Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | -31.50% | ₹2.0 L | L1 | Admitted-Finance |
| 2 | L2₹2.3 L+₹25,440.03 (12.7%)Admitted-Finance | -22.79% | ₹2.3 L+₹25,440.03 (12.7%) | L2 | Admitted-Finance |
| 3 | L3₹2.3 L+₹33,589.02 (16.8%)Admitted-Finance | -20.00% | ₹2.3 L+₹33,589.02 (16.8%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-not uploaded yearly affidavit |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
3 Aug 2026, 2:00 pmClosed
Executive Engineer
Executive Engineerirrigation division doda
Restoration/Improvement of Jangalwar Khul at different Spots. ( District Capex)
2026_IFC_318357_1
e-NIT No.17 of 2026-27 dated 28-07-2026
Open Tender
Civil Works
Percentage
Doda
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
executive engineer irrigation doda
₹6,000
Yes
5 Aug 2026
28 Jul 2026
3 Aug 2026
28 Jul 2026
3 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc ( not exceeding 1. 5 M in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan ,depth upto 1.5 Mt including drressing of sides and ramming of bottoms lift upto 1.5 including getting out excavated earth and disposal of surplus excvated earth as directed: in all kinds aof soil, in 1 meter form cutting edge. | 16.82 | cum | 479.3 | ₹8,061.83 |
| 1.02 | Random Rubble masonry with hard stone in foundation and plinthincluding leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level level with 1:6 mix mortar. | 25.2 | cum | 5,402.9 | ₹1,36,153.08 |
| 1.03 | Dry random rubble masonry with hard stone in foundation and plinth using nallah stone with out bond stone. | 9 | cum | 2,793.8 | ₹25,144.2 |
| 1.04 | Providing and laying in position cement concrete (Bed) of specified grade including curing but excjing the cost of centring and shuttering . All work upto plinth lev el with 1:4:8 (1 Cement: 4 Coares sand : 8 graded stone aggregate 40 mm nominal size). | 5.12 | cum | 5,202.9 | ₹26,638.85 |
| 1.05 | providing and laying Coping /D.P.C 40 mm thick with cement concrete 1:2:4 (1 Cement (2.coarse sand (4 cparse sand : 8 graded stone aggregate 40 mm nominal size). | 28.6 | sqm | 346.7 | ₹9,915.62 |
| 1.07 | Providing and laying of 40mm thick Flooring in 1:2:4 mix including curing complete. | 21 | sqm | 510.25 | ₹10,715.25 |
| 1.08 | Providing and laying of 12 mm thick Plastering in M 15 grade (1.4) mix including curing complete. | 37 | sqm | 283.8 | ₹10,500.6 |
| 1.09 | Carriage of cement from source to the site of work at an avg. distance of 5 km by MT and 800m by HL. | 3.84 | MT | 550.4 | ₹2,113.54 |
| 1.1 | Carriage of stone from source to the site of work an average distance 1 KM by H/L | 34.2 | cum | 1,212.68 | ₹41,473.66 |
| 1.11 | Carriage of Sand & Bajree at an avg. distance of 10 km by MT and 800 m by HL. | 18.82 | cum | 1,135.06 | ₹21,361.83 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_1048342.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .