Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹9.8 L+₹1.3 L (15.3%)Rejected-Finance AT SAREILO PO TALCHER DIST ANGUL ODISHA 759100 | TALCHER | ANGUL | ODISHA | 759100 | L2 | Rejected-Finance L2 BIDDER |
Tender Value
₹11.9 L
EMD Value
₹15,000
Closing Date
20 Apr 2026, 5:00 pmClosed
HOD Civil
Office of HOD Civil
Annual Maintenance Contract for Civil works at CMPDI Exploration Camp Talcher for two years
2026_CMPDI_357954_1
CMPDI/RI-VII//Camps/ Civil
Open Tender
AMC WORKS
Percentage
730 days
Talcher Exploration Camp
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
18 Jun 2026
10 Apr 2026
21 Apr 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
10 Apr 2026 - 17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item Description/ Heading | - | - | - | - |
| - | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | Cum | - | - |
| - | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | - | Cum | - | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| - | Providing, hoisting and fixing up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like including the cost of required centering, shuttering but excluding cost of reinforcement,
1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) | - | Cum | - | - |
| - | Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete -
Thermo-Mechanically Treated bars | - | Cum | - | - |
| - | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level: 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| - | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | - | sqm | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.14 MB
BOQ_370836.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .