) Data 54.Jelly 20mm gauge in pure slaked lime (no sand to be added) 25 over roof slab, the proportion of brick jelly to lime being "32 to 12.5 well beated with wooden beaters for giving required slope and thickness as directed by the departmental officers etc., complete.-
Finishing the top of roof with one course of machine pressed tiles of size 200 mm x 200 mm x 20 mm of approved quality in Cement Mortar 1:3 (One Cement add three sand) 12 mm thick mixed with water 26 proofing compound conforming to ISS at 2% by weight of cement used. and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete
Add GST 18%
PITCHAIMANI N (BID ID -1390200)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .