| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-AOC | ₹27.7 L | L1 | Accepted-AOC Due to lower rate in BOQ |
| 2 | L2₹30.5 LRejected-Finance WARD 04 TOWN SIWALKHAS BAGHPAT ROAD MEERUT | ₹30.5 L | L2 | Rejected-Finance Due to lower rate in BOQ |
Tender Value
₹33.8 L
EMD Value
₹3.4 L
Closing Date
24 Mar 2026, 12:00 pmClosed
Executive Engineer
Office of the Executive Engineer, PD, PWD, Gautambudhnagar
Repair and Safety Work at Minor Bridge at Kot ke Pul to Bhogpur Road in District Gautambudhnagar
2026_CEMRT_1126806_5
725/7A Dated 12.03.2026
Open Tender
Civil Works - Bridges
90 days
Gautambudhnagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹944
₹3.4 L
Gautambudhnagar
2 Jun 2026
18 Mar 2026
24 Mar 2026
18 Mar 2026
24 Mar 2026
18 Mar 2026
20 Mar 2026
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy. As per Specification 2800. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST.
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST.
Brick masonry work in cement mortar (1:3) in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST.
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST.
Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical Specification 2807. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST.
RCC M25 Providing concrete for Plain/Reinforced cement concrete in super structure complete as per drawing and technical specifications Clauses 802, 803, 1202 & 1203 Sr. No. 13.1 Ref. No. 800 (M-25). Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 110 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications MORTH 13.08 (2706 & 2200). Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST.
Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. As per specification no. 800. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tendernotice_2.pdf
PDF • 1.18 MB
BOQ_2101454.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid