Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | ₹2.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.6 L+₹56,730.50 (28.1%)Rejected-Finance | ₹2.6 L+₹56,730.50 (28.1%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.8 L+₹73,767 (36.5%)Rejected-Finance | ₹2.8 L+₹73,767 (36.5%) | L3 | Rejected-Finance L3 |
Tender Value
₹2.6 L
EMD Value
₹5,000
Closing Date
10 Aug 2021, 5:00 pmClosed
Executice EngineerProvincial Division No 1 Karnal
Executice Engineer Provincial Division No 1 Karnal
DNIT for construction of 2 dia Hume Pipe culvert on various places in Karnal District
2021_HRY_181782_1
DNIT for construction of 2 dia Hume Pipe culvert
Open Tender
Civil Works
Works
30 days
DNIT for construction of 2 dia Hume Pipe culvert
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Yes
₹5,000
Yes
19 Oct 2021
31 Jul 2021
11 Aug 2021
31 Jul 2021
10 Aug 2021
31 Jul 2021
Amount
Earth work in excavation in foundations, trenches etc. in all kind of soils, not exceeding 1.5 metres depth including dressing of bottom and sides of trenches, staking the excavated soil clear from the edge of excavation and subsequent filling around masonry, in 15cm layers with compaction, including disposal of all surplus soil, as directed with in a lead of 30 metres. (HSR 4.14)
Cement concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone cum aggregate 40 mm nominal size) (HSR 6.1.8)
Brick work with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth in: (HSR 7.21.1) Cement mortar 1:4 (1 cement: 4 coarse sand)
Cement pointing 1 :2 on lining (HSR.14.23.1)
Providing and Laying 600 mm dia Reinforced 2900 Cement Concrete Pipe NP3 / NP-4P /prestressed Concrete Pipe on First Class Bedding in Single Row Providing and Laying Reinforced cement concrete pipe NP3 /NP-4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1 :2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets 1000 mm dia, as per clause 2900 of MORT&H specifications (HSR17.61.1) Note:- In case of any difference in the unit & nomenclature of any of the HSR items depicted in this DNIT and that given in HSR. the unit and nomenclature given in HSR Shall be applicable. ii) In case of any difference in the unit of any Non- schedule items depicted in this DNIT and the Conventional unit of that N.S Item as per practice in this department the conventional unit as per practice shall be applicable.
Sh. Pankaj Kumar Dixit
Prabhu Dayal
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .