Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Fee/PreQual/Technical/Finance | -26.00% | ₹4.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.9 L+₹52,895.44 (12.2%)Admitted-Fee/PreQual/Technical/Finance | -17.00% | ₹4.9 L+₹52,895.44 (12.2%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹5.0 L+₹64,708.76 (14.9%)Admitted-Fee/PreQual/Technical/Finance NOT AVAILABLE | -14.99% | ₹5.0 L+₹64,708.76 (14.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹5.0 L+₹64,708.76 (14.9%)Admitted-Fee/PreQual/Technical/Finance | -14.99% | ₹5.0 L+₹64,708.76 (14.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L4₹5.3 L+₹96,974.99 (22.3%)Admitted-Fee/PreQual/Technical/Finance | -9.50% | ₹5.3 L+₹96,974.99 (22.3%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.9 L
EMD Value
₹5,900
Closing Date
10 Jul 2026, 3:00 pmClosed
ZONAL OFFICER VIII
NO-36 B,PULLA AVENUE ,SHENOY NAGAR ,CHENNAI-600030
REWORK OF FUEL BUNK SHED AT MECHANICAL LORRY STATION IN DN-102, U-22, Z-8.
2026_CoC_682995_1
Z.O.VIII.C.NO.E1/4951/2026
Open Tender
Civil Works
Works
120 days
GREATER CHENNAI COPORATION ZONE-VIII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,900
10 Jul 2026
27 Jun 2026
10 Jul 2026
27 Jun 2026
10 Jul 2026
27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling - Brick / Stone Masonry in cement mortar walls under 3m high | 5 | CUM | 302.96 | ₹1,514.8 |
| 2 | Plastering - Clean removal of cement plaster from walls and racking out joints 20mm deep | 4 | SQM | 12.01 | ₹48.04 |
| 3 | Dismantling - Floor finish & dadooing walls i...Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs | 24 | SQM | 65.56 | ₹1,573.44 |
| 4 | Dismantling - Corrugated Iron Sheet Roofing over Pan Tiles without roof timbers | 26 | SQM | 32.01 | ₹832.26 |
| 5 | Brick work in following Cement Mortar using best q...Executive Engineer in charge. In Cement Morter 1:5 | 1 | CUM | 7,935.89 | ₹7,935.89 |
| 6 | Plastering the surface of walls with Cement Morta...directed by the departmental officers. (sump wall) | 14 | SQM | 653.04 | ₹9,142.56 |
| 7 | Cement Concrete 1:5:10 (One cement, Five crushed ...partmental officers - Mixing by mechanical means | 3 | CUM | 5,756.01 | ₹17,268.03 |
| 8 | Paving the floor with pre-polished concrete anti-...pproved by Executive Engineer before use on works) | 24 | SQM | 1,578.33 | ₹37,879.92 |
| 9 | Painting New Plastered Wall Surface with Two finis...ed by the Executive Engineer before use on works.) | 14 | SQM | 201.05 | ₹2,814.7 |
| 10 | Painting Old iron works such as steel doors...ed by the Executive Engineer before use on works.) | 22 | SQM | 157.96 | ₹3,475.12 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
BOQ_821041.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .