Construction of New Double Line between New Palghar & Vadhavan Port (Varor Station) including Electrification works in Mumbai Division of Western Railway
DyCE-C-CCG-358-EPC
DyCE-C-CCG-358-EPC
Open
30 Months
Palghar, Maharashtra
₹0
₹14.7 Cr
16 Jun 2026
16 Jun 2026
30 Sept 2026
31 Jul 2026
Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and 1 consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. All kinds of soils
Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and 2 consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. Soft rock (not requiring blasting)
Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and 3 consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. Hard rock (requiring blasting)
Providing and laying in position Plain cement concrete of specified Nominal Mix for miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved 5 proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
Conducting load test of a single pile up to specified capacity in accordance with IS:2911 6 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer. Initial load test above 100 ton and up to 250 T capacity pile
Conducting load test of a single pile up to specified capacity in accordance with IS:2911 7 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer. Extra for every increase of 50 ton in pile capacity or part thereof over 250 ton
Boring, providing and installation of bored cast in-situ Reinforced Cement Concrete piles of specified diameter and length below pile cap of specified grade with Design Mix Cement Concrete, using 20mm graded crushed stone aggregate and coarse sand of approved quality, to carry a safe working load not less than specified, concreting by machine batching, machine mixing, scaffolding, using Admixture in approved proportion (as per IS:9103), placing with tremie pipe, chipping off of pile top to remove laitance 8 concrete above cut off level etc., pumping and bailing out water, by percussion drilling using Direct Mud Circulation (DMC) or Bailor and Chisel technique by tripod and mechanical Winch machine, complete in all respect as per approved drawing, specification and direction of the Engineer in charge. Note: 1. Payment for only cement, reinforcement and permanent casing pipe (if any ) shall be made extra. 2. Length of the pile for payment shall be measured up to the bottom of RCC pile cap. 3. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. 1200mm diameter
Centering and shuttering including strutting, propping etc. and removal of form for : All types 9 of bridge sub-structures, e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level
Providing and applying two coats of coal tar or bitumen confirming to IS:3117- latest version on the top and sides of RCC box/slabs @ 1.70 kg/sqm after cleaning the surface with all labour and materials complete job as directed by the Engineer.
Supply and using Cement at Worksite Ordinary Portland Cement 53 grade of approved brands/makes
Providing, fabricating and installing permanent casing pipe for bored piles for all diameters 12 with specified thickness of steel plate including all labour, materials, tools & complete as per approved drawing & specifications complete in all respect as per the direction of Engineer in charge. Note: Payment shall be made as per the weight of circular plate of casing pipe only. Unit Above/
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
1-L-SECTIONSHEETNO1-0kmto5km.pdf
ATTACHMENT
L-SECTIONSHEETNO2-5kmto10km_2.pdf
ATTACHMENT
L-SECTIONSHEETNO3-10kmto15km_1.pdf
ATTACHMENT
4-L-SECTIONSHEETNO4-15kmto20km.pdf
ATTACHMENT
L-SECTIONSHEETNO5-20kmto22.40km_1.pdf
ATTACHMENT
ALIGNMENTPLAN-VangaontoVadhavanport_2.pdf
ATTACHMENT
VARORESP-YARD-_1.pdf
ATTACHMENT
VPPLHOLDINGYARD_1.pdf
ATTACHMENT
9-KEYPLANFORDEVELOPMENTOFRAILWAYCONNECTIVITYTOGREENFEILDVADHAVANPORT.pdf
ATTACHMENT
10-BRIDGENO5MINOR.pdf
ATTACHMENT
11-BridgeNo46RUB-sheet1.pdf
ATTACHMENT
12-BRIDGENO47-MAJORSHHET-1.pdf
ATTACHMENT
13-BridgeRFORORBrNo13sheet1of3.pdf
ATTACHMENT
14-BRIDGERFORORBR.NO.13-1sheet.pdf
ATTACHMENT
15-BRIDGERFOROR-BR.NO.13-2sheet.pdf
ATTACHMENT
16-GAD-BRIDGENo2minor-sheet1.pdf
ATTACHMENT
17-GADROADUNDERBRIDGE-sheet1-.pdf
ATTACHMENT
18-GADBridgeNo13-sheet3.pdf
ATTACHMENT
19-GADFORRCCBOX-MonorBr16-18-23-24-33-38-40-41-45-49.pdf
ATTACHMENT
20-GADFORRCCBOX-MinorBr7-14-19-21-29-35-37-42-48-50-52.pdf
ATTACHMENT
21-GADFORRCCBOXMonorBr27-31.pdf
ATTACHMENT
22-GADRUBBRNO1RCCBOX.pdf
ATTACHMENT
23-GAD-RUBBrNo10-15-22-25-28-32-34-39-44-46.pdf
ATTACHMENT
24-GAD-RUB-BrNo9-11-12-20-30-43.pdf
ATTACHMENT
25-GAD-RUB-CompositegirderBrNo36-51.pdf
ATTACHMENT
26-ROADOVERBRIDGE-6-Compositegirder-Sheet-1.pdf
ATTACHMENT
Geotechreport.pdf
ATTACHMENT
EPCdocument16-6-2026.pdf
ATTACHMENT
RFPdocument_1.pdf
ATTACHMENT
Download all tender documents and submit your bid