| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.3 LAccepted-AOC | ₹27.3 L | L1 | Accepted-AOC AOC |
| 2 | L2₹27.3 L+₹81.91 (<0.01%)Rejected-Finance | ₹27.3 L+₹81.91 (<0.01%) | L2 | Rejected-Finance Due To Second Lowest |
| 3 | L3₹28.9 L+₹1.6 L (6.00%)Rejected-Finance | ₹28.9 L+₹1.6 L (6.00%) | L3 | Rejected-Finance Due To Third Lowest |
| 4 | L4₹29.2 L+₹1.9 L (7.00%)Rejected-Finance | ₹29.2 L+₹1.9 L (7.00%) | L4 | Rejected-Finance Due To Fourth Lowest |
| 5 | L5₹30.0 L+₹2.7 L (9.99%)Rejected-Finance | ₹30.0 L+₹2.7 L (9.99%) | L5 | Rejected-Finance Due To Fifth Lowest |
Tender Value
₹27.3 L
EMD Value
₹27,302
Closing Date
19 Feb 2026, 6:00 pmClosed
CEO ZP PALGHAR
CEO OFFICE ZP PALGHAR
Providing Water Supply Arrangement to Guhir New Ashram School Building Tal. Wada Dist. Palghar
2026_PALGH_1276883_1
PZP/RWSD/PWSG/22/2025-26
Open Tender
Civil Works - Water Works
Percentage
180 days
Guhir
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,360
₹27,302
24 Aug 2026
12 Feb 2026
20 Feb 2026
12 Feb 2026
19 Feb 2026
12 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sub Estimate No.1 :- Repairing of Existing Well
Item no.1:- Providing flush grooved pointing with cement mortar 1:3 for stone masonry work including scaffolding and curing etc. complete | 228.91 | Sqm | 200.2 | ₹45,827.78 |
| 2 | Item No. 2:- Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices inclu-ding disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. | 150 | Bhp/Hr | 97.9 | ₹14,685 |
| 3 | Item No.3: Desilting the Supply Well, Intake Well / Head Works, sump of watersupply/ sewerage works etc. in wet or dry condition including lifts upto 9 M and lead upto 150 M as required beyond the work site, stacking, spreading, including necessary guarding, etc. complete, | 50.24 | Cum | 859.1 | ₹43,161.18 |
| 4 | Item No.4: Providing and fixing crimpe dwith G.I.mesh and size 2 0mm x 20mm 10 guage to iron angle frame including welding crim pmesh to angle frame and steel flat,fixing the frame in its original position and oil painting etc.complete ( excluding cost of structural steel) etc. complete.. | 50.24 | Sqm | 845.9 | ₹42,498.02 |
| 5 | Item No.5:Providing structural steel work in rolled sections like joists, channels, angles, tees, etc. as per detailed designs and drawings including fixing in position without connecting plates, braces, etc. and one coat of anticorrosive paint and over it two coats of oil painting, of approved quality and shade, etc. complete. | 1 | MT | 89,542 | ₹89,452.46 |
| 6 | Sub Estimate No.2:- Solar Based Pumping Machinery
ITEM NO.1 FOUNDATION FOR MANUAL TRACKER
1) Excavation for foundation/pipe trenches in earth,soils of all types,sand,gravel and soft murum,inluding removing the excavated materials upto a distance of 50 metres and lift as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding back filling, etc complete. | 4.1 | Cum | 181.5 | ₹744.15 |
| 7 | 2) Excavation for foundation/pipe trenches by means in hard murum,inluding removing the excavated materials upto a distance of 50 metres and lift as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding back filling, etc complete. | 12.29 | Cum | 205.7 | ₹2,528.05 |
| 8 | 3) Providing dry trap/granite/quartzite/gnesis, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, royalty charge etc complete. | 3.01 | Cum | 1,447.6 | ₹4,357.28 |
| 9 | 4) Providing & Laying in situ following M-150 grades of C.C of trap/granite/quartzite/ gneiss metal for foundation and bedding including dewatering, form work, compacting and curing, finishing etc complete. | 1.02 | Cum | 6,469.1 | ₹6,598.48 |
| 10 | 5) Providing & laying in situ Cement Concrete of trap / granite / quartzite /gneiss metal for RCC work in foundation like raft,grillage,strip foundation and footing of RCC coloumns and steel stanchions including normal dewatering, plywood formwork, bully/steel prop-ups, compactions, finishing and curing etc complete(excluding M.S or Tor reinforcement) M-250 | 2.19 | Cum | 8,719.7 | ₹19,096.14 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
B1TenderForm.pdf
Other Document • 1.61 MB
GuhirTC.pdf
Tender Documents • 0.99 MB
BOQ_2197212.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .